Search Contract Opportunities

Rio Puerto Nuevo Flood Control Project, Supplemental Contract 3: Channel Bottom and Wall Improvements Project Location: San Juan, Puerto Rico   2

ID: W51DQV25RA002 • Type: Solicitation • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Posted: July 17, 2025, 2:56 p.m. EDT
This solicitation with all associated attachments will be available for download from www.SAM.gov by 26 June 2025. Attachments will be available before the close of business (5:00 p.m. Atlantic Standard Time). Please continue to monitor the SAM.gov website. PROJECT TITLE: RIO PUERTO NUEVO FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 3: CHANNEL BOTTOM AND WALL IMPROVEMENTS PROJECT LOCATION: SAN JUAN, PUERTO RICO.
Posted: July 10, 2025, 12:14 p.m. EDT
Posted: June 26, 2025, 5:00 p.m. EDT
Posted: June 26, 2025, 4:22 p.m. EDT
Posted: June 18, 2025, 3:37 p.m. EDT
Posted: June 18, 2025, 12:37 p.m. EDT
Posted: June 17, 2025, 3:19 p.m. EDT
Posted: June 4, 2025, 1:09 p.m. EDT
Posted: May 22, 2025, 12:08 a.m. EDT
Posted: May 20, 2025, 10:02 a.m. EDT
Posted: May 19, 2025, 4:44 p.m. EDT
Posted: May 19, 2025, 1:33 p.m. EDT
Background
The Rio Puerto Nuevo Flood Control Project is being issued by the Caribbean District, with the goal of enhancing flood control measures in San Juan, Puerto Rico. This specific solicitation pertains to Supplemental Contract 3, which focuses on channel bottom and wall improvements. The project aims to address critical infrastructure needs and improve the overall flood management system in the region.

Work Details
The scope of work includes:
- Installation of a utility bridge, sanitary siphon, and relocation of a 48-inch water main;
- Construction of drilled shaft walls using slurry fluids;
- Implementation of noise and vibration controls during installations;
- Erosion control placement in wet conditions;
- Water diversion and surface/groundwater control;
- Electrical utility relocation with coordination with local agencies;
- Material excavation and disposal using barges and trucking methods.

The contractor must also provide performance and payment bonds as required.

Period of Performance
The contractor is expected to begin performance within 10 calendar days after receiving the notice to proceed and complete the work within 2190 calendar days.

Place of Performance
The construction projects will be performed in San Juan, Puerto Rico.

Overview

Response Deadline
July 29, 2025, 4:00 p.m. EDT (original: July 3, 2025, 10:00 a.m. EDT) Past Due
Posted
May 19, 2025, 1:33 p.m. EDT (updated: July 17, 2025, 2:56 p.m. EDT)
Set Aside
None
Place of Performance
San Juan, PR 00918 United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
Experimental
$5,000,000 - $15,000,000 (AI estimate)
On 5/19/25 Department of the Army issued Solicitation W51DQV25RA002 for Rio Puerto Nuevo Flood Control Project, Supplemental Contract 3: Channel Bottom and Wall Improvements Project Location: San Juan, Puerto Rico due 7/29/25. The opportunity was issued full & open with NAICS 237990 and PSC Y1KB.
Primary Contact
Name
Jaclyn Yocum   Profile
Phone
(787) 200-2398

Secondary Contact

Name
Meranda Booth   Profile
Phone
(502) 315-6600

Documents

Posted documents for Solicitation W51DQV25RA002

Opportunity Assistant


AI Analysis

AI Generate

Opportunity Lifecycle

Procurement notices related to Solicitation W51DQV25RA002

Award Notifications

Agency published notification of awards for Solicitation W51DQV25RA002

Incumbent or Similar Awards

Contracts Similar to Solicitation W51DQV25RA002

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W51DQV25RA002

Similar Active Opportunities

Open contract opportunities similar to Solicitation W51DQV25RA002

Experts for Rio Puerto Nuevo Flood Control Project, Supplemental Contract 3: Channel Bottom and Wall Improvements Project Location: San Juan, Puerto Rico

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > W2SR TF VIPR
FPDS Organization Code
2100-W51DQV
Source Organization Code
500187834
Last Updated
July 17, 2025
Last Updated By
jaclyn.c.yocum@usace.army.mil
Archive Date
July 10, 2026