Pajaro River Reach 6   3

ID: W912P725BA012 • Type: Solicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
Does this solicitation list any subcontracting requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: Aug. 28, 2025, 6:38 p.m. EDT

BID ABSTRACT UPDATED***************************AMENDMENT 0006:THE PURPOSE OF THIS AMENDMENT IS TO ADD CLAUSE 52.222-33 NOTICE OF REQUIREMENT FOR PROJECT LABOR AGREEMENT - ALTERNATE I. ********************************************************************** AMENDMENT 0005: BID DUE DATE HAS BEEN EXTENDED TO AUGUST 28. REVISED SPECS, PLANS HAVE BEEN POSTED AND RFIS RESPONSES HAVE BEEN UPLOADED ************************************ AMENDMENT 0004:THE PURPOSE OF THIS AMENDMENT IS DESCRIBED IN THE SUMMARY OF CHANGES BELOW. *UPDATE WAGE DETERMINATION *INCLUDE SUBCONTRACTING GOALS*REMOVE INCORRECT DELIVERY SCHEDULE IN SOLICITATION*PROVIDE RFI RESPONSES*PROVIDE REVISED SPECS AND PLANS CORRESPONDING TO RFI RESPONSES (Spec 01 50 00, Spec 31 41 16)************************************************* AMENDMENT 0003 POSTED ON 7/31/2025 - See summary of changes on SF30 for list of revisions. Bid opening date extended to August 20, 2025 at 1:00 PM. More responses to RFIs will be posted shortly. **********************************Amendment 0002 has been posted in the attachments. Amendment 0002 provides geotechnical reports, schedules C-D, and the plans sheet that details the temporary no work zone. **********************************PIEE Update: CONTRACTOR SITE VISIT SIGN IN SHEET UPLOADED TO ATTACHMENTS***********************************AMENDMENT 0001 - POSTED 7/16/205: The purpose of this amendment is to provide the site visit time, date, and location, amend clause 52.236-1, and provide a list of outstanding conflict items that are currently being resolved and their resolution date***************************************************************************This Procurement will be conducted under PSC CODE: Y1PZ NAICS Code: 237990. The size standard for this code is $45,000,000. All questions should be directed to the Contract Specialist, Logan Champlin: logan.champlin@usace.army.mil or the contracting officer Mary Fronck (mary.fronck@usace.army.mil). Estimated Cost Range is between $25-$100M. IFB/Solicitation Number: W912P725BA012. PROJECT DESCRIPTION: This project is for the Reach 6 levee and floodwall construction along the Corralitos Creek, a tributary of the Pajaro River Levee System in the City of Watsonville, County of Santa Cruz. The Project consisting of 2.6 miles of flood risk management levees with approximately 111,600 compacted cubic yards (cy) of fill, and 1,500 ft of floodwalls. The project area is located within the lower Pajaro River watershed. It encompasses an area of approximately 10,000 acres, which includes the stream channels, active floodplains, and terraces along the Pajaro River and the Salsipuedes and Corralitos Creeks. The area is divided by the Pajaro River, which serves as a border for two counties. Santa Cruz County lies to the north of the Pajaro River, and Monterey County lies to the south. The Salsipuedes and Corralitos Creeks, which join just north of the Pajaro River in Santa Cruz County, are tributaries of the Pajaro River. The engineered levees have a crest elevation of ranging from 2 to 8 feet, a minimum crest width of 20 feet, and 3H:1V side slopes. The access road, on top of the levee, will be surfaced with a minimum of 8 inches of CalTrans Class 2 Aggregate Base. Structural features included in the contract include 1,500 LF of 6 ft to 9 ft high floodwall walls. The Highway 152 Bridge will be raised approximately 6 ft and it is a separate project. The first 100 ft from boarding the bridge are left for future construction with the bridge. The solicitation will be available on/about 01 July 2025 for viewing/downloading. FAR Clause 52.222-34 PROJECT LABOR AGREEMENT IS INCLUDED IN THIS CONTRACT AS PRESCRIBED in FAR 22.505. BIDS will be due on 08 August at 12:00 PM PDT. The specific date and time will be identified in the solicitation. BIDDERS ARE ADVISED THAT THIS PROJECT MAY BE DELAYED, CANCELLED, OR REVISED AT ANY TIME DURING THE SOLICITATION, SELECTION, EVALUATION, AND/OR FINAL AWARD PROCESS. Plans and specs will not be provided in hard copy or CD format.NOTE:a) In preparation for prospective to submit offers when the IFB is issued, it is imperative that all prospective Offerors (including their subcontractors) must be registered in the System for Award Management (SAM - www.SAM.gov) and the Procurement Integrated Enterprise Environment (PIEE) website in order to be able to view and download solicitation information, and to submit offers.b) Solicitation documents, plans, and specifications are only available to be download from PIEE, which may be accessed at https://wawf.eb.mil OR https://piee.eb.mil OR https://piee.eb.mil/xhtml/unauth/home/login.xhtml.c) Offers MUST BE submitted electronically through the PIEE website.d) Registration should be completed one (1) week prior to the anticipated solicitation release date. USACE will not notify Offerors of any changes to the solicitation; Offerors must monitor PIEE and SAM for the solicitation to be posted, and for any posted changes or amendments.e) See attachments -PIEE Solicitation Module Vendor Access Instructions-, -SOP PIEE Proposal Manager Offeror-, and -SOP PIEE Posting Offer- for instructions on getting access to the PIEE Solicitation Module and submitting Offeror proposals.

