Request for Information: Two Phase Design-Build- Albeni Falls Dam Fish Passage   7

ID: W912DW24R0020 • Type: Special Notice
Question & Answer Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

DESCRIPTION:

The United States Army Corps of Engineers, Northwestern Division - Seattle District (NWS) is asking for feedback from industry on an upcoming requirement for a Two-Phase Design-Build large civil works project for the installation of a Fish Passage Facility located at Albeni Falls Dam, Oldtown (AFD), ID.

The agency has been tasked to solicit for and award of a Design-Build construction contract for an upstream trap and haul fish passage facility at AFD for the passage of sub-adult and adult Bull Trout; The planned facility includes an entrance structure designed to discharge approximately 300 cubic feet per second (cfs) with two vertical slot entrances, a gravity water supply system, a fishway, such as a ladder, a pre-sort pool, a fish lock for lifting fish, a sorting facility, and a truck loading area. The operation is anticipated to be year-round, excluding the warmest month of August when temperatures exceed lethal thresholds for bull trout and during winter periods of river or facility ice-over. The facility is designed to operate between tailwater elevations from 2,031 feet to 2,048 ft. The gravity water supply can operate at forebay elevations as low as 2,045 ft and forebay-tailwater elevation differentials as low as 4 ft.

The construction activities may include the installation of isolation devices, like a cofferdam or equivalent, delivery of materials and equipment by trucks or a barge, tunneling through rock, drilling, and blasting of rock (both in and out of the water), placement of piles, and the curing of concrete for the assembly and attachment of the parts. The assembly of most of the structure will take place on land; however, construction of the entrance structure and parts of the auxiliary water intake may need to occur from a floating barge. The staging areas will be coordinated with AFD personnel. Limited laydown areas will be located on the right abutment within and adjacent to the Corps employee parking area. In general, access to the Project site will be from two areas: (1) barges working in the tailrace or forebay, and (2) the right abutment through the Corps access gate, parking area, and over the powerhouse intake deck. River access will be required to construct the fishway entrance as well as the auxiliary water supply intake structure. Access to the remaining project elements will be from the right abutment off U.S. Highway 2 via the dam access road.

The construction of this project will have constraints which include but are not limited to: Seasonal work windows, blasting requirements, in-water work complying with water quality requirements, monitoring and construction work taking place alongside an active Hydroelectric dam while the dam continues to operate normally. Construction of the fish passage will be required to be in coordination with the terms of the Biological Opinion which can be found at:

https://ecos.fws.gov/tails/pub/document/9799287

The proposed project is anticipated to be a competitive, firm-fixed-price type contract to be procured in accordance with the Federal Acquisition Regulation (FAR) Subpart 36.3 (Two-Phase Design-Build Selection Procedures) and FAR Part 15 (Contracting by Negotiation), using the Tradeoff process.

The Government is seeking qualified, experienced sources capable of performing the construction of the AFD Fish Passage Facility. Activities will include, but are not limited to:

1. Design and construction of a fully integrated fish passage facility (target species bull trout) including an entrance structure, fish ladder, holding pool, fish lock, water supply, sorting facility and supporting infrastructure.

2. Construction near an Active Hydroelectric Dam: The dam will be always operational during construction. Blasting and construction near or alongside an operating hydroelectric dam will be required.

3. Construction under the terms of a Biological Opinion: The contract will contain constraints and measures as outlined in the Biological Opinion for activities such as in-water blasting, in-water concrete placement and cofferdam construction.

In accordance with /DFARS Part 236, the estimated construction price range for this project is: Between $100,000,000 and $250,000,000. Estimated duration of the project is 1,460 calendar days from issuance of the Notice to Proceed. The North American Industry Classification System code for this procurement is, 237990 Other Heavy and Civil Engineering Construction, which has a small business size standard of $39.5 million.

The following documents are attached in support of this Special Notice/Request for Information.

