Search Contract Opportunities

Maintenance Dredging, Kennebec River, Kennebec Maine

ID: W912WJ26BA015 • Type: Solicitation • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Maintenance Dredging, Kennebec River, Kennebec Maine. The work involves maintenance dredging for the USN of three portions of the authorized, 27-foot deep, 500-foot wide FNP in the Lower Kennebec River. Dredging is required to meet the navigational requirements of newly constructed surface combatants being built and tested at Bath Iron Works (BIW). The proposed work consists of dredging approximately 80,000 cubic yards (cy) of clean sand (approximately 30,000 cy of required material and 50,000 cy of overdepth (OD) material). Approximately 61,000 cy of material will be removed from the Doubling Point area (i.e., just below Bath), and approximately 10,000 cy of material will be removed from the Popham Beach area (at the river mouth). In addition to the historically dredged sites, this proposed maintenance dredging includes dredging approximately 9,000 cy of material will be removed from Bath Reach (just below the Carlton Bridge and adjacent to BIW). As part of this proposal, maintenance dredging will be performed to remove the sand-waves in the vicinity of Doubling Point to an elevation of -32 feet MLLW +2 feet overdepth (OD) to improve the chance that adequate depths will endure. The 61,000 cy to be removed from the channel at Doubling Point includes dredging to an elevation of -32 feet MLLW +2 feet OD. Material dredged from the Bath Reach area and the Doubling Point area will be placed in the previously used in-river disposal area north of Bluff Head in about 45-90 feet of water. Material dredged from the Popham Beach area will be placed at a newly established nearshore placement site called Jackknife Ledge West Disposal Site, in about 45-30 feet of water. This site is just northwest of the previously used Jackknife Ledge placement site. The dredging and dredged material placement work is expected to take 3-4 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 December 2026 to 15 February 2027.
Loading Map
Loading Map

Overview

Response Deadline
July 28, 2026, 1:00 p.m. EDT Due in 42 Days
Posted
June 15, 2026, 10:15 a.m. EDT
Set Aside
None
Place of Performance
Kennebec River, Bath and Phippsburg Maine ME USA
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
Experimental
$1,200,000 - $3,000,000 (AI estimate)
On 6/15/26 USACE New England District issued Solicitation W912WJ26BA015 for Maintenance Dredging, Kennebec River, Kennebec Maine due 7/28/26. The opportunity was issued full & open with NAICS 237990 and PSC Y1QA.
Primary Contact
Name
Elizabeth Glasgow   Profile
Phone
(978) 318-8671

Documents

Posted documents for Solicitation W912WJ26BA015

Opportunity Assistant


AI Analysis

AI Generate

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912WJ26BA015

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912WJ26BA015

Experts for Maintenance Dredging, Kennebec River, Kennebec Maine

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > NAD > W2SD ENDIST NEW ENGLAND
FPDS Organization Code
2100-W912WJ
Source Organization Code
100221388
Last Updated
June 15, 2026
Last Updated By
elizabeth.k.glasgow@usace.army.mil
Archive Date
June 15, 2027