Please summarize the work to be completed under this opportunity
Does this solicitation list any subcontracting requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

The General Services Administration, Region 8, is initiating a project to remove approximately Thirty-two (32) electrical & data feeds and install nine (9) new power & data feeds and two (2) power only feeds, and remove and run new data cables to nine (9) existing locations In room 215 of the federal building Aberdeen South Dakota.

The contractor shall provide labor, materials, equipment and supervision necessary to perform:

  1. Pedestrian control:
    1. Contractor shall coordinate sequencing and control measures with the Project Manager and the Property Manager.
    2. Contractor shall provide barricades to prevent access of the public into the work areas; and shall protect the public at all times.
  2. Contractor shall demo all electrical wires & data cables and conduit running to the identified power feeds on the map as C (Cap).
    1. Electrical Wires and conduit shall be removed back to the nearest junction box and have knockout covers installed on all unused knockouts.
      1. Contractor shall reuse existing conduit, circuits, and wire to the greatest extent possible for new power drops.
      2. Contractor shall mark any unused circuits in the breaker panel as spare and mark all junction boxes with breaker panel location and circuit number.
    2. All dedicated circuits shall have wires demoed back to the breaker panel, and breaker marked as spare
    3. Contractor shall remove old data cabling back to the agency owned switch or patch panel located in the second floor wire closet.
  3. Contractor shall provide and install all new wire and conduit for Identified as P&D (power and data) and P (power) on the map
      1. Contractor shall reuse existing conduit, circuits, and wire to the greatest extent possible for new power drops
      2. Contractor shall verify reused existing circuits are not overloaded per NEC and P100.
    1. All new power feeds shall be installed per NEC.
    2. Conductors #10 and below must be solid copper conductors.
    3. Contractor shall provide and install a new panel circuit directory.
    4. Contractor shall provide and install circuit information labels on all outlet covers.
    5. Metal-Clad Cable may be used for portions of branch circuits not excluded below and that do not terminate directly at panel board.
      1. Metal-Clad Cable must be steel armored and not exceed #10 AWG.
      2. Metal-Clad Cable must be labeled a minimum of every three feet with 360 degree paint bands indicating number of conductors and voltage (either 480/277 or 208/120v) of conductors.
      3. Conduit systems must be used between the panelboard and the first wiring device.
      4. All Metal-Clad Cable runs must be provided with permanent typed labels at all deck-to-deck wall penetrations with tags indicating panelboard and circuit feed from.
      5. Individual Metal-Clad Cables must NOT contain more than three current carrying conductors to prevent having to derate the cables due to heat.
      6. Metal-Clad Cable must be secured to the structure as stipulated in the National Electric Code unless otherwise noted in this document. All cables must be secured within 12 inches of the cable termination device.
      7. Snap in type fittings must not be used.
  4. The contractor shall provide and install two cables per location shown on map as K (keep) and P&D (power and data) for a total of thirty six (36) cables.
    1. Cabling shall be Leviton LM-RDT Cat 6A UTP CMP (blue in color) cabling, no substitutions will be allowed.
      1. Cabling supported by ceiling tiles is not permitted.
      2. All data cabling located throughout the building is required to be in a cable management system equivalent to a tray, conduit, etc. Hooks are allowed on data circuits of 20 or less.
  5. Contractor shall terminate all data cabling in floor boxes and at agency owned equipment in the IT closet, ports to be identified at time of installation.
  6. Contractor shall test all new data cabling and provide a certification report and Leviton warranty.
  7. Contractor shall provide and install appropriate floor boxes for new electrical and data cabling.
  8. Contractor shall Seal/fill all penetrations from removed conduit or wire with approved fire caulking
  9. Contractor shall provide updated drawings showing locations of all existing and new outlets with panel and circuit information for each location at the completion of the project.
  10. Disruptive or loud work will be required to be done after hours.
  11. Contractor to field verify all site conditions to include but not limited to quantities of materials and locations of feeds to be removed and new feeds.
  12. Replace and/or repair any damage caused as a result of this project to pre-construction condition; this includes, but is not limited

to ceiling tile, carpet, or electrical conduit and wires.

