Search Contract Opportunities

Chiller System Maintenance

ID: 36C24127Q0080 • Notice Type: Special Notice • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Analyze Opportunity
Generate a Draft
Loading

Description

The Department of Veterans Affairs, Networking Contracting Office (NCO 01) located in Brockton, MA intends to enter into a sole source procurement, pursuant to the authority of FAR 6.302-1, with TRANE, for the following requirement: STATEMENT OF WORK SCOPE OF WORK The Contractor shall provide all supervision, personnel, material, parts, equipment, supplies, labor and transportation in performing basic preventive maintenance on the chiller systems, Ensemble controls and equipment as listed in Attachment A and located at the Department of Veterans Affairs Medical Center, 1400 VFW Parkway, West Roxbury, MA 02132 in accordance with all terms and conditions of this task order and accepted quotation. Period of Performance: This will be a firm-fixed price, base year plus four option years task order. DEFINITIONS/ACRONYMS Contract Discrepancy Report (CDR) : A report that the Government shall complete and issue to the Contractor when service is unsatisfactory and not in compliance with the terms and conditions of the contract. The Contractor is required to complete and return this form to the COR whenever performance is unsatisfactory. The CDR requires the Contractor to explain, in writing, the cause of the unsatisfactory performance, how performance will be returned to acceptable standards, and how reoccurrence of the problem will be prevented in the future. Contracting Officer (CO): The individual with the authority to enter into, administer, and/or terminate contracts. The CO is the exclusive Government official authorized to execute changes and deviations or variations in the contract. Contracting Officer's Technical Representative (COTR) : A Government representative, designated in writing by the Contracting Officer, to be responsible for quality assurance, inspection, surveillance, documentation and acceptance of the Contractor's performance. A copy of the letter of designation will be provided to the Contractor. Preventive Maintenance (PM): Services which are periodic in nature and are required to maintain the equipment in such condition that it may be operated in accordance with its intended design and functional capacity with minimal incidence of malfunction or inoperative conditions. To clean, lubricate, calibrate, and test the equipment and/or instrument to the operating condition defined in the manufacturer s specifications. Repair Cost Estimate: The Contractors estimated cost (for parts, labor and freight) to repair a system according to manufactures' specifications and requirements. These repairs are covered under Emergency Service and repairs outside of routine maintenance. Time: When hours are given it shall mean clock hours exclusive of Saturdays, Sundays and Holidays unless otherwise specified (i.e., 1:00 P.M. Monday to 1:00 P.M. Tuesday equals 24 hours; 12:00 P.M. Friday to 12:00 P.M. Monday equals 24 hours). If days are indicated it shall mean calendar days including Saturdays, Sundays and Holidays. Rework. The Contractor is required to correct and/or re-work any PM services due to unsatisfactory performance or nonperformance in accordance with the stated quality and level of effort in the PWS and final contract. Rework is performed at no additional cost to the Government. ESR. Vendor Engineering Service Report. A documentation of services rendered for each incidence of work performance under the terms and conditions of the contract. Acronyms. Commonly used acronyms are listed below FSE: Field Service Engineer AQL: Acceptable Quality Level IAW: In Accordance With QA: Quality Assurance QC: Quality Control WS: Performance Work Statement VA: VA Medical Center CO: Contracting Officer COTR:Contracting Officer s Technical Representative FES: Facilities and Engineering Service PREVENTIVE MAINTENANCE REQUIREMENTS Within 14 calendar days of Notice to Proceed, the vendor will submit to the COTR a written schedule of the planned PM visits for the coming year along with a written description of the work to be performed during each visit. The following is the scope of services to be performed on Covered Equipment. Items marked with an X are included in this contract. Services Included Cooling Seasonal Service Services Included Heating Seasonal Service X Seasonal Start-up Seasonal Start-up X Operating Inspections Qty Operating Inspections Qty X System Shutdown System Shutdown X Annual Seasonal Maintenance Annual Seasonal Maintenance Services Included Labor and Materials for Covered Equipment X Scheduled Maintenance Labor X Scheduled Maintenance Parts and Materials X Repair Labor: Repairs will be performed on covered equipment during Trane regular business hours Select Agreement Repair Parts and Materials Select Agreement X Overtime Repair Labor for Emergency Failures (outside Trane regular business X Refrigerant Monitor Inspection. Testing and Calibration once per year Refrigerant Replacement 0% of Charge per unit per year X Refrigerant Usage Reporting Other Services Included Predictive Testing and Analysis for Covered Equipment Chiller(s) Only X Spectrographic Oil Analysis Trending oil analysis provides insight into potential X Refrigerant Analysis Provides early warning of internal failure X KestrelView Analysis Requires Trane laptop and Trane software X Oil Removal and Disposal by Trane in accordance with EPA Guidelines X Oil Change Services Included Additional Services X Air-cooled condenser coil cleaning once per year X Clean Cooling Tower(s) once per year X Condenser Tube Cleaning & Evap Tube Cleaning once per year X Starter Maintenance 600 volt volt starter X Eddy Current Test of tubes every 2 years Other Chiller overhaul every 5 years was included in the current contract SOW Equipment Maintenance Procedures: TRANE CENTRIFUGAL CHILLERS (Low Pressure Units) COMPREHENSIVE ANNUAL INSPECTION