Search Contract Opportunities

Replacement of 36 HWK03K Hydronic Coil Kits on PTAC Units on the Quarters Barge Taggatz.

ID: W912ES26QA047 • Type: Solicitation • Match:  100%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Replacement of 36 HWK03K Hydronic Coil Kits on PTAC Units on the Quarters Barge Taggatz.
Background
The contract is issued by the U.S. Army Corps of Engineers, St. Paul District, aimed at replacing hydronic coil kits on Packaged Terminal Air Conditioner (PTAC) units aboard the Quarters Barge Taggatz. The goal is to ensure efficient heating operations in accordance with manufacturer specifications and safety standards.

Work Details
The Contractor shall provide all labor, materials, tools, equipment, testing, permits, and supervision necessary to remove existing HWK03K hydronic coil kits from PTAC units and install thirty-six new HWK03K kits or approved equivalents. The specific PTAC units involved are:

- 18 AMANA PTC093B00FE units
- 11 AMANA PTC073B00FE units
- 7 AMANA PTC153B00FE units.

Work includes plumbing, electrical connections, calibration, testing, and commissioning for proper operation in hydronic heating mode. The Contractor must coordinate access to various locations within the Quarters Barge Taggatz and maintain flexibility to minimize disruption to personnel. All work must comply with Amana installation procedures and applicable USACE standards. The Contractor is responsible for verifying parts accuracy before work begins and must dispose of all removed coils in compliance with environmental regulations. Deliverables include a Safety Plan and Lockout/Tagout Procedure prior to mobilization, a Test and Commissioning Report upon completion of work, and warranty documentation before final payment.

Period of Performance
All work shall be completed no later than September 1, 2026.

Place of Performance
Quarters Barge Taggatz.

Overview

Response Deadline
May 8, 2026, 4:00 p.m. EDT (original: May 1, 2026, 4:00 p.m. EDT) Past Due
Posted
April 22, 2026, 2:10 p.m. EDT (updated: April 30, 2026, 12:25 p.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Located on a moving floating barge on the Mississippi river. The boat will be stationed anywhere from Gutenberg Iowa to Saint Paul Minnesota. Transportation will be provided to and from river access locations via small craft. USA
Source

Current SBA Size Standard
1250 Employees
Pricing
Likely Fixed Price
Est. Level of Competition
High
Est. Value Range
Experimental
$90,000 - $180,000 (AI estimate)
On 4/22/26 USACE St. Paul District issued Solicitation W912ES26QA047 for Replacement of 36 HWK03K Hydronic Coil Kits on PTAC Units on the Quarters Barge Taggatz. due 5/8/26. The opportunity was issued with a Small Business (SBA) set aside with NAICS 333415 (SBA Size Standard 1250 Employees) and PSC J045.
Primary Contact
Name
Benjamin Knutson   Profile
Phone
(651) 290-5418

Documents

Posted documents for Solicitation W912ES26QA047

Opportunity Assistant


AI Analysis

AI Generate

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912ES26QA047

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912ES26QA047

Experts for Replacement of 36 HWK03K Hydronic Coil Kits on PTAC Units on the Quarters Barge Taggatz.

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > MVD > W07V ENDIST ST PAUL
FPDS Organization Code
2100-W912ES
Source Organization Code
100221313
Last Updated
May 13, 2026
Last Updated By
benjamin.t.knutson@usace.army.mil
Archive Date
May 12, 2026