Search Contract Opportunities

MACC PoP Extension and Ceiling Increase J&A   3

ID: FA860119RA043 • Type: Justification • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

The services required are for a broad range of design-bid-build construction, design/build construction, maintenance, additions, alterations, sustainment, energy efficiency, infrastructure, repair and demolition work on real property at Wright- Patterson AFB, OH. The scope, as detailed in the Statement of Work, includes providing all management, labor, materials, equipment, and supervision to accomplish multiple concurrent projects. These projects span a variety of facilities, including research and development, hospital, secure areas, airfields, flight lines, infrastructure, and administrative buildings. This PoP extension/ceiling increase for the twelve (12) incumbent MACC contractors will ensure these ongoing and emergent requirements continue to be met without interruption.

Background
The Air Force Life Cycle Management Center (AFLCMC) is responsible for managing the Multiple Award Construction Contract (MACC) at Wright-Patterson AFB, OH. The agency's mission includes ensuring the continuity of critical construction and maintenance services necessary to support over 110 tenant organizations on base, many of which directly support the warfighter.

This justification outlines the need for a Period of Performance (PoP) extension and ceiling increase to maintain uninterrupted services while a follow-on competitive MACC IDIQ procurement is completed.

Work Details
The contract encompasses a broad range of services including design-bid-build construction, design/build construction, maintenance, additions, alterations, sustainment, energy efficiency improvements, infrastructure repair, and demolition work on real property at Wright-Patterson AFB.

The scope requires providing all management, labor, materials, equipment, and supervision to accomplish multiple concurrent projects across various facilities such as research and development centers, hospitals, secure areas, airfields, flight lines, infrastructure projects, and administrative buildings.

The extension will ensure that ongoing and emergent requirements are met without interruption by the twelve incumbent MACC contractors: PCI - Megen Joint Venture (JV) LLC; CPM - AWA LLC; Peak Runge Company JV; John Cecil Construction LLC; Nisou LGC JV LLC; CAM Management LLC; Pontiac Drywall Systems Inc.; OAC Action Construction; Butt Construction Company, Inc.; A&H - Ambica JV LLC; Pinnacle Construction; and Dawn Construction, Inc.

Period of Performance
The initial one-year period will commence on May 1, 2026 and run through April 30, 2027. There are also two six-month option periods that may be exercised if necessary.

Place of Performance
Wright-Patterson Air Force Base (AFB), Ohio

Incumbent Analysis (see Incumbents section for more detail)
This opportunity appears to have a confirmed incumbent base under the existing MACC at Wright-Patterson AFB, with multiple awardees holding current MACC IDVs that run through the requested extension period. Confirmed incumbents include Butt Construction Company (FA860121D0010, $31,208,968; 10/28/20–04/30/26), Dawn (FA860121D0011, $29,580,919; 10/28/20–10/31/25), and CAM Management And Services (FA860121D0007, $28,250,156; 10/28/20–04/30/26), among others. The prior work is consistent with a continuation of the same MACC construction and sustainment mission—design-bid-build/design-build construction, maintenance, alterations/sustainment, and related real property repairs/demolition across base facilities—supporting ongoing and emergent requirements without interruption.

Overview

Award Date
April 29, 2026
Response Deadline
None
Posted
May 7, 2026, 10:41 a.m. EDT
Set Aside
None
NAICS
None
Place of Performance
Wright Patterson AFB, OH 45433 United States
Source

Est. Level of Competition
Sole Source
Vehicle Type
Indefinite Delivery Contract
On 5/7/26 AFLCMC Wright Patterson AFB issued Justification FA860119RA043 for MACC PoP Extension and Ceiling Increase J&A.
Primary Contact
Name
Madeleine Palmer   Profile
Phone
None

Secondary Contact

Name
Ryan Prickett   Profile
Phone
None

Documents

Posted documents for Justification FA860119RA043

Opportunity Assistant


AI Analysis

AI Generate

Opportunity Lifecycle

Procurement notices related to Justification FA860119RA043

IDV Awards

Indefinite delivery vehicles awarded through Justification FA860119RA043

Contract Awards

Prime contracts awarded through Justification FA860119RA043

Incumbent or Similar Awards

Contracts Similar to Justification FA860119RA043

Potential Bidders and Partners

Awardees that have won contracts similar to Justification FA860119RA043

Similar Active Opportunities

Open contract opportunities similar to Justification FA860119RA043

Experts for MACC PoP Extension and Ceiling Increase J&A

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE AIR FORCE > AFMC > AIR FORCE LIFE CYCLE MANAGEMENT CENTER > FA8601 AFLCMC PZIO
FPDS Organization Code
5700-FA8601
Source Organization Code
500020367
Last Updated
June 6, 2026
Last Updated By
ryan.prickett@us.af.mil
Archive Date
June 6, 2026