SERVICE TRANE CTV-512 Report in with the COTR and sign log with name, date and time. Record and report abnormal conditions, measurements taken, etc. Review customer logs with the customer for operational problems and trends. General Assembly Inspect for leaks and report leak check results to the customer. Provide reports at the end of each visit. Repair minor leaks as required (e.g. valve packing, flare nuts). Provide reports at the end of each visit. Calculate refrigerant loss rate and report to COR. Provide report at end of each visit. Replace the filter / drier on the motor cooling line, in accordance with mfg specifications. Test the security of mounting points; tighten all major points. Controls and Safeties Inspect control panel for cleanliness. Inspect wiring and connections for tightness and signs of overheating and discoloration. Verify the working condition of all indicator/alarm lights. Verify the operation of all timing devices. Verify the operation of the oil temperature thermostat. Calibrate and record setting and provide report to COR. Verify the operation of the low oil temperature safety device. Calibrate and record setting. Test the high discharge pressure safety device. Calibrate and record setting. Test the high suction temperature switch. Calibrate and record setting. Test the high discharge temperature safety device. Calibrate and record setting. Test the low suction pressure safety device. Calibrate and record setting. Test the low pressure override switch. Calibrate and record setting. Test the low leaving water temperature control device. Calibrate and record setting. Lubrication System Pull oil sample for spectroscopic analysis. Change oil Test oil for acid content and discoloration. Make recommendations to the COTR based on the results of the test. Inspect oil pump motor terminals for tightness and signs of overheating and discoloration. Measure and record oil pump motor voltage and amperage. Verify the operation of the oil heater. Measure amps and compare reading with the watt rating of the heater. Motor and Starter Clean the starter and cabinet. Inspect the wires and starter components for tightness and signs of overheating and discoloration. Verify the operation of the transition/system timer. Check the condition of the contacts for wear and pitting. Check the contactors for free and smooth operation. Check the mechanical linkages for wear, security, and clearances. Verify the operation of the electrical interlocks. Check the dash pots oil for level, rust, and/or moisture. Meg the motor and record readings. Check the motor terminals for cracks and/or leaks. Measure voltage and record reading. Voltage should be nominal voltage 10%. STARTUP / CHECKOUT PROCEDURE CTV-520 Verify the operation of the oil heater and that the oil temperature is at least 110 F before starting the chiller. Verify full water systems, including the cooling tower, the condenser and the evaporator. Verify clean cooling tower and strainers. Start the condenser water pump, chilled water pump, and cooling tower fan(s). Verify flow rates through the condenser and the evaporator. Test all flow-proving devices on the chilled water and condenser water circuits. Start the chiller. Verify the starter operation. Verify the operation of all timing devices. Check the load limit relay for set point, hunting, and unloading capability. Check the mechanical limits on both vane arms. Verify smooth movement of vane arms. Check the set point and sensitivity of the chilled water temperature control device. Verify the operation. Verify the operation of the condenser water temperature control device. Verify the motor cooling operation. Shut down the chiller. Check the oil and refrigerant levels, if levels are low provide leak rate calculation report to COR. (If the refrigerant charge needs correction, the refrigerant, and the labor to install it, are not included.) Re-start chiller and log the operating conditions after the system has stabilized. Review operating procedures with operating personnel. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. MID-SEASON RUNNING INSPECTION CTV-530 Check the general operation of the unit. Log the operating temperatures, pressures, voltages, and amperages. Check the operation of the purge unit. Check the operation of the control circuit. Check the operation of the lubrication system. Check the operation of the motor and starter. Analyze the recorded data. Compare the data to the original design conditions. Review operating procedures with COTR. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. SEASONAL SHUT-DOWN PROCEDURE CTV-550 Check the general operation of the unit. Shut down the chiller, pumps and auxiliary equipment. Drain the condenser and chilled water piping. Turn off equipment power as necessary. Review operating procedures with COTR. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. CONDENSER CLEANING WATER-COOLED CONDENSERS BRUSH TUBES (600 Tubes/Day) CDS-210 Pull easy end head, both ends Brush tubes. NOTE: The term easy end head refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit s having marine boxes. LUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130 Change the oil and filter, using factory-recommended oil and filter every year. COOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210 Report in with the COTR. Record and report abnormal conditions, measurements taken, etc. Review customer logs with the customer for operational problems and trends. General Assembly STRUCTURE Disassemble all screens and access panels for inspection. Inspect the conditions of the slats. Inspect the condition of the tower fill. Inspect the condition of the support structure. Inspect the condition of the basins (upper and lower), spray nozzles, and olson pan. Make necessary repairs to basins and replace nozzles if any issues. Verify clean basins and strainer(s). Verify the condition and operation of the basin fill valve system. Fill basin MECHANICAL Inspect gear box for leaks. Inspect