Search Contract Opportunities

Rare Earth Metals Production

ID: DLA212-004 • Type: SBIR / STTR Topic • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Do the documents mention an incumbent contractor?
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

RT&L FOCUS AREA(S): General Warfighting Requirements (GWR) TECHNOLOGY AREA(S): Materials The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with section 3.5 of the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws. OBJECTIVE: Develop, demonstrate, and stand up a rare earth metal production process. The process should be able to produce metal from commercially available oxides or carbonates. It should be scalable to meet changes in industrial demand. The price should be commercially viable. The major elements of interest are neodymium (Nd), praseodymium (Pr), gadolinium (Gd), samarium (Sm). DESCRIPTION: DLA requires a domestic processing ability to produce rare earth metals from commercially available precursors. These materials are essential to a wide range of both essential civilian and military technologies. Domestic manufacturing of these material is essential for DLA to support the warfighter. The process should be able to take multiple commercially available precursors and produce high purity metal. It must be environmentally compliant with all federal, state, and local laws. Ideally the process and equipment could be used for more then a single element. The material should be at least 99.9% pure. The process should be scalable and modular to allow for rapid scale up if necessary. PHASE I: The below actions would be required to successfully accomplish Phase I: At a minimum, develop a process flow sheet and design a lab scale of material processed of at least 2kg to confirm its accuracy. Material produced at the required purity level. Breakdown of cost structure for industrialization including required capital expenditures and per unit production costs. Phase I 6 Months $100K Phase II 24 Months $1.6M PHASE II: The below actions would be required to successfully accomplish Phase II: Deliver a lab scale prototype (TRL 6) with a minimal low-rate production for at least 1 of the listed materials. Using the metal produced to make a magnet alloy and test magnet blocks made from it. Detail a plan on how to increase to full commercial production for as many of the materials as is possible with the same hardware. Outline the economic business case for full scale commercialization. PHASE III DUAL USE APPLICATIONS: Phase III is any proposal that Derives From , Extends or Completes a transition from a Phase I or II project. Phase III proposals will be accepted after the completion of Phase I and or Phase II projects. There is no specific funding is associated with Phase III, except Phase III is not allowed to use SBIR/STTR coded funding. Any other type funding is allowed. Phase III proposal Submission. Phase III proposals are emailed directly to DLA SBIR2@dla.mil. The PMO team will set up evaluations and coordinate the funding and contracting actions depending on the outcome of the evaluations. A Phase III proposal should follow the same format as Phase II for the content, and format. There are, however, no limitations to the amount of funding requested, or the period of performance. All other guidelines apply. PHASE III DUAL USE APPLICATIONS: these materials have dual-use commercial or military applications in many complex systems.

Overview

Response Deadline
June 17, 2021 Past Due
Posted
April 21, 2021
Open
May 19, 2021
Set Aside
Small Business (SBA)
Place of Performance
Not Provided
Source
Alt Source

Program
SBIR Phase I / II
Structure
Contract
Phase Detail
Phase I: Establish the technical merit, feasibility, and commercial potential of the proposed R/R&D efforts and determine the quality of performance of the small business awardee organization.
Phase II: Continue the R/R&D efforts initiated in Phase I. Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II. Typically, only Phase I awardees are eligible for a Phase II award
Duration
6 Months - 1 Year
Size Limit
500 Employees
On 4/21/21 Defense Logistics Agency issued SBIR / STTR Topic DLA212-004 for Rare Earth Metals Production due 6/17/21.

Documents

Posted documents for SBIR / STTR Topic DLA212-004

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Contract Awards

Prime contracts awarded through SBIR / STTR Topic DLA212-004

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to SBIR / STTR Topic DLA212-004

Similar Active Opportunities

Open contract opportunities similar to SBIR / STTR Topic DLA212-004