Search Contract Opportunities

NM BR AAO El Vado Heron & El Vado Road Rehab   3

ID: 6982AF25B000003 • Type: Solicitation • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Loading

Description

NM BR AAO EL VADO Heron & El Vado Road Rehabilitation

Competed as Total Small Business Set Aside

THIS IS A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE AVAILABLE.

Project Details: NM BR AAO EL VADO Heron & El Vado Road Rehabilitation

The proposed project is to rehabilitate the surfacing and improve parking lot operations. This project is being developed with a main schedule (Schedule A) and an option (Option X). Schedule A consists of the work associated with State Park Road 5001 located in El Vado State Park. Option X consists of the work associated with the access roads and parking lots located primarily within Heron Lake State Park.

This project includes full depth reclamation (FDR) of 5.23 total miles of asphalt roadway, which includes 4.61 miles along State Park Road 5001 in the El Vado State Park and 0.62 mile along the Willow Creek Boat Ramp Access Road in the Heron Lake State Park. FDR will be completed for three existing paved parking lots:

Heron State Park Visitors Center Parking Lot, Heron Lake State Park

Willow Creek Boat Ramp Parking Lot, Heron Lake State Park

Ridge Rock Parking Lot and adjacent access road, Heron Lake State Park.

Additionally, an existing gravel parking located within El Vado State Park will be paved.

Curb removal, new sidewalk, signing, pavement markings, and minor drainage improvements, primarily culvert cleaning, will also be part of the project.

PRINCIPAL WORK ITEMS: Approximate quantities of principal work items include:

  • 78,000 square yards of Full Depth Reclamation with Cement, 4-inch depth
  • 13,000 ton of Asphalt Concrete Pavement
  • 75 ton of Prime Coat, Method 1
  • 55 ton of Fog Seal
  • 33 miles of Pavement Markings, Type B, Solid
  • 500 cubic yards of Roadway Excavation
  • 2,100 ton of Roadway Aggregate, Method 2
  • 60 square yards of Sidewalk, Concrete
  • 15 Cleaning Culvert in Place
Background
The NM BR AAO EL VADO Heron & El Vado Road Rehabilitation project is initiated by the agency responsible for maintaining state parks in New Mexico. The primary goal of this contract is to rehabilitate the surfacing and improve parking lot operations within El Vado State Park and Heron Lake State Park. This project aims to enhance accessibility and safety for visitors while ensuring the longevity of the road infrastructure.

Work Details
The project consists of two main components: Schedule A and Option X. Schedule A involves full depth reclamation (FDR) of 5.23 miles of asphalt roadway, including 4.61 miles along State Park Road 5001 in El Vado State Park and 0.62 mile along the Willow Creek Boat Ramp Access Road in Heron Lake State Park.

The work includes FDR for three existing paved parking lots: Heron State Park Visitors Center Parking Lot, Willow Creek Boat Ramp Parking Lot, and Ridge Rock Parking Lot with adjacent access road, all located within Heron Lake State Park. An existing gravel parking area within El Vado State Park will also be paved.

Additional tasks include curb removal, new sidewalk installation, signing, pavement markings, and minor drainage improvements such as culvert cleaning. Principal work items include approximately 78,000 square yards of Full Depth Reclamation with Cement at a 4-inch depth, 13,000 tons of Asphalt Concrete Pavement, 75 tons of Prime Coat (Method 1), 55 tons of Fog Seal, 33 miles of Pavement Markings (Type B, Solid), 500 cubic yards of Roadway Excavation, 2,100 tons of Roadway Aggregate (Method 2), 60 square yards of Concrete Sidewalk, and cleaning of 15 culverts in place.

Place of Performance
The construction projects will take place primarily in El Vado State Park and Heron Lake State Park located in New Mexico.

Overview

Response Deadline
Dec. 12, 2025, 4:00 p.m. EST Past Due
Posted
Nov. 12, 2025, 3:57 p.m. EST (updated: March 5, 2026, 12:48 p.m. EST)
Set Aside
Small Business (SBA)
Place of Performance
Tierra Amarilla, NM United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
Experimental
$5,000,000 - $9,000,000 (AI estimate)
Signs of Shaping
71% of obligations for similar contracts within the Federal Highway Administration were awarded full & open.
On 11/12/25 Central Federal Lands Highway Division issued Solicitation 6982AF25B000003 for NM BR AAO El Vado Heron & El Vado Road Rehab due 12/12/25. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237310 (SBA Size Standard $45 Million) and PSC Y1LB.
Primary Contact
Name
Denise Martinez   Profile
Phone
None

Documents

Posted documents for Solicitation 6982AF25B000003

Opportunity Assistant


AI Analysis

Opportunity Lifecycle

Procurement notices related to Solicitation 6982AF25B000003

Contract Awards

Prime contracts awarded through Solicitation 6982AF25B000003

Incumbent or Similar Awards

Contracts Similar to Solicitation 6982AF25B000003

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 6982AF25B000003

Similar Active Opportunities

Open contract opportunities similar to Solicitation 6982AF25B000003

Experts for NM BR AAO El Vado Heron & El Vado Road Rehab

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 6982AF CENTRAL FEDERAL LANDS DIVISI
FPDS Organization Code
6925-00068
Source Organization Code
100173515
Last Updated
March 10, 2026
Last Updated By
jorey.deml@dot.gov
Archive Date
March 10, 2026