drive and coupling for condition and security Inspect fan assembly for condition, security, and clearances (e.g. blade tip clearance). Lubrication Lubricate motor bearings. Check gear box oil level. Motor and Starter Clean the starter and cabinet. Inspect wiring and connections for tightness and signs of overheating and discoloration. Check condition of the contacts for wear and pitting. Check contactor(s) for free and smooth operation. Meg the motor and record reading. Check disconnect terminal block for wear, tightness and signs of overheating and discoloration. Check the condition and operation of the basin heater contactor(s). STARTUP / CHECKOUT PROCEDURE CLT-220 Fill the basin and verify float level. Verify the operation of the basin heaters. Verify the operation, set point, and sensitivity of the basin heater temperature control device. Start the condenser water pumps. Verify the balance of the return water through the distribution boxes. Verify proper operation of the bypass valve(s), if applicable. Operate the fan(s) and verify smooth operation. Log operation after the system has stabilized. Review operating procedures with COTR. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. MID-SEASON RUNNING INSPECTION CLT-230 Check the general condition of the tower. Verify clean basins and strainers (upper and lower) and/or spray nozzles. Note, Building 20 strainer cleaning required for mid-season inspection. Verify proper water level in the basin. Verify proper operation of the water level control device. Verify smooth operation of the fan(s). Verify proper operation of the bypass valve(s). Review operating procedures with COTR. Provide a written report of completed work, operating log, and indicate uncorrected deficiencies detected. DIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110 Report in with the COTR Record and report abnormal conditions, measurements taken, etc. Review customer logs with the customer for operational problems and trends. General Assembly Check motor shaft and pump shaft for alignment. Inspect the coupling for wear. Verify that the shaft guard is in place and tight. Verify water flow through the pump. Check for leaks on the mechanical pump seals. Verify proper drip rate on the pump seal packing. Verify smooth operation of the pump. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. Lubrication Lubricate the motor bearings as necessary. Lubricate the pump bearings as necessary. Motor and Starter Clean the starter and cabinet. Inspect wiring and connections for tightness and signs of overheating and discoloration. Meg the motor. Verify tight connections on the motor terminals. Check the condition of the contacts for wear and pitting. Check the contactors for free and smooth operation. Verify proper volts and amps. PUMP RUN INSPECTION PMP-111 Verify smooth operation of the pump. Check for leaks on the mechanical pump seals. Verify proper drip rate on the pump seal packing. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. VARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130 Report in with the COTR. Record and report abnormal conditions, measurements taken, etc. Review customer logs with the customer for operational problems and trends. Clean the heat sinks. Inspect wiring and connections for tightness and signs of overheating and discoloration. Visually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture. Verify proper operation of the unit. Verify proper DC buss voltage. TRANE CENTRIFUGAL CHILLERS W-C (CVHE/F Style Units) COMPREHENSIVE ANNUAL INSPECTION SERVICE ELECTRONIC CTV-210 Report in with the Customer Representative. Record and report abnormal conditions, measurements taken, etc. Review customer logs with customer for operational problems and trends. General Assembly Check and record refrigerant level. Inspect for leaks and report leak results (yearly). The refrigerant should be correct before starting the leak check. To prevent unnecessary venting of refrigerant, EPA-recommended methods (e.g. hot water and/or electric blankets) must be used to pressurize the vessels. In order to use EPA-recommended methods, certain conditions must be met: The isolation valves on the chilled water and condenser water lines must shut off the circulation completely. The temperature of the equipment room should be 70 F or higher. Access connections to the condenser water and chilled water circuits must be provided (customer s responsibility). If these conditions cannot be met, the refrigerant must be removed and the vessel pressurized, using dry nitrogen and a trace gas. This additional procedure is within the scope of this agreement. Calculate refrigerant loss and report to the COTR. Repair minor leaks as required (e.g., valve packing, flare nuts). Visually inspect condenser tubes for cleanliness. Check internal vanes for free and smooth operation. Check mechanical linkages for wear. Purge Check purge unit controls for proper operation. Check and clean purge drum as required. Clean the condenser coil. Clean strainers or replace filters as required. Check the purge compressor assembly for leaks as required. Check the purge unit for proper operation. Controls and Safeties Verify all settings in the electronic control panel. Inspect the control panel for cleanliness. Inspect wiring and connections for tightness and signs for overheating and discoloration. Verify the operation of the vane control system: Verify the working condition of all indicator/alarm lights and LED/LCD displays. Verify the operation of the oil sump temperature control device. Test high condenser pressure safety device. Calibrate and record setting. Test low evaporator temperature safety device. Calibrate and record setting. Test low oil pressure safety device. Calibrate and record setting. Test high motor temperature safety device. Calibrate and record. Test operation of chilled water pump and condenser water pump starter auxiliary contacts. Lubrication System Pull oil sample for spectroscopic