  1. W912DW24R0020 Attachment 1-Questions from USACE to Industry regarding the AFD Fish Passage Facility.

Please provide your responses, via email, to: Charles Idle (Charles.d.idle@usace.army.mil), Contract Specialist by January 9, 2024, by 2:00 PM Pacific Time.

Thank you for your interest in this USACE project!

Background
The United States Army Corps of Engineers, Northwestern Division - Seattle District (NWS) is asking for feedback from industry on an upcoming requirement for a Two-Phase Design-Build large civil works project for the installation of a Fish Passage Facility located at Albeni Falls Dam, Oldtown (AFD), ID. The agency has been tasked to solicit for and award of a Design-Build construction contract for an upstream 'trap and haul' fish passage facility at AFD for the passage of sub-adult and adult Bull Trout. The planned facility includes an entrance structure designed to discharge approximately 300 cubic feet per second (cfs) with two vertical slot entrances, a gravity water supply system, a fishway, such as a ladder, a pre-sort pool, a fish lock for lifting fish, a sorting facility, and a truck loading area. The operation is anticipated to be year-round, excluding the warmest month of August when temperatures exceed lethal thresholds for bull trout and during winter periods of river or facility ice-over. The facility is designed to operate between tailwater elevations from 2,031 feet to 2,048 ft.

The construction activities may include the installation of isolation devices, delivery of materials and equipment by trucks or a barge, tunneling through rock, drilling and blasting of rock (both in and out of the water), placement of piles, and the curing of concrete for the assembly and attachment of the parts. The construction will have constraints including seasonal work windows, blasting requirements, in-water work complying with water quality requirements, monitoring and construction work taking place alongside an active Hydroelectric dam while the dam continues to operate normally. Construction of the fish passage will be required to be in coordination with the terms of the Biological Opinion.

Work Details
The construction activities will include:
1. Design and construction of a fully integrated fish passage facility (target species bull trout) including an entrance structure, fish ladder, holding pool, fish lock, water supply, sorting facility and supporting infrastructure.
2. Construction near an Active Hydroelectric Dam: The dam will be always operational during construction. Blasting and construction near or alongside an operating hydroelectric dam will be required.
3. Construction under the terms of a Biological Opinion: The contract will contain constraints and measures as outlined in the Biological Opinion for activities such as in-water blasting, in-water concrete placement and cofferdam construction.

Period of Performance
The estimated duration of the project is 1,460 calendar days from issuance of the Notice to Proceed.

Place of Performance
The geographic location(s) where the construction projects will be performed is Albeni Falls Dam, Oldtown (AFD), ID.

Overview

Response Deadline
Jan. 9, 2024, 5:00 p.m. EST Past Due
Posted
Dec. 13, 2023, 4:52 p.m. EST
Set Aside
None
Place of Performance
Oldtown, ID 83822 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
On 12/13/23 USACE Seattle District issued Special Notice W912DW24R0020 for Request for Information: Two Phase Design-Build- Albeni Falls Dam Fish Passage due 1/9/24.
Primary Contact
Name
Charles Idle   Profile
Phone
(206) 316-3998

Secondary Contact

Name
Gregory Cook   Profile
Phone
None

Documents

Posted documents for Special Notice W912DW24R0020

Question & Answer

Opportunity Lifecycle

Procurement notices related to Special Notice W912DW24R0020

Incumbent or Similar Awards

Contracts Similar to Special Notice W912DW24R0020

Potential Bidders and Partners

Awardees that have won contracts similar to Special Notice W912DW24R0020

Similar Active Opportunities

Open contract opportunities similar to Special Notice W912DW24R0020

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > NWD > US ARMY ENGINEER DISTRICT SEATTLE
FPDS Organization Code
2100-W912DW
Source Organization Code
100221304
Last Updated
Jan. 24, 2024
Last Updated By
gregory.a.cook@usace.army.mil
Archive Date
Jan. 24, 2024