Search Contract Opportunities

Microplastic removal technologies for wastewater and stormwater

ID: 1F • Type: SBIR / STTR Topic • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Do the documents mention an incumbent contractor?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

New, cost-effective technologies, or optimization methods for existing technologies, which demonstrate high percentage removal rates of microplastics (5mm or less in size) from stormwater flows or wastewater effluent.

Overview

Response Deadline
Aug. 3, 2021 Past Due
Posted
June 16, 2021
Open
June 16, 2021
Set Aside
Small Business (SBA)
Place of Performance
Not Provided
Source
Alt Source

Program
SBIR Phase I
Structure
Contract
Phase Detail
Phase I: Establish the technical merit, feasibility, and commercial potential of the proposed R/R&D efforts and determine the quality of performance of the small business awardee organization.
Duration
6 Months
Size Limit
500 Employees
On 6/16/21 Environmental Protection Agency issued SBIR / STTR Topic 1F for Microplastic removal technologies for wastewater and stormwater due 8/3/21.

Documents

Posted documents for SBIR / STTR Topic 1F

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Contract Awards

Prime contracts awarded through SBIR / STTR Topic 1F

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to SBIR / STTR Topic 1F

Similar Active Opportunities

Open contract opportunities similar to SBIR / STTR Topic 1F