analysis. Check oil for acid content and discoloration. Make recommendations to the customer based on the results of the test. Measure and record the oil pump voltage and amperage. Verify the operation of the oil heater. Measure amps and compare readings with the watt rating of the heater. Change the oil and oil filter. Verify the oil level. Motor and Starter Clean the starter and cabinet. Inspect wiring and connections for tightness and signs of overheating and discoloration. Check condition of the contacts for wear and pitting. Check contactors for free and smooth operation. Check the mechanical linkages for wear, security, and clearances. Check tightness of the motor terminal connections. Meg the motor and record reading. Verify the operation of the electrical interlocks. STARTUP / CHECKOUT PROCEDURE CTV-220 Verify the operation of the oil heater and that the oil temperature is at least 110 F before starting the chiller. Verify full water systems, including the cooling tower, condenser and evaporator. Verify clean cooling tower and strainers. Start the condenser water pump, chilled water pump, and cooling tower fan(s). Test all flow-proving devices on the chilled water and condenser water circuits Verify the flow rates through the condenser and the evaporator. Start the chiller. Verify the operation of all timing devices. Verify the operation of the current control device. Check the set point and sensitivity of the chilled water temperature control device. Verify the operation. Verify the operation of the condenser water temperature control device. Check the mechanical limits of both vane arms. Verify smooth movement of vane arms through the full range of operation. Check the starter operation. Verify the motor cooling operation. Check the purge operation. Shut down the chiller. Check the oil and refrigerant levels, provide leak rate calculation report if levels are low. Re-start the chiller and log the operating conditions after the system has stabilized. Review operating procedures with the operating personnel. Provide a written report of completed work, operating log, and indicate any deficiencies detected. MID-SEASON RUNNING INSPECTION CTV-230 Check the general operation of the unit. Log the operating temperatures, pressures, voltages, and amperages. Check the operation of the purge unit. Check the operation of the control circuit. Check the operation of the lubrication system. Check the operation of the motor and starter. Analyze the recorded data. Compare the data to the original design conditions. Review operating procedures with operating personnel. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. SEASONAL SHUT-DOWN PROCEDURE CTV-250 Check the general operation of the unit. Shut down the chiller, pumps, and auxiliary equipment. Drain the condenser and chilled water piping as required. Turn off equipment power as necessary. Review operating procedures with operating personnel. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. Air-Cooled Rotary Chillers ACR-1 Review operation logs with COTR for any problems and trends. Check and record refrigerant level, provide leak rate calculation report if levels are low. Inspect for leaks, conduct leak check using EPA-recommended methods, and report leak results. Calculate refrigerant loss. Repair all minor leaks as required such as valve packing, flare nuts, etc. Visually inspect condenser coil for cleanliness. Check the condenser fans for clearances and free operation. Check tightness of condenser fan motor mounting brackets. Check the set screws on the fan shafts. Verify the performance of the fan control inverter VFD. Grease fan bearings as required. Annually, clean the condenser coil. Verify all settings in the electronic control panel. Inspect the control panel for cleanliness. Inspect controls and safety wiring and connections for tightness and signs of overheating and discoloration. Verify the working condition of all indicator/alarm lights and LED/LCD displays. Replace lights as required. Test the oil pressure safety device. Calibrate and record setting. Test high motor temperature safety device. Calibrate and record setting. Test operation of chilled water pump and condenser water pump starter auxiliary contacts. Pull one oil sample per year for spectroscopic analysis. Annually, check oil for acid content and discoloration. Change oil if out of normal parameters. Verify the operation of the oil heaters. Measure amps and compare readings with the wattage rating of the heaters. Clean the starter cabinet and starter components. Start the unit if not already in operation. Inspect motor and starter wiring and connections for tightness and signs of overheating and discoloration. Check condition of contacts for wear and pitting. Check contactors for free and smooth operation. Check the mechanical linkages for wear, security, and clearances. Check tightness of the motor terminal connections. Annually, meg the motor and record reading. Verify the operation of the electrical interlocks. Measure and record voltages. Provide function test loss of normal operation and automatic emergency start up Once per year, pull a refrigerant sample for spectrographic analysis for contaminants. a. Additionally Performed During Mid-Season PM w/Equipment Running (Schedule during July) Check the general operation of the unit. Log the operating temperatures, pressures, voltages, and amperages. Check the operation of the control circuit. Check the operation of the lubrication system. Check the operation of the motor and starter. Analyze the recorded data and compare to the original design conditions for the equipment. Review operating procedures with COTR and VA staff. CENTRAL STATION AIR HANDLING UNITS COMPREHENSIVE ANNUAL INSPECTION AHU-110 Report in with the COTR. Record and report abnormal conditions, measurements taken, etc. Review customer logs with the customer for operational problems and trends. General Assembly Inspect the unit for cleanliness. Inspect the fan wheel and shaft for wear and clearance. Check the sheaves and pulleys for wear and alignment. Check the belts for tension, wear, cracks, and glazing. Verify tight bolts, set screws, and locking collars. Check dampers for wear, security and linkage adjustment. Verify clean condensate pan. Verify proper operation of the condensate drain. Verify clean air filters. Verify clean coils. Verify proper operation of the spray pump, if applicable. Verify smooth fan operation. Log operating conditions after system has stabilized. