Search Contract Opportunities

Rapidly Deployable Base Fortification Systems

ID: AF241-D001 • Type: SBIR / STTR Topic • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Do the documents mention an incumbent contractor?
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

OUSD (R&E) CRITICAL TECHNOLOGY AREA(S): Advanced Materials The technology within this topic is restricted under the International Traffic in Arms Regulation (ITAR), 22 CFR Parts 120-130, which controls the export and import of defense-related material and services, including export of sensitive technical data, or the Export Administration Regulation (EAR), 15 CFR Parts 730-774, which controls dual use items. Offerors must disclose any proposed use of foreign nationals (FNs), their country(ies) of origin, the type of visa or work permit possessed, and the statement of work (SOW) tasks intended for accomplishment by the FN(s) in accordance with the Announcement. Offerors are advised foreign nationals proposed to perform on this topic may be restricted due to the technical data under US Export Control Laws. OBJECTIVE: Development of improved base fortification systems that provide rapid defense for personnel in an austere environment. Maximum utilization of readily available resources in the field it to be utilized in order to minimize transportation weight, deployment time, and destruction for withdrawal time. Technology should be about to be transportable on aircraft with minimal footprint. DESCRIPTION: Currently, military personnel must bring equipment with them to austere environments in order to fortify their fighting position. For shorter durations, the sandbag is the most likely fortifying material to be utilized by personnel in the field. Additionally, the sandbag serves a pivotal function in long-term defensive applications. The basic sandbag requires ready access to dirt, sand, or similar earth material that be excavated to fill the bag and then it is arranged in a manner to provide a makeshift protection wall. Of particular interest are technologies that can reduce the employment time of sandbags or completely replace the sandbag system with a comparable system that provides equal, or better, levels of protection for personnel. Currently, the sandbag is manually filled with some in-field improvements that have been created by personnel. However, even with these manual creations, the process of filling and deploying sandbags is extremely time consuming, which increase personnel fatigue and reduces defensive capabilities. Improvement points may include, but not limited to: prefilled sandbags that fully deploy under certain conditions, lightweight systems capable of rapidly filling sandbags, lightweight systems capable of quickly deploying multiple sandbags, or a total sandbags replacement system. Further, the systems need to be minimal in size and weight to reduce cargo size and weight such that impact for transportation is minimized. This work is to be done at the unclassified level for Phase I and II. PHASE I: As this is a Direct-to-Phase-II (D2P2) topic, no Phase I awards will be made as a result of this topic. To qualify for this D2P2 topic, the Government expects the Offeror to demonstrate feasibility by means of a prior Phase I-type effort that does not constitute work undertaken as part of a prior SBIR/STTR funding agreement. In order to be awarded a D2P2, the applicant's technology should have a fully developed blueprint, concept or, at best, prototype to further develop. The proposer should demonstrate the feasibility of their design and its readiness for a Phase II. PHASE II: Perform in-depth research and develop, resulting in a full-scale prototype package that demonstrates the capability of the product and the time to deploy as compared to a comparable dimension of standard fortification products in use today. Delivery and demonstration of the product will be conducted in the customer's environment, and performance will be evaluated. PHASE III DUAL USE APPLICATIONS: Explore and pursue paths for military and commercial applications. Potential users may include, but are not limited to, Federal Emergency Management Agency, Department of Homeland Security, Border Patrol, and local governments. This phase will also focus on inserting and evaluating performance of the developed capability in operational environments. REFERENCES: Base defense fortification; KEYWORDS: fortification; sandbag; emplacements; base building

Overview

Response Deadline
Feb. 7, 2024 Past Due
Posted
Nov. 29, 2023
Open
Jan. 3, 2024
Set Aside
Small Business (SBA)
Place of Performance
Not Provided
Source
Alt Source

Program
SBIR Phase I / II
Structure
Contract
Phase Detail
Phase I: Establish the technical merit, feasibility, and commercial potential of the proposed R/R&D efforts and determine the quality of performance of the small business awardee organization.
Phase II: Continue the R/R&D efforts initiated in Phase I. Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II. Typically, only Phase I awardees are eligible for a Phase II award
Duration
6 Months - 1 Year
Size Limit
500 Employees
On 11/29/23 Department of the Air Force issued SBIR / STTR Topic AF241-D001 for Rapidly Deployable Base Fortification Systems due 2/7/24.

Documents

Posted documents for SBIR / STTR Topic AF241-D001

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Contract Awards

Prime contracts awarded through SBIR / STTR Topic AF241-D001

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to SBIR / STTR Topic AF241-D001

Similar Active Opportunities

Open contract opportunities similar to SBIR / STTR Topic AF241-D001