TITLE: Long Lead Equipment HV Transformer Procurement for SLAC Critical Utilities Infrastructure Revitalization Project: Request for Industry Input
DESCRIPTION
Many of SLAC's utilities were installed in the 1960s as part of the original laboratory construction. These original utilities were not designed to support the experimental parameters needed for science research today and in the future. The purpose of the Critical Utilities Infrastructure Revitalization (CUIR) project is to modernize utility infrastructure to provide reliable and sustainable operations, enabling SLAC National Accelerator Laboratory (SLAC) to remain mission-ready and enhance the impact of Department of Energy (DOE) scientific programs.
To reduce supply chain and scheduling impacts on the project, SLAC is currently procuring critical long lead electrical equipment, including high voltage and medium voltage transformers as Government Furnished Property (GFP), which will be provided to the future subcontractor for installation.
SLAC intends to replace the two existing High Voltage (HV) Transformers currently installed outdoor at the Master Substation (MSS). An RFP was released in February 2023 in an attempt to procure the transformers. However, due to the current market situation, feedback was not successful. The CUIR team is actively planning the re-issuance of this RFP, target to obtain the two transformers in time to fit into Design-Build contract scope. We are issuing this Pre-Solicitation to request your input on current industry lead time and trends so we can modify the RFP and obtain a successful bid.
PLANNED SCOPE OF EQUIPMENT
The following are the preferred technical parameters as stated in the draft documents for the two transformers.
Quantity Two
Type of Transformer 3 Phase or Single Phase - 3 Phase
Dielectric liquid Natural Ester (FR3) preferred but other alternate option is also accepted.
Frequency 60 Hz
Cooling System KNAN/KNAF/KFAF preferred but other alternate option is also accepted.
MVA Rating - 65/86.7/108.3
Voltage - 230-12.47 kV
Minimum Impedance at Base MVA - 15 %
Maximum Impedance at Base MVA - 15 x 1.075 = 16.125
Vector group - Dyn1
Tap Changer - Yes (on load) in LV Winding
Tap Voltage (Primary DETC) - N/A
Tap Voltage (Secondary OLTC) - Neutral +15%/-5%
Copper temperature rise in oC under continuous rated power 65 oC
Basic Lightning Impulse Insulation Levels (BIL, kV) - 750-110 kV
Connection Diagram - H1/H2/H3-X1/X2/X3/X0
Maximum short-circuit current for 2 seconds for
High voltage Winding - 20 kA
Low voltage Winding - 40 kA
PLANNED SCOPE OF SERVICES
Please review the draft specification document CUIR-PTS-0064 and identify the factors within our specifications that could potentially be revisited to accommodate flexibility in meeting the requirements with your products. While reviewing the specification few factors must be considered
- These transformers will be installed at a brown field site.
- Space is a big constraint, so the new transformers must be as compact as possible but meet all the technical requirement as per IEEE C57.
- The transformer is close to existing building so existing fire separation/protection and containment may need to be modified. The intent is to procure a transformer to minimize such upgrades needed.
- Can transformer meet its MVA rating with two stages forced air cooling (ONAN/ONAF1/ONAF2) instead of one stage fan and one stage forced oil cooling (KNAN/KNAF/KFAF)?
- Is the base rating of 65 MVA an unusual size? Is there a more common base rating or triple rating that would be more standard for vendors and reduce cost and delivery time.
- Is the minimum and maximum impedance an issue? Are there more standard impedance ranges that would meet our requirements, and reduce the amount of engineering needed for our Transformer?
PRELIMINARY PROCUREMENT TIMELINE
Preliminary procurement timeline for HV Transformer LLE procurement, delivery and installation is presented below based on current understanding of market conditions and project schedule.
Activity - Planned Timeframe*
- Pre-Solicitation due date - December 2023
- RFP Issuance date - March 2024
- LLE award - September 2024
Estimated Delivery -
- Installation of Transformer 1- October 2027
- Installation of Transformer 2- November 2028
*Schedule is subject to change
REQUEST FOR INDUSTRY INPUT
In order to improve the HV Transformer Long Lead Equipment solicitation, SLAC would like to seek industry input on the following prior to procurement of the above services. The following information is requested from parties interested in this procurement:
- Rough order of magnitude cost estimate
- Rough order of magnitude delivery time for first and second transformer unit after receipt of order. Will there be any advantages in procuring both transformers at the same time? Please delineate between lead times needed for design, manufacturing, and delivery
- Identify if there is potentially opportunity to improve delivery time if an expedite fee were to be paid, and rough order of magnitude or percentage cost estimate.
- If possible, please identify current manufacturing capacity availability.
- Please identify the factors within our specifications that could potentially be revisited to accommodate flexibility in meeting the requirements within your products.
- Share insights into current industry trends concerning mineral oil-filled transformers, natural ester-filled oil transformers, and Fire Marshall (FM) Approved transformers.
- Is your company product a domestic or foreign end product and the location of your manufacturing facility?
SLAC will consider industry input received in the upcoming High Voltage Transformer Long Lead Equipment solicitation. Please provide your response to Stephanie Low at <stephl@slac.stanford.edu> by 5pm on December 19, 2023. Include your company's name, local office address and point of contact (phone number and email address) as part of the response. We anticipate written responses to be no more than 2 pages long (up to 1000 words).
PRE-SOLICITATION DISLAIMER:
Please note that any responses to this pre-solicitation posting is purely on a voluntary basis. SLAC is not requesting a proposal nor any pricing or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information or confidential information will be discarded by SLAC.
Background
Many of SLAC’s utilities were installed in the 1960s as part of the original laboratory construction. The purpose of the Critical Utilities Infrastructure Revitalization (CUIR) project is to modernize utility infrastructure to provide reliable and sustainable operations, enabling SLAC National Accelerator Laboratory (SLAC) to remain mission-ready and enhance the impact of Department of Energy (DOE) scientific programs. To reduce supply chain and scheduling impacts on the project, SLAC is currently procuring critical long lead electrical equipment, including high voltage and medium voltage transformers as Government Furnished Property (GFP), which will be provided to the future subcontractor for installation.
Work Details
The planned scope of equipment includes procuring two transformers with specific technical parameters such as type, dielectric liquid, frequency, cooling system, MVA rating, voltages range, impedance, vector group, tap changer, tap voltage, temperature rise, insulation levels, connection diagram, and short-circuit current. Additionally, the solicitation requests industry input on factors that could potentially be revisited to accommodate flexibility in meeting the requirements with products.
The preliminary procurement timeline outlines key dates for pre-solicitation due date, RFP issuance date, LLE award, estimated delivery and installation of transformers.
Period of Performance
The estimated delivery for the installation of Transformer 1 is October 2027 and for Transformer 2 is November 2028. The schedule is subject to change.
Place of Performance
The product will be delivered to SLAC National Accelerator Laboratory (SLAC) located at Stanford University in California.