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. Lubrication Lubricate the fan shaft bearings, if applicable. Lubricate the motor bearings, if applicable. Controls and Safeties Test the operation of the low temperature safety device, if applicable. Test the operation of the high static pressure safety device, if applicable. Test the operation of the low static pressure safety device, if applicable. Check the thermal cutout on electric heaters, if applicable. Check the step controller, if applicable. Check and record supply air and control air pressure, if applicable. Verify the operation of the control system and dampers while the fan is operating. Motor and Starter Clean the starter and cabinet. Inspect the wiring and connections for tightness and signs of overheating and discoloration. This includes wiring to the electric heat, if applicable. Check the condition of the contacts for wear and pitting. Check the contactors for free and smooth operation. Meg the motor and record readings. SCHEDULED RUNNING INSPECTION AHU-130 Check the general condition of the fan. Verify smooth fan operation. Check and record supply and control air pressure, if applicable. Function test loss of normal operation and emergency start up Verify the operation of the control system. Log the operating conditions after the system has stabilized. Review operating procedures with operating personnel. Provide a written report of completed work, operating log, and indicate uncorrected deficiencies detected. VANE AXIAL FANS TRANE COMPREHENSIVE ANNUAL INSPECTION EXHAUST FANS FAN-130 Report in with the COTR Record and report abnormal conditions, measurements taken, etc. Review customer logs with the COTR for operational problems and trends. General Assembly Inspect fan wheel for wear, security, and clearance. Inspect sheaves and pulleys for wear and alignment. Inspect belts for tension, wear, cracks, and glazing. Verify tight bolts, set screws, and locking collars. Verify smooth operation of the fan. Log operating conditions after the system has stabilized. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. Lubrication Lubricate the fan bearings. Lubricate the motor bearings, if applicable. Motor and Starter Clean the starter and cabinet. Inspect the wiring and connections for tightness and signs of overheating and discoloration. Check the condition of the contacts for wear and pitting. Check the contactor for free and smooth operation. Meg the motor and record the readings. Check and record volts and amps of the motor. PURGE SYSTEMS PURIFIER PURGE PRG-130 Clean the condenser on the purge refrigeration unit. Check purge unit controls for proper operation. Check and clean purge drum. Clean strainers or replace filters. Check purge compressor assembly for leaks. Check the purge unit for proper operation. LEAK CHECK (HIGH PRESSURE) WATER COOLED High Pressure Leak Check LCK-11O Inspect for leaks and report results. Repair minor leaks as required (e.g. valve packing, flare nuts). Calculate refrigerant loss rate and report to the customer. CONDENSER CLEANING WATER-COOLED CONDENSERS BRUSH TUBES (600 Tubes/Day) CDS-210cds Pull both heads. Eddy Current test every 2 years. Brush tubes as necessary. NOTE: The term easy end head refers to the head which has no piping attached to it. In the case of 1-pass or 3-pass vessels, there will be no easy end head, and extra time must be allotted to the job for the removal of the piping. An exception to this would be the unit s having marine boxes. LUBRICATION SYSTEMS CHANGE OIL AND FILTER OIL-130 Change the oil and filter, using factory-recommended oil and filter. REFRIGERANT MONITORS ANNUAL MAINTENANCE INSPECTION MSC-320 Report in with the COTR. Record and report abnormal conditions. Check chassis mounting in enclosure. Check operation of Clear Language Display. Replace sampling filter element /elements at sensing points. Provide Zero and Span calibration to accuracy within 1 PPM. Visually check photo-acoustic sensing device. Check periodic re-zeroing. COOLING TOWERS, GEAR DRIVE COMPREHENSIVE ANNUAL INSPECTION CLT-210 Report in with the COTR. Record and report abnormal conditions, measurements taken, etc. Review customer logs with the customer for operational problems and trends. General Assembly STRUCTURE Disassemble all screens and access panels for inspection. Inspect the conditions of the slats, if applicable. Inspect the condition of the tower fill. Inspect the condition of the support structure. Inspect the condition of the basins (upper and lower) and/or spray nozzles. Verify clean basins and strainer(s). Verify the condition and operation of the basin fill valve system. MECHANICAL Inspect gear box for leaks. Inspect drive and coupling for condition and security Inspect fan assembly for condition, security, and clearances (e.g. blade tip clearance). Lubrication Lubricate motor bearings. Check gear box oil level. Motor and Starter Clean the starter and cabinet. Inspect wiring and connections for tightness and signs of overheating and discoloration. Check condition of the contacts for wear and pitting. Check contactor(s) for free and smooth operation. Meg the motor and record reading. Check disconnect terminal block for wear, tightness and signs of overheating and discoloration. Check the condition and operation of the basin heater contactor(s). STARTUP / CHECKOUT PROCEDURE CLT-220 Fill the basin and verify float level. Verify the operation of the basin heaters. Verify the operation, set point, and sensitivity of the basin heater temperature control device. Start the condenser water pumps. Verify the balance of the return water through the distribution boxes. Verify proper operation of the bypass valve(s), if applicable. Operate the fan(s) and verify smooth operation. Log operation after the system has stabilized. Review operating procedures with COTR. