Description

Dear Prospective Offeror:

Subject: Request for Quotes 19CE2026Q0008

Enclosed is a Request for Quotes (RFQ) for Renovation - Electrical Installation Work at 75, Gregory's Road Col 7. If you would like to submit a quotation, follow the instructions in Section J of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form that follows this letter.

Description

Provide all labor, materials, equipment, supervision, testing, and commissioning for complete electrical works for the Clubhouse, Tool Room, Guard House, and Generator Room. Scope includes modification and installation of MDB/SDB panels; supply, laying, and termination of Cu/XLPE/LSZH power and control cabling; LSZH conduit and Zn-Al coated cable tray systems with HDG supports and bonding; full wiring for lighting and power circuits; installation of LED lighting fixtures (downlights, strips, wall/step lights, weatherproof and RGB units) with drivers and supports; socket outlets, industrial sockets, floor boxes, isolators, and sensors; and integration of DALI/KNX/Lutron lighting control systems. Works include labeling, earthing, builder's works, third-party certification, testing, commissioning, and as-built/O&M documentation, in compliance with NEC and applicable standards, BS7671

Attachments

  • Attachment 1 Statement of Work
  • Attachment 2 Safety Plan
  • Attachment 3 Electrical Drawings
  • Note: The drawings will be made available only to attendees at the mandatory/pre-proposal site visit and conference. No drawings will be distributed electronically.

The U.S. Government intends to award a contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial proposals, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.

Quotations are due by 1700 hours 22nd May 2026. No quotations will be accepted after this time. Quotations must be in English and incomplete quotations will not be accepted.

The Embassy intends to conduct a pre-proposal conference at No. 75, Gregory's Road, Colombo 7, at 10:15 a.m. on 12th May 2026.

Prices should be duty free and VAT exempt.

Both quotation and technical proposal should be submitted and addressed to:
Contracting Officer, American Embassy Colombo, 210 Galle Road, Colombo 03, Sri Lanka
Email: sundaravelyg@state.gov

In order for a quotation to be considered, you must also complete and submit the following:

1. SF-18

2. Section A, Pricing

3. Section L Representations and Certifications

4. Additional information as required in Section J

Local Execution, Responsiveness, and On-Site Requirements

To ensure timely execution, quality assurance, and effective project coordination, the following mandatory requirements apply:

  1. Local Project Execution Capability
    • The Contractor shall have an established local presence in Sri Lanka, either as a registered company, joint venture, or formally authorized local representative.
    • Proof of local office, operational base, or permanent technical support facility shall be provided.
  2. On-Site Supervision and Mobilization
    • Contractor must provide qualified on-site supervision throughout the project duration.
    • Mobilization of personnel, materials, and equipment must be completed within the agreed project timeline and in no case exceed 5 to 10 calendar days from notice to proceed.
  3. Response Time and Project Support
    • The Contractor must ensure technical response within 24 48 hours for all site coordination, installation issues, and clarification requests.
    • Emergency or critical site support shall be available on call within Sri Lanka during execution phase.
  4. Travel, Logistics, and Cost Responsibility
    • All travel, accommodation, transport, customs clearance, and logistical costs associated with project execution shall be fully borne by the Contractor.
    • The Embassy will not be responsible for international travel or mobilization expenses.
  5. Site Familiarization and Attendance
    • Attendance at the pre-proposal conference and site visit is strongly encouraged and may be required for technical qualification.
    • Failure to demonstrate familiarity with site conditions may result in technical non-responsiveness.
  6. After-Sales Support and Warranty Service
    • Contractor shall maintain local warranty support capability in Sri Lanka for the full warranty period.
Background
The U.S. Government, through the American Embassy in Colombo, Sri Lanka, is seeking quotes for electrical installation work as part of a renovation project at 75, Gregory's Road, Colombo 7.

The goal of this contract is to provide comprehensive electrical services for various facilities including a Clubhouse, Tool Room, Guard House, and Generator Room. This project aims to enhance the functionality and safety of these facilities through modern electrical systems.

Work Details
The contractor will be responsible for all labor, materials, equipment, supervision, testing, and commissioning necessary for complete electrical works. The scope includes:

- Modification and installation of MDB/SDB panels;
- Supply, laying, and termination of Cu/XLPE/LSZH power and control cabling;
- Installation of LSZH conduit and Zn-Al coated cable tray systems with HDG supports;
- Full wiring for lighting and power circuits;
- Installation of LED lighting fixtures (including downlights, strips, wall/step lights, weatherproof units);
- Installation of socket outlets, industrial sockets, floor boxes, isolators, sensors;
- Integration of DALI/KNX/Lutron lighting control systems;
- Labeling; earthing; builder’s works; third-party certification; testing; commissioning; and preparation of as-built/O&M documentation in compliance with NEC and applicable standards such as BS7671.

Place of Performance
The construction projects will be performed at 75 Gregory's Road Col 7 in Colombo 7, Sri Lanka.

Overview

Response Deadline
May 22, 2026, 8:00 a.m. EDT Due in 8 Days
Posted
May 7, 2026, 5:32 a.m. EDT
Set Aside
None
Place of Performance
Colombo, LK-1 00300 Sri Lanka
Source

Est. Level of Competition
Average
Est. Value Range
Experimental
$150,000 - $450,000 (AI estimate)
On 5/7/26 U.S. Embassy In Colombo issued Solicitation PR15989094 for Proposal for Recreation Center Renovation-Electrical Installation Work due 5/22/26. The opportunity was issued full & open with NAICS 23 and PSC Z2FA.
Primary Contact
Name
Yogaganesh Sundaravel   Profile
Phone
94112028525
Fax
94112028753

Secondary Contact

Name
Danujaya Muthugala   Profile
Phone
94112028816
Fax
94112498753

Documents

Posted documents for Solicitation PR15989094

Opportunity Assistant


AI Analysis

AI Generate

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation PR15989094

Similar Active Opportunities

Open contract opportunities similar to Solicitation PR15989094

Experts for Proposal for Recreation Center Renovation-Electrical Installation Work

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
STATE, DEPARTMENT OF > STATE, DEPARTMENT OF > US EMBASSY COLOMBO
FPDS Organization Code
1900-CE200
Source Organization Code
100180009
Last Updated
May 7, 2026
Last Updated By
ferryms@state.gov
Archive Date
June 6, 2026