Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA

ID: W9123625S13MA • Type: Sources Sought

Description

The citywide, Norfolk CSRM Program is split into five (5) implementation phases. Phase 1 covers the downtown Norfolk area which extends from Ghent through Downtown Norfolk, connecting to the Campostella off-ramp. Phase 1 is split into Phases 1A, 1B, and 1C/D. Phase 1A is split into three acquisitions: (1) Phase 1A Floodwall (DBB), (2) Harbor Park Pump Station (Design-Build), and (3) Newton's Creek Pump Station (DBB).

This SATOC Construction Contract is intended to cover the Phase 1A Floodwall, which will extend from the Berkley Bridge to the Campostella off-ramp. The Harbor Park and Newton's Creek pump stations are excluded from this contract. The scope may include, but is not limited to, new construction of a bin wall, L-shaped wall backfilled and supported by H-piles, a wetland living shoreline, T-wall supported by H-piles and pipe piles, 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks, vehicular gate crossings, and a sheet pile tieback wall. The Contractor shall be required to perform all work in accordance with the access and security requirements of the customer.

See attached document for addiitional information.

Background
The Norfolk Coastal Storm Risk Management (CSRM) Program is a citywide initiative divided into five implementation phases. Phase 1 focuses on the downtown Norfolk area, extending from Ghent through Downtown Norfolk to the Campostella off-ramp. This particular contract pertains to Phase 1A, which includes the construction of a Floodwall intended to enhance flood protection in the area.

The U.S. Army Corps of Engineers (USACE) Norfolk District is responsible for this project, which aims to mitigate storm risks and improve resilience against flooding.

Work Details
The SATOC Construction Contract for Phase 1A Floodwall encompasses various construction tasks including:
- new construction of a bin wall;
- an L-shaped wall that will be backfilled and supported by H-piles;
- a wetland living shoreline;
- a T-wall supported by H-piles and pipe piles;
- installation of a 95-foot-wide double swing gate closure at the Norfolk Southern railroad tracks;
- vehicular gate crossings; and
- a sheet pile tieback wall.

All work must comply with access and security requirements set forth by the customer.

Period of Performance
The anticipated period of performance for this contract is expected to span five years, during which multiple task orders will be issued.

Place of Performance
The construction projects will be performed in downtown Norfolk, Virginia, specifically extending from the Berkley Bridge to the Campostella off-ramp.

Overview

Response Deadline
June 19, 2025, 2:00 p.m. EDT Past Due
Posted
June 5, 2025, 11:04 a.m. EDT
Set Aside
None
Place of Performance
Norfolk, VA 23510 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Low
Odds of Award
43%
On 6/5/25 USACE Norfolk District issued Sources Sought W9123625S13MA for Norfolk CSRM - PH1A - Floodwall Construction SATOC DBB in Norfolk, VA due 6/19/25. The opportunity was issued full & open with NAICS 237990 and PSC Y1KA.
Primary Contact
Name
Raven D. Sasser   Profile
Phone
(757) 201-7136

Secondary Contact

Name
Candace Lotomau   Profile
Phone
(757) 201-7131

Documents

Posted documents for Sources Sought W9123625S13MA

Question & Answer

Incumbent or Similar Awards

Contracts Similar to Sources Sought W9123625S13MA

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought W9123625S13MA

Similar Active Opportunities

Open contract opportunities similar to Sources Sought W9123625S13MA

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > NAD > W2SD ENDIST NORFOLK
FPDS Organization Code
2100-W91236
Source Organization Code
100221786
Last Updated
June 5, 2025
Last Updated By
raven.d.sasser@usace.army.mil
Archive Date
Aug. 15, 2026