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. MID-SEASON RUNNING INSPECTION CLT-230 Check the general condition of the tower. Verify clean basins and strainers (upper and lower) and/or spray nozzles. Verify proper water level in the basin. Verify proper operation of the water level control device. Verify smooth operation of the fan(s). Verify proper operation of the bypass valve(s). DIRECT DRIVE PUMPS ANNUAL INSPECTION PMP-110 Report in with the COTR Record and report abnormal conditions, measurements taken, etc. Review customer logs with the customer for operational problems and trends. General Assembly Check motor shaft and pump shaft for alignment. Inspect the coupling for wear. Verify that the shaft guard is in place and tight. Verify water flow through the pump. Check for leaks on the mechanical pump seals. Verify proper drip rate on the pump seal packing. Verify smooth operation of the pump. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. Lubrication Lubricate the motor bearings as necessary. Lubricate the pump bearings as necessary. Motor and Starter Clean the starter and cabinet. Inspect wiring and connections for tightness and signs of overheating and discoloration. Meg the motor and record results. Verify tight connections on the motor terminals. Check the condition of the contacts for wear and pitting. Check the contactors for free and smooth operation. Verify proper volts and amps. PUMP RUN INSPECTION PMP-111 Verify smooth operation of the pump. Check for leaks on the mechanical pump seals. Verify proper drip rate on the pump seal packing. Provide a written report of completed work, operating log, and indicate any uncorrected deficiencies detected. VARIABLE FREQUENCY DRIVES MAINTENANCE PROCEDURE MSC-130 Report in with the COTR. Record and report abnormal conditions, measurements taken, etc. Review customer logs with the customer for operational problems and trends. Clean the heat sink. Inspect wiring and connections for tightness and signs of overheating and discoloration. Visually inspect panel for loose or damaged parts or wiring; also check for any accumulation of dirt and/or moisture. Verify proper operation of the unit. Verify proper DC buss voltage. Each inspection will be provided in accordance with the system/equipment manufacturers factory recommended procedures. Each inspection shall, at a minimum, include the following as specified for the equipment make, type, and time of seasonal operation. Any additional parts not identified in this document will not be covered by this contract. The vendor will obtain prior approval from the COTR prior to performing any additional repair work and the additional work will be billed separately. For each PM inspection, the contractor will provide a detailed written report to the COTR that summarizes work performed, problems/deficiencies found, and measurements taken. This report will be submitted within 10 calendar days of the date of PM inspection. All work will be performed between the hours of 7:30 a.m. and 4:00 p.m. on the prearranged dates. All inspection work must be coordinated through the COTR who is: EMERGENCY SERVICE Emergency repair service is not covered by the contract. However, the contractor will provide a preferred customer response to emergency repair calls that includes labor and parts costs to be billed separately. CONTRACTOR PERSONNEL Personnel Experience. All work shall be performed by competent mechanics, experienced and qualified to work on the specific makes and models of equipment listed in this contract. The Contractor shall submit to and for the approval of the Contracting Officer, certification and a list of credentials of the approved mechanics. Personnel shall have a minimum of three (3) years recent experience related to this work. The contractor must provide a list of three (3) reference contacts that have been provided service on similar or identical equipment. The contractor must provide authenticated factory training certificates or credentials (or acceptable substitute as approved by the COTR) for any personnel who are working on any VA equipment. The VA specifically reserves the right to reject any of the contractor s personnel and refuse them permission to work on VA equipment. Conduct of Personnel. The Contractor shall ensure that his personnel present a professional appearance at all times and that their conduct shall not reflect discredit upon this facility or the Department of Veterans Affairs. The Contractor shall remove from the job site any employee for reasons of misconduct or security. The removal from the job site of such a person shall not relieve the Contractor of the requirement to provide sufficient personnel to perform adequate and timely service. All employees shall be legal residents of the United States and be able to understand, speak, read and write the English language. Identification of Employees. : The Contractor shall within 10 calendar days before beginning performance of work provide the Contracting Officer a list of all employees who will perform under this contract. The list shall include the full name, and work assignment of each employee. The Contractor shall notify the Contracting Officer in writing of any addition, deletion or change in work assignment within 10 days of such change. Each of the Contractor's employees shall conspicuously display on their person a badge provided by the VA West Roxbury Police Office. HOURS OF OPERATION Normal Duty Hours. The Contractor shall have employees available Monday through Friday, except legal public holidays at the times specified to perform routine work and inspections. Federal