Search Contract Opportunities

Outdoor Double-Ended Substation / BUILDING 206 SUBSTATION C/D REPLACEMENT PROJECT

ID: 5-S176-Q-00616-00 • Type: Solicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Do the documents mention an incumbent contractor?
Does this solicitation list any subcontracting requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: July 24, 2025, 2:12 p.m. EDT

PLEASE NOTE: TWO ADDENDUMS HAVE BEEN INCORPORATED INTO THIS SOLICITATION.

Argonne National Laboratory is seeking an outdoor double-ended Substation C/D and all components and accessories as described in the attached technical specifications and drawings.

Acceptable Manufacturers: Square D, Powell, SAI Advanced Power Solutions

Please review the Instructions for Offerors for all details related to the submission of a fixed price offer and provide a response no later than July 25, 2025, 5:00pm CDT.

  1. Appendix A Argonne Terms and Conditions for Commercial Items and Services, ANL-71-COM, dated 2/13/2023 (REVIEW)
  2. D-08-C Intellectual Property Provisions, Commercial Supplies and Services Requiring Delivery of Data, ANL 562IP dated 06/2020 (REVIEW)
  3. Statement of Work, Building 206 C/D Substation dated 5/27/2025 (REVIEW)
  4. Specifications, BUILDING 206 SUBSTATION C/D REPLACEMENT PROJECT dated 6/26/2025 (REVIEW)
  5. Progress Payments Based on Milestones, PD-133, dated 9/2/2015 (REVIEW)
  6. Control of Government-Owned Property Contractor Requirements, PD-150, dated 08/31/2023 (REVIEW)
  7. Property Management Self-Evaluation Questionnaire, ANL-642, dated 09/08/2023 (SIGN AND RETURN)
  8. Pre-Award Information, ANL-70B (Long Version) Reps & Certs, dated 01/13/2025 (SIGN AND RETURN)
  9. ANL-70 Request for Quotation, Inquiry 5-S176-Q-00616-00 (SIGN AND RETURN--Please complete all open fields on Page 1, and provide all fixed pricing based on the Task breakdown on Page 2. Any proceeding order will be awarded and scheduled based on the provided tasks).
  10. Proposal with details supporting the technical capability and adherance to the provided specifications (please remove pricing from this proposal)
  11. Lead Time
  12. Country of Origin (please see the requirements in the ANL-70 Request for Quotation for details)

Please send all other correspondence directly to the Contracting Officer. Questions and Answers will be accepted by 12:00pm CDT on July 18, 2025.

We look forward to your submission.

Posted: July 18, 2025, 2:22 p.m. EDT
Posted: July 10, 2025, 2:09 p.m. EDT
Background
Argonne National Laboratory is undertaking a project to replace the existing double-ended Substation C/D in Building 206. This initiative is split into two phases: Phase 1 involves the pre-purchase of the substation equipment, while Phase 2 will focus on the installation of this equipment by a contractor. The contract aims to procure an outdoor double-ended Substation C/D along with all necessary components and accessories as detailed in the provided technical specifications and drawings. The project emphasizes a structured approach where the construction contract will be Owner-purchased and Contractor-installed.

Work Details
The contract includes the following key deliverables and requirements:
- Provide detailed shop drawings of the substation for Argonne's review and approval.
- Build, fabricate, assemble, and ship a complete outdoor double-ended Substation to Argonne National Laboratory.
- The substation must meet specifications outlined in attached documents, including those from acceptable manufacturers such as Square D, Powell, and SAI Advanced Power Solutions.
- Functional validation, testing, and commissioning of the switchgear will be performed by the manufacturer after installation by the contractor (this is categorized under Option 1).
- Deliverables include proof of the manufacturer's track record for quality products, detailed shop drawings, OEM installation manuals, maintenance manuals, factory testing reports, and other relevant documentation.

Period of Performance
The period of performance includes various tasks with specific timing:
1. Submission of detailed shop drawings within one month following award.
2. Completion of substation hardware fabrication and assembly within 11 months following approval of shop drawings (subject to change based on actual lead time).
3. Shipment of substation equipment delivered to Argonne one month after completion of fabrication.
4. Optional field testing and commissioning to be completed four months after delivery.

Place of Performance
The installation of the substation will occur outside Building 206 at Argonne National Laboratory located at 9700 S Cass Avenue, Lemont, IL 60439.

Overview

Response Deadline
Aug. 1, 2025, 6:00 p.m. EDT (original: July 25, 2025, 6:00 p.m. EDT) Past Due
Posted
July 10, 2025, 2:09 p.m. EDT (updated: July 24, 2025, 2:12 p.m. EDT)
Set Aside
None
Place of Performance
IL 60439 United States
Source
SAM

Current SBA Size Standard
200 Employees
Pricing
Fixed Price
Est. Level of Competition
Average
Est. Value Range
Experimental
$2,000,000 - $5,000,000 (AI estimate)
On 7/10/25 Department of Energy issued Solicitation 5-S176-Q-00616-00 for Outdoor Double-Ended Substation / BUILDING 206 SUBSTATION C/D REPLACEMENT PROJECT due 8/1/25. The opportunity was issued full & open with NAICS 423610 and PSC 3040.
Primary Contact
Name
Molly Hunter   Profile
Phone
(630) 252-3094

Additional Contacts in Documents

Title Name Email Phone
None None smanasra@anl.gov None

Documents

Posted documents for Solicitation 5-S176-Q-00616-00

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 5-S176-Q-00616-00

Similar Active Opportunities

Open contract opportunities similar to Solicitation 5-S176-Q-00616-00

Additional Details

Source Agency Hierarchy
ENERGY, DEPARTMENT OF > ENERGY, DEPARTMENT OF > ARGONNE NATL LAB - DOE CONTRACTOR
FPDS Organization Code
8900-899031
Source Organization Code
500047664
Last Updated
Aug. 2, 2025
Last Updated By
mollyhunter@anl.gov
Archive Date
Aug. 1, 2025