Background
The General Services Administration, Region 8, is initiating a project to remove approximately thirty-two (32) electrical and data feeds and install nine (9) new power and data feeds along with two (2) power-only feeds.

The project also includes the removal and installation of new data cables to nine (9) existing locations in room 215 of the Federal Building located in Aberdeen, South Dakota. The goal of this contract is to ensure the efficient relocation of power and data systems within the facility.

Work Details
The contractor shall provide labor, materials, equipment, and supervision necessary to perform the following tasks:
1. **Pedestrian Control**: Coordinate sequencing and control measures with the Project Manager and Property Manager; provide barricades to prevent public access to work areas.
2. **Demolition**: Remove all electrical wires, data cables, and conduit running to identified power feeds; demo back to the nearest junction box with knockout covers installed on unused knockouts; reuse existing conduit, circuits, and wire where possible.
3. **Installation of New Wiring**: Provide and install new wire and conduit for identified power and data feeds; ensure compliance with NEC standards; use solid copper conductors for #10 gauge and below; install a new panel circuit directory and circuit information labels on outlet covers.
4. **Metal-Clad Cable Installation**: Use steel armored Metal-Clad Cable not exceeding #10 AWG; label cables every three feet indicating number of conductors and voltage; secure cables as per NEC requirements.
5. **Data Cabling**: Install a total of thirty-six (36) Leviton LM-RDT Cat 6A UTP CMP cables in specified locations; terminate all data cabling in floor boxes at agency-owned equipment in the IT closet.
6. **Testing**: Test all new data cabling and provide a certification report along with a Leviton warranty.
7. **Floor Boxes**: Provide and install appropriate floor boxes for new electrical and data cabling.
8. **Sealing Penetrations**: Seal all penetrations from removed conduit or wire with approved fire caulking.
9. **Documentation**: Provide updated drawings showing locations of all existing and new outlets with panel and circuit information upon project completion.

Period of Performance
The contractor has 30 calendar days to complete the project once notice to proceed has been issued.

Place of Performance
Federal Building, 115 4th Avenue, SE, Aberdeen, SD 57401-4370

Overview

Response Deadline
June 16, 2025, 6:00 p.m. EDT Past Due
Posted
May 16, 2025, 11:01 a.m. EDT (updated: May 16, 2025, 3:17 p.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Aberdeen, SD 57401 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
$32,000,000 (value based on agency estimated range)
Signs of Shaping
55% of obligations for similar contracts within the Public Buildings Service were awarded full & open.
On 5/16/25 PBS Region 8: Rocky Mountain Region issued Solicitation 47PJ0025R0056 for Power and Data relocation due 6/16/25. The opportunity was issued with a Small Business (SBA) set aside with NAICS 236220 (SBA Size Standard $45 Million) and PSC Z2AA.
Primary Contact
Name
Corey J Roundfield   Profile
Phone
(720) 656-0243

Secondary Contact

Name
Chad Andrews   Profile
Phone
None

Documents

Posted documents for Solicitation 47PJ0025R0056

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation 47PJ0025R0056

Incumbent or Similar Awards

Contracts Similar to Solicitation 47PJ0025R0056

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 47PJ0025R0056

Similar Active Opportunities

Open contract opportunities similar to Solicitation 47PJ0025R0056

Additional Details

Source Agency Hierarchy
GENERAL SERVICES ADMINISTRATION > PUBLIC BUILDINGS SERVICE > PBS R8
FPDS Organization Code
4740-47PJ00
Source Organization Code
100176880
Last Updated
July 1, 2025
Last Updated By
monique.brumley@gsa.gov
Archive Date
July 1, 2025