Search Contract Opportunities

Repair_Replace Liner, Wastewater Lagoon One   2

ID: MXDP14-1022 • Type: Presolicitation

Description

The purpose of the project is to repair the eroded lagoon wall or clay liner, replace with a geomembrane liner, and install a leak detection system in the Wastewater Lagoon 1.

This project is a design-build contract. The Contractor shall be responsible for completing a 100% design. The Contractor shall also be responsible for the construction of the approved design as described herein. The 100% design shall be approved by the Government prior to the beginning of construction.

Background
The project involves the repair of the eroded lagoon wall or clay liner, replacement with a geomembrane liner, and installation of a leak detection system in Wastewater Lagoon 1 at Laughlin Air Force Base, Texas. The project is a design-build contract, with the contractor responsible for completing a 100% design and the construction of the approved design as described in the document.

Work Details
The scope of work includes determining condition and integrity, establishing design criteria, performing design, implementing repairs, installing systems, and performing any required performance tests applicable to state and federal regulations. The contractor is also responsible for investigating existing conditions, obtaining necessary engineering design data through on-site investigation, reconnaissance, and surveys, recommending components for demolition and replacement, conducting testing to ensure design criteria are met during repair of the lagoon, and coordinating with regulatory bodies for environmental compliance. Additionally, the contractor is required to complete a 100% design to repair the eroded wall, install a new geomembrane liner, and install a new leak detection system for Wastewater Lagoon 1.

Period of Performance
The period of performance for Notice to Proceed (NTP)#1 is 135 calendar days. The PoP for NTP#2 is 60 calendar days. The PoP for NTP#3 is 150 calendar days.

Place of Performance
The construction projects will be performed at Laughlin Air Force Base in Texas.

Overview

Response Deadline
March 18, 2023, 5:00 p.m. EDT Past Due
Posted
March 3, 2023, 5:28 p.m. EST
Set Aside
Women-Owned Small Business (WOSB)
Place of Performance
Laughlin AFB, TX 78843 USA
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Odds of Award
74%
On 3/3/23 Air Education and Training Command issued Presolicitation MXDP14-1022 for Repair_Replace Liner, Wastewater Lagoon One due 3/18/23. The opportunity was issued with a Women-Owned Small Business (WOSB) set aside with NAICS 237110 (SBA Size Standard $45 Million) and PSC Z2ND.
Primary Contact
Name
Carlos M. Burnes   Profile
Phone
(830) 298-5608

Secondary Contact

Name
Ernesto Lopez   Profile
Phone
(830) 298-4887

Documents

Posted documents for Presolicitation MXDP14-1022

Question & Answer

Opportunity Lifecycle

Procurement notices related to Presolicitation MXDP14-1022

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation MXDP14-1022

Similar Active Opportunities

Open contract opportunities similar to Presolicitation MXDP14-1022

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE AIR FORCE > AETC > FA3099 47 CONF CC
FPDS Organization Code
5700-FA3099
Source Organization Code
100076603
Last Updated
April 2, 2023
Last Updated By
salvador.castillo@us.af.mil
Archive Date
April 3, 2023