Search Contract Opportunities

Ott Story Superfund Site Operable Unit #2 Groundwater Remedy Phase I   2

ID: W911XK23B0003 • Type: Solicitation

Description

Posted: July 13, 2023, 2:45 p.m. EDT

***Bid Abstract Posting June 27, 2023***Environmental Remediation Services Construction project to implement system upgrade recommendations for theOtt Story Superfund Site Operable Unit #2 Groundwater Remedy in Muskegon (Dalton Township), Michigan. Thedesign is intended to improve the effectiveness of the collection system to maintain contaminated groundwaterplume capture and contaminant mass removal for the OU1/OU2 remedy. The work includes the followingmajor items:a. Install new extraction wells, associated appurtenances, and connect to existing system. New wells are numberedto coordinate with existing wells: EW-2a, EW-3a, EW 4a, EW-5a, EW-6b.b. Installation of three new rehabilitation wells at each new EW location (total of 15 wells) to allow for chemicalrehabilitation of the well and aquifer immediately surrounding the well.c. Installation of below grade electrical conduit within concrete ductbank from each new EW location back to thecontrol panel.d. Installation of above-ground weatherproof enclosures for each new extraction well piping and flow measurementequipment.e. Upgrade and replace existing manifold piping and appurtenances in below grade EW vaults (EW-1, EW-2, EW-3,EW-4, EW-5, EW-7, EW-8 and EW-9) with PVC materials (3 inch diameter).f. Replace all system flow meters with consistent make/model.g. Install pressure gauges on collection lines E and F in Valve Vaults 1, 2 and 3. There are no existing gauges in thevaults. No comm or power wiring for gauges is required.h. Install new standby back-up power generation and control for the new well extraction well network.i. Upgrade controls infrastructure to allow remote monitoring of the expanded well extraction well network.j. Complete monitoring well abandonment actions to optimize the existing well network.All pre-field planning documents to include the Accident Prevention Plan, Health and Safety Plan, Well InstallationPlan, Work Plan, Quality Control (QC) Plan, and Environmental Protection Plan must be approved by theContracting Officer before construction work begins.Please note that some well locations may require 72 hour prior notice before being granted access to the site.

Posted: June 27, 2023, 3:03 p.m. EDT
Posted: May 25, 2023, 2:19 p.m. EDT

Overview

Response Deadline
June 27, 2023, 2:00 p.m. EDT Past Due
Posted
May 25, 2023, 2:19 p.m. EDT (updated: July 13, 2023, 2:45 p.m. EDT)
Set Aside
None
Place of Performance
Not Provided
Source
SAM

Current SBA Size Standard
$45 Million
Est. Level of Competition
Average
Signs of Shaping
62% of similar contracts within the Department of the Army had a set-aside.
On 5/25/23 USACE Detroit District issued Solicitation W911XK23B0003 for Ott Story Superfund Site Operable Unit #2 Groundwater Remedy Phase I due 6/27/23. The opportunity was issued full & open with NAICS 237110 and PSC F108.
Primary Contact
Name
Michelle Barr   Profile
Phone
(313) 226-2767

Secondary Contact

Name
Lisa May   Profile
Phone
(313) 226-3189

Documents

Posted documents for Solicitation W911XK23B0003

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation W911XK23B0003

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W911XK23B0003

Similar Active Opportunities

Open contract opportunities similar to Solicitation W911XK23B0003

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > LRD > W072 ENDIST DETROIT
FPDS Organization Code
2100-W911XK
Source Organization Code
500043193
Last Updated
July 13, 2023
Last Updated By
michelle.barr@usace.army.mil
Archive Date
July 15, 2023