Posted: Nov. 14, 2024, 11:53 a.m. EST

Pre-Solicitation Notice W912BV25R0001

Replacement of the Tenkiller Dam spillway bridge, Sequoya County near Gore, Oklahoma

On or about 22 November 2024, this office will issue Request for Proposal (RFP) to replace the Tenkiller Dam spillway bridge, Sequoya County near Gore, Oklahoma. The solicitation will close on or about 06 January 2024.

This solicitation is UNRESTRICTED. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS code 237310 is included in their profile prior to submission of offer.

Site visit will be scheduled when the RFP releases. Site visit will require PPE (hard hat, reflective vest, and safety boots). The solicitation will include photographic attachments and drawings.

DO NOT submit requests for plans and specifications. See Obtaining Solicitation Documents' below.

Project Description:

The Government is seeking qualified, experienced sources capable of replacing the spillway bridge. The Tenkiller Spillway Bridge project includes but is not limited to:

1. Demolition of the existing bridge pedestals, girders, beams, deck, sidewalks, guardrails, electrical power/lighting systems, utilities, catwalk, and all appurtenances as indicated on the drawings.

2. Design, construction, and establishment of temporary electrical service, to provide uninterrupted operation of all existing Government facilities and structures for the duration of the contract, must be provided. Temporary electrical power, for operation of existing Government equipment and facilities only (tainter gates, lights, sump pump, lake offices, etc.), will be provided from the Tenkiller powerhouse and paid for by the Government. Provide, condition, and pay for all power/electrical service and all other utilities necessary for construction equipment and facilities.

3. Design and construction of safety walkways for uninterrupted Government personnel access to all existing tainter gate controls, power systems, and platforms. Minimum design and construction requirements must be in accordance with OSHA and EM 385-1-1. Designed and constructed installed system so that personal fall protection equipment is not required to utilize the walkways.

4. Construction of new bridge and appurtenances including, but not limited to, bridge pedestals, precast pretensioned girders, precast pretensioned deck panels with deck panel joints, haunches, and blockouts using Ultra High-Performance Concrete (UHPC), sidewalks, parapets, and railings.

5. Construction of new electrical power/lighting systems.

6. Construction of new catwalks, torque shaft supporting system, and appurtenances.

7. Construction of new water lines under bridge structure.

8. Completely clean the construction area, remove all construction equipment, facilities, and debris from Government property, and restore disturbed areas to preconstruction conditions.

The Contractor will be required to commence work within 10 days after Notice to Proceed (NTP) and complete the work in the proposed number of calendar days (Not to Exceed 600 calendar days) after receipt of NTP. Provisions will be included for Liquidated Damages in case of failure to complete the work in the time allowed. Performance and Payment Bonds will be required.

The above project description is for information only. Project scope of work is subject to change.

RFP Evaluation Criteria:

Firms participating in the solicitation will submit technical requirements in accordance with Section 00 22 00 PROPOSAL SUBMISSION REQUIREMENTS, INSTRUCTIONS AND EVALUATION. Submissions will be evaluated based on a best value approach considering technical elements for evaluation (i.e., Specialized Experience, Technical Approach, Key Personnel, Past Performance, and Contract Schedule). An adjectival method of evaluation will be used to evaluate all technical factors. Price will be evaluated separately for reasonableness and realism. A Best Value selection will be considered after reviewing price and technical factors.

In accordance with DFAR 236.204, the estimated magnitude of construction for this project is between $25,000,000 and $100,000,000.

Bidders (Offerors):

Please be advised of online registration requirement in the SAM, https://www.sam.gov/ and directed solicitation provisions concerning representations and certifications. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to SAM.

Obtaining Solicitation Documents:

Solicitation documents will be posted to the web via Procurement Integrated Enterprise Environment (PIEE) through https://piee.eb.mil.

Solicitation No.: W912BV25R0001

It shall be the Offeror's responsibility to check the websites for any amendments. The Offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received in response to this solicitation.

Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

Please direct procurement questions to the Contracting Specialist, Ryan Kelly via email at Ryan.J.Kelly@usace.army.mil, add the Solicitation Number and Name in the Subject Line of the email.

PHONE CALLS WILL NOT BE ACCEPTED.

Posted: Oct. 21, 2024, 11:11 a.m. EDT
Posted: Oct. 21, 2024, 10:49 a.m. EDT
Posted: Sept. 24, 2024, 5:54 p.m. EDT
Background
The U.S. Army Corps of Engineers is issuing a Request for Proposal (RFP) for the replacement of the Tenkiller Dam spillway bridge located in Sequoya County near Gore, Oklahoma.

The goal of this contract is to ensure the safe and efficient operation of government facilities by replacing an aging infrastructure component. This project is part of the agency's mission to maintain and improve critical water resource infrastructure.

Work Details
The Tenkiller Spillway Bridge project includes the following tasks:
1. Demolition of existing bridge components including pedestals, girders, beams, deck, sidewalks, guardrails, electrical power/lighting systems, utilities, catwalks, and all appurtenances as indicated on the drawings.
2. Design and construction of temporary electrical service to ensure uninterrupted operation of existing Government facilities during construction.
3. Design and construction of safety walkways for Government personnel access to tainter gate controls and power systems, adhering to OSHA standards.
4. Construction of a new bridge with precast components using Ultra High-Performance Concrete (UHPC), including sidewalks and railings.
5. Installation of new electrical power/lighting systems.
6. Construction of new catwalks and supporting systems.
7. Installation of new water lines under the bridge structure.
8. Cleaning the construction area and restoring disturbed areas to preconstruction conditions.

Period of Performance
The contractor is required to commence work within 10 days after receiving the Notice to Proceed (NTP) and must complete the work within a maximum period not exceeding 600 calendar days after receipt of NTP.

Place of Performance
Sequoya County near Gore, Oklahoma

Overview

Response Deadline
Nov. 22, 2024, 3:00 p.m. EST (original: Oct. 9, 2024, 3:00 p.m. EDT) Past Due
Posted
Sept. 24, 2024, 5:54 p.m. EDT (updated: Nov. 14, 2024, 11:53 a.m. EST)
Set Aside
None
Place of Performance
Gore, OK United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Evaluation Criteria
Best Value
Est. Level of Competition
Average
Odds of Award
88%
On 9/24/24 USACE Tulsa District issued Presolicitation W912BV25R0001 for Replacement of the Tenkiller Dam Spillway Bridge, Oklahoma due 11/22/24. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Ryan Kelly   Profile
Phone
(918) 669-7279

Secondary Contact

Name
SHAWN ADKINS   Profile
Phone
(918) 669-7483

Documents

Posted documents for Presolicitation W912BV25R0001

Question & Answer

Opportunity Lifecycle

Procurement notices related to Presolicitation W912BV25R0001

Incumbent or Similar Awards

Contracts Similar to Presolicitation W912BV25R0001

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation W912BV25R0001

Similar Active Opportunities

Open contract opportunities similar to Presolicitation W912BV25R0001

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SWD > US ARMY ENGINEER DISTRICT TULSA
FPDS Organization Code
2100-W912BV
Source Organization Code
100221322
Last Updated
Nov. 22, 2024
Last Updated By
ryan.j.kelly@usace.army.mil
Archive Date
Nov. 22, 2024