Posted: Aug. 19, 2025, 5:21 p.m. EDT
Posted: Aug. 19, 2025, 3:32 p.m. EDT
Posted: Aug. 15, 2025, 5:54 p.m. EDT
Posted: Aug. 12, 2025, 7:52 p.m. EDT
Posted: Aug. 12, 2025, 7:18 p.m. EDT
Posted: July 31, 2025, 4:51 p.m. EDT
Posted: July 22, 2025, 7:25 p.m. EDT
Posted: July 16, 2025, 7:14 p.m. EDT
Posted: July 3, 2025, 7:14 p.m. EDT
Background
The Pajaro River Flood Risk Management Project, Reach 6, is being conducted by the U.S. Army Corps of Engineers (USACE), San Francisco District. The project aims to enhance flood risk management along the Corralitos Creek, a tributary of the Pajaro River Levee System in Watsonville, California. This initiative is part of a broader mission to protect communities from flooding and improve infrastructure resilience in the region.

Work Details
The project involves the construction of approximately 2.6 miles of levees and 1,500 feet of floodwalls designed to manage flood risks effectively. Key construction tasks include:
- Placement of approximately 111,600 compacted cubic yards (cy) of fill for levee construction.
- Construction of engineered levees with crest elevations ranging from 2 to 8 feet and a minimum crest width of 20 feet with side slopes at a ratio of 3H:1V.
- Surfacing the access road on top of the levee with a minimum thickness of 8 inches using CalTrans Class 2 Aggregate Base.
- Erecting floodwalls that range from 6 to 9 feet in height over a length of 1,500 linear feet.
- Raising the Highway 152 Bridge by approximately 6 feet as part of a separate project, ensuring coordination with future construction activities.

Place of Performance
The construction activities will take place in Watsonville, California, within Santa Cruz County and adjacent areas along the Pajaro River watershed.

Overview

Response Deadline
Aug. 28, 2025, 4:00 p.m. EDT (original: Aug. 8, 2025, 4:00 p.m. EDT) Past Due
Posted
July 3, 2025, 7:14 p.m. EDT (updated: Aug. 28, 2025, 6:38 p.m. EDT)
Set Aside
None
Place of Performance
95076
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
$25,000,000 - $100,000,000 (value based on agency estimated range)
On 7/3/25 USACE San Francisco District issued Solicitation W912P725BA012 for Pajaro River Reach 6 due 8/28/25. The opportunity was issued full & open with NAICS 237990 and PSC Y1PZ.
Primary Contact
Name
Logan Champlin   Profile
Phone
None

Documents

Posted documents for Solicitation W912P725BA012

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation W912P725BA012

Incumbent or Similar Awards

Contracts Similar to Solicitation W912P725BA012

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912P725BA012

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912P725BA012

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > W075 ENDIST SAN FRAN
FPDS Organization Code
2100-W912P7
Source Organization Code
100221302
Last Updated
Aug. 28, 2025
Last Updated By
logan.champlin@usace.army.mil
Archive Date
Sept. 15, 2025