Search Contract Opportunities

MT FLAP BOR 2980(1), Sun River Bridge Replacement   4

ID: 69056724B000016 • Type: Sources Sought
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Draft a sources sought response template for this opportunity
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

This work consists of: building a new bridge about 200 feet downstream of the existing bridge, with new approach. The approaches are on embankments and MSE wall approaches. Final surfacing will be gravel for approaches and concrete on the bridge.The project includes construction of a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10 foot diameter drilled shafts.

Background
The project is a part of the MT FLAP BOR 2980(1), Sun River Bridge Replacement, and it involves building a new bridge about 200 feet downstream of the existing bridge with new approaches. The project is located approximately 50 miles NW of Augusta, Montana. The work may include an option for demolition of the existing steel truss bridge upon completion of the new structure.
The estimated period of performance is from 2025 through summer 2026.

Work Details
The work consists of building a 3 span, 462-foot long precast-post-tensioned girder bridge with a precast concrete deck. Abutments are founded on both spread footing and piles within an MSE wall fill. Piers are supported on 10-foot diameter drilled shafts. The project includes construction of embankments and MSE wall approaches, river diversions, temporary work bridges, drilling platforms, large drilling and crane equipment disassembly and reassembly, concrete batch plant setup, sensitive Native American presence considerations, and steep temporary access roads and work areas construction.

Period of Performance
The estimated period of performance is from 2025 through summer 2026.

Place of Performance
The project is located approximately 50 miles NW of Augusta Montana.

Overview

Response Deadline
May 28, 2024, 3:00 p.m. EDT Past Due
Posted
April 26, 2024, 3:34 p.m. EDT
Set Aside
None
Place of Performance
Augusta, MT 59410 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Low
Odds of Award
20%
On 4/26/24 Western Federal Lands Highway Division issued Sources Sought 69056724B000016 for MT FLAP BOR 2980(1), Sun River Bridge Replacement due 5/28/24. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Contracts G. Office   Profile
Phone
(360) 619-7520
Fax
(360) 619-7932

Documents

Posted documents for Sources Sought 69056724B000016

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Sources Sought 69056724B000016

Award Notifications

Agency published notification of awards for Sources Sought 69056724B000016

Contract Awards

Prime contracts awarded through Sources Sought 69056724B000016

Incumbent or Similar Awards

Contracts Similar to Sources Sought 69056724B000016

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought 69056724B000016

Similar Active Opportunities

Open contract opportunities similar to Sources Sought 69056724B000016

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 690567 WESTERN FEDERAL LANDS DIV
FPDS Organization Code
6925-00070
Source Organization Code
100163919
Last Updated
Oct. 1, 2024
Last Updated By
robert.kolln@dot.gov
Archive Date
Sept. 30, 2024