Search Contract Opportunities

Riverside Levees PL 84-99 Rehabilitation Project   2

ID: W912PL22B0002 • Type: Presolicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Riverside Levees 1 & 2 Rehabilitation Project

The Riverside Levees were federally constructed in 1959. The levees are located along the Santa Ana River adjacent to the City of Riverside, CA. The general work for the project includes dewatering, removal and disposal of the existing riprap and replacement with 24-inch grouted and ungrouted stone that extend from the expected scour depth to 5 feet below the top of the levee and from 5 feet below the top of the levee to the levee top, respectively; adding a bedding layer behind the grouted and ungrouted stone; installing filter fabric underneath the bedding layer; and, providing two sub-drain systems and weep holes behind and through the grouted stone. In addition, the scope of work also includes the ABC (aggregate base course) levee crest maintenance roads, geotechnical instrumentation, shoring, temporary access ramps, temporary diversion channels and fences associated with reconstruction of the levees.

This acquisition is being solicited as an Unrestricted IFB and will be awarded under FAR Part 14 Sealed Bidding.

The estimated magnitude of construction for this project is between $25,000,000.00 and $100,000,000.00.

The total contract performance period is 1460 calendar days.

BIDDERS PLEASE NOTE: This solicitation will be issued as an Unrestricted acquisition allowing for Full and Open Competition. Contract Clause No. FAR 52.219-4, entitled, Price Evaluation Preference for HUBZone Small Business Concerns will be applied to this procurement. The acquisition will use FAR Part 15 Contracting by Negotiation (Low Price Technically Acceptable) procedures for award. Offerors will be required to submit a technical and price proposal for source selection evaluation. The solicitation will be available on or about February 28, 2022. All offerors are advised that this project may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process.

Overview

Response Deadline
March 31, 2022, 4:00 p.m. EDT Past Due
Posted
Feb. 10, 2022, 11:02 a.m. EST
Set Aside
None
Place of Performance
Riverside, CA United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Odds of Award
81%
On 2/10/22 USACE Los Angeles District issued Presolicitation W912PL22B0002 for Riverside Levees PL 84-99 Rehabilitation Project due 3/31/22. The opportunity was issued full & open with NAICS 237990 and PSC Y1PZ.
Primary Contact
Name
Stanislav Sekacov   Profile
Phone
(213) 452-3216

Secondary Contact

Name
James M. Costantino   Profile
Phone
None

Documents

Posted documents for Presolicitation W912PL22B0002

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Presolicitation W912PL22B0002

Contract Awards

Prime contracts awarded through Presolicitation W912PL22B0002

Protests

GAO protests filed for Presolicitation W912PL22B0002

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation W912PL22B0002

Similar Active Opportunities

Open contract opportunities similar to Presolicitation W912PL22B0002

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > W075 ENDIST LOS ANGELES
FPDS Organization Code
2100-W912PL
Source Organization Code
100221424
Last Updated
April 15, 2022
Last Updated By
james.m.costantino@usace.army.mil
Archive Date
April 16, 2022