Holidays. Federal Holidays observed by the VA are: New Years Day; Martin Luther King Day; President s Day; Memorial Day; Independence Day; Labor Day; Columbus Day; Veterans Day; Thanksgiving Day; and Christmas. CONTRACTOR QUALITY CONTROL The Contractor shall establish and maintain a Quality Control Program that ensures that all requirements of the contract are provided as specified. INSPECTION AND ACCEPTANCE Final inspection and acceptance by the Government shall be made at the site of each system. However, final inspection and acceptance do not preclude the Government's right to inspect completed work prior to shipment from the Contractor's shop nor does it waive any rights of the Government. Unsatisfactory service will be reported in writing by the VA CO to the Contractor. Telephone Answering Service: The Contractor shall maintain, at his own expense, a dedicated (tie-line) toll-free telephone answering service for the exclusive use in the performance of this contract. This answering service shall be monitored during normal work hours as identified in the specifications. REMOVAL AND/OR DISPOSAL Removing Government-Owned Material: All property removed remains the property of the U.S. Government and shall be returned by the Contractor to a place of storage as designated by the CO or COTR. Salvage: Items received by the Contractor that are non-repairable because of condition, or declared unfit for economical rehabilitation by the Contractor, shall be returned to the Government. All salvage remaining in the Contractor's shop shall remain Government property and may be used for repair of any Government-owned equipment when released by the CO. The Contractor shall be required to maintain an account record of inventory upon completion of the maintenance contract. Inventories shall not be disposed of by the Contractor without inspection and written approval of the CO. Salvaged parts used in the repair of any government owned equipment shall be treated by the Contractor as Government furnished material and reflected as same on Contractor's invoices when submitted for payment. All salvage in the possession of the Contractor, upon expiration of the contract, will be returned to the Government within thirty (30) days after such expiration. FIRE PREVENTION AND PROTECTION The Contractor shall fully acquaint himself and his personnel with the location of fire equipment before work, take all prudent measures to minimize fire hazards that result from work, complies with all ordering agency fire and safety regulations. ENERGY CONSERVATION The Contractor is required to comply with all energy conservation regulations and instructions that are applicable to Government-owned facilities including but not limited to thermostat settings. CLEANING UP The Contractor shall clean up after work, leaving each area where work is performed, neat and clean. All containers, trash and debris for which he is responsible shall be removed. HAZARDOUS CONDITIONS During the course of performing work under this contract, should the Contractor find serious or hazardous conditions existing with or in any of the equipment the Contractor shall secure the equipment and immediately notify the COTR. CLEANLINESS The area immediately around the equipment provided for the Contractor s use shall be kept in a clean and orderly condition. Trash and waste material shall not be permitted to accumulate, but shall be removed by the Contractor s employees. SERVICE MANUALS The VA shall not provide service manuals or service diagnostic software to the contractor. The contractor shall obtain, have on file, and make available to its FSEs all operational and technical documentation, (such as: operational and service manuals, schematics, and parts lists), which are necessary to meet the performance requirements of this contract. The location and listing of the service data manuals, by name, and/or the manuals themselves shall be provided to the CO upon request. INSURANCE Worker compensation and employer s liability. Contractor and any subcontractor covered under this contract are required to comply with applicable Federal and State Worker s Compensation and occupational disease statutes. General Liability. Contractor and any subcontractor covered under this contract are required to have Bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence. Property Damage Liability. Contractor and any subcontractor covered under this contract are to have Property Damage Liability insurance coverage of at least $500,000. Contractor shall provide proof of liability insurance within five (5) days after contract award. SMOKING POLICY Smoking is prohibited inside all buildings except in designated areas. BILLING AND PAYMENT Each invoice shall contain the documentation required by this contract. The invoices shall be itemized to contain the equipment s identifier. When parts are furnished by the Government, they shall be itemized on Contractor's invoice at no-cost and indicated as Government-furnished parts. Payment. Payment will be made 30 days in arrears upon receipt of properly prepared invoice. Invoice must contain the contract number and the purchase order number. PRICING SUBMITTAL The annual pricing of the contract should be itemized by the bidders to reflect a cost per unit PM per equipment item covered by contract. VENDOR REQUIREMENTS The contractor must employ mechanics and technicians that are trained in the applicable codes, standards, and manufacturer requirements for maintenance and repair of the Trane and McQuay equipment covered by this contract. The contractor must have at least 5 years experience satisfactorily performing such maintenance on comparable units, equipment, or systems. The contractor must have access to OEM (original equipment manufacturer)- manufactured parts and materials required for performance of this work. The contractor must have sufficient supplies, tools, and equipment to perform all requirements of this contract. EQUIPMENT COVERED BY THIS CONTRACT BUILDING # 1 VA ID# MANUFACTURER ITEM NAME MODEL # SERIAL# SCHEDULE LOCATION Trane (MICU) Back-Up Air-Cooled Chiller CGAM070F2Y03AXD2A1 U22A00424 ACR-1 WR-B1- 4B128 Trane (CCU) Air-Cooled Chiller CGAM070F2Y03AXD2A1 U22A00422 ACR-1 WR-B1- A4-01 BUILDING # 2 Trane Centrifugal Chiller CVHF0910 L03M08522 CTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130 WR-B2-AB- 13 Trane Centrifugal Chiller CVHF0910 L03M08531 CTV-210B, CTV-230, CTV-250, CTV-220, CDS-210, PRG-130, OIL-130 WR-B2-AB- 13 Marley Cooling Tower-1 NC-8309 GZBS NC-241518-A2 CLT-210, CLT-230, CLT-220 WR-B2-A4-01 Marley Cooling Tower-2 NC-9309 GZBS NC-241518-A1 CLT-210, CLT-230, CLT-220 WR-B2-A4-01 Trane (OR- Back-Up) Air-Cooled Chiller RTAA0804YR01A301GBFC U06B06111 ACR-1 WR-B2-A4-01 Trane (GI) Air-Cooled Chiller CGAFC304AK01A00000 C06A00249 ACR-1 WR-B2-A4-01 Trane (S5C) Air-Cooled Chiller RTAC1404 U10F07753 ACR-1 WR-B2-A4-01 Trane (Artic Chiller) Chiller Modular -1 PACVMV0400D4-MM-VS1 A10001137 Running Inspection WR-B2-PH Trane (Artic Chiller) Chiller Modular -2 PACVMV0400D4-MM-VS1 A101011417 Running Inspection WR-B2-PH Trane (Artic Tower) Tower Modular-2 TP00004075 A101011517 Tower Cleaning & Running Inspection WR-B2-PH Trane SPS Condenser RAUJ804A132BDF01D C10J04548 ACR-1 WR-B2-POOL ROOF Trane S5C AHU MCCB05ONBFOSDAA K08B22619 AHU-110, AHU-130 WR-B2-A4-01 Trane (OR-S5) AHU MCCB05OUA0AOUB K09D83236A AHU-110, AHU-130 WR-B2-A4-01 Trane AHU-1A CSAA012UBL00 K17C26642 AHU-110, AHU-130 WR-B2-ROOF Trane AHU-1B CSAA0100 K17C26621 AHU-110, AHU-130 WR-B2-ROOF Carrier (S8-Elv Mch Rm) Air Cooled Chiller 38ARZ008-601CA 3806G50045 ACR-1 WR-B2-ROOF Trane (CTIR) Air Cooled Chiller TTA09044DAA02BS010001 23193610YA ACR-1 WR-B2-ROOF Trane (CTIR) Dry Cooler TR-SCS-120-SSA 10331148 ACR-1 WR-B2-ROOF Barry Blower Exhaust Fan EM2515T-G 76-2902 FAN-130 WR-B2-PH Cook MFG Exhaust Fan 195CPS N/A FAN-130 WR-B2-AB- 13 Vaneaxial Fan Exhaust Fan E-5 N/A N/A FAN-130 WR-B2-A4-01-PH Vaneaxial Fan Exhaust Fan GE-1 N/A N/A FAN-130 WR-B2-A4-01-PH Baldor Reliance 2-SCHW-Pump-1 EM3313T-G 37J839L868G1 PMP-110, PMP-111 WR-B2-AB- 13 Bell & Gossett 2-SCHW-Pump-1 Frame E-1510 C331015-01A22 PMP-110, PMP-111 WR-B2-AB- 13 Baldor Reliance 2-SCHW-Pump-2 EM3313T-G 37J839L868G1 PMP-110, PMP-111 WR-B2-AB- 13 Bell & Gossett 2-SCHW-Pump-2 Frame E-1510 C331015-01G22 PMP-110, PMP-111 WR-B2-AB- 13 Baldor Reliance 2-SCHW-Pump-3 EM3313T-G 37J839L868G1 PMP-110, PMP-111 WR-B2-AB- 13 Bell & Gossett 2-SCHW-Pump-3 Frame E-1510 C331015-01C22 PMP-110, PMP-111 WR-B2-AB- 13 Baldor Reliance 2-SCHW-Pump-4 EM3311T-G 37J839L863G1 PMP-110, PMP-111 WR-B2-AB- 13 Bell & Gossett 2-SCHW-Pump-4 Frame E-1510 C331016-01B22 PMP-110, PMP-111 WR-B2-AB- 13 Trane TR200 2-SCHWP-1 VDF 174Z4893 988204Y252 MSC-130 WR-B2-AB- 13 Trane TR200 2-SCHWP-2 VDF 174Z4893 525204Y182 MSC-130 WR-B2-AB- 13 Trane TR200 2-SCHWP-3 VDF 174Z4893 525204Y182 MSC-130 WR-B2-AB- 13 Trane TR200 2-SCHWP-4 VDF 174Z4893 771804Y222 MSC-130 WR-B2-AB- 13 Baldor Reliance 2-PCHW-Pump-1 EM2539T-G 40E245X166G1 PMP-110, PMP-111 WR-B2-AB- 13 Bell & Gossett 2-PCHW-Pump-1 Frame VSC C331009-01D22 PMP-110, PMP-111 WR-B2-AB- 13 Baldor Reliance 2-PCHW-Pump-2 EM2539T-G 40E245X166G1 PMP-110, PMP-111 WR-B2-AB- 13 Bell & Gossett 2-PCHW-Pump-2 Frame VSC C331009-03C22 PMP-110, PMP-111 WR-B2-AB- 13 Baldor Reliance 2-PCHW-Pump-3 EM2539T-G 40E245X166G1 PMP-110, PMP-111 WR-B2-AB- 13 Bell & Gossett 2-PCHW-Pump-3 Frame VSC C331009-01D22 PMP-110, PMP-111 WR-B2-AB- 13 Trane TR200 2-PCHWP-1 VDF 174Z4898 986904Y252 MSC-130 WR-B2-AB- 13 Trane TR200 2-PCHWP-2 VDF 174Z4898 986804Y252 MSC-130 WR-B2-AB- 13 Trane TR200 2-PCHWP-3 VDF 174Z4898 986604Y252 MSC-130 WR-B2-AB- 13 Baldor Reliance 2-CW-Pump-1 EM2555T-4G 44E227W390G1 PMP-110, PMP-111 WR-B2-AB- 13 Bell & Gossett 2-CW-Pump-1 Frame VSC C331008-02D22 PMP-110, PMP-111 WR-B2-AB- 13 Baldor Reliance 2-CW-Pump-2 EM2555T-4G 44E227W390G1 PMP-110, PMP-111 WR-B2-AB- 13 Bell & Gossett 2-CW-Pump-2 Frame VSC C331008-01D22 PMP-110, PMP-111 WR-B2-AB- 13 Baldor Reliance 2-CW-Pump-3 EM2555T-4G 44E227W390G1 PMP-110, PMP-111 WR-B2-AB- 13 Bell & Gossett 2-CW-Pump-3 Frame VSC C331008-03D22 PMP-110, PMP-111 WR-B2-AB- 13 Trane TR200 2-CWP-1 VDF 174Z4902 271004Y292 MSC-130 WR-B2-AB- 13 Trane TR200 2-CWP-2 VDF 174Z4902 270804Y292 MSC-130 WR-B2-AB- 13 Trane TR200 2-CWP-3 VDF 174Z4902 270904Y292 MSC-130 WR-B2-AB- 13 Strainer CW Strainer-1 10" ASTM A126 GR.B N/A Clean Strainer WR-B2-AB- 13 Strainer CW Strainer-2 10" ASTM A126 GR.B N/A Clean Strainer WR-B2-AB- 13 Strainer CW Strainer-3 10" ASTM A126 GR.B N/A Clean Strainer WR-B2-AB- 13 BUILDING # 3 Trane Centrifugal Chiller CVHE0450 L09A05825 CTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130 WR-B3-3C101 Trane Centrifugal Chiller CVHE0450 L09A05826 CTV-512, CTV-520, CTV-530, CTV-550, CDS-210, OIL-130, PRG-130 WR-B3-3C101 Trane (B3-Cross Connect )Air-Cooled Chiller RTAC U22A00455 ACR-1 WR-B3-ROOF Evapco Cooling Tower LST-10-183T 879038 CLT-210, CLT-220, CLT-230 WR-B3- ROOF Evapco Cooling Tower LST-10-183T 879039 CLT-210, CLT-220, CLT-230 WR-B3- ROOF ABB Cooling Tower-1 VFD ACH550-UH-045A-4 2090602672 MSC-130 WR-B3-3C101 ABB Cooling Tower-2 VFD ACH550-UH-045A-4 2090602674 MSC-130 WR-B3-3C101 Baldor Reliance 3-PCHW-Pump-1 EM2531T 40G048W943 PMP-110, PMP-111 WR-B3-3C101 Baldor Reliance 3-PCHW-Pump-2 EM2531T 40G048W943 PMP-110, PMP-111 WR-B3-3C101 Baldor Reliance 3-PCHW-Pump-3 EM2531T 40G048W943 PMP-110, PMP-111 WR-B3-3C101 ABB 3-PCHW-Pump-1 VFD ACH550-UH-038A-4 2090602676 MSC-130 WR-B3-3C101 ABB 3-PCHW-Pump-2 VFD ACH550-UH-038A-4 2090602673 MSC-130 WR-B3-3C101 ABB 3-PCHW-Pump-3 VFD ACH550-UH-038A-4 2090602675 MSC-130 WR-B3-3C101 Strainer Bldg-3-CW Strainer-1 10" Keckley Style A 125lbs N/A Clean Strainer WR-B3-3C101 Strainer Bldg-3-CW Strainer-2 10" Keckley Style A 125lbs N/A Clean Strainer WR-B3-3C101 Strainer Bldg-3-CW Strainer-3 10" Keckley Style A 125lbs N/A Clean Strainer WR-B3-3C101 Baldor Reliance 3-PCW-Pump-1 EM2528T 40G048X120 PMP-110, PMP-111 WR-B3-3C101 Baldor Reliance 3-PCW-Pump-2 EM2528T 40G048X120 PMP-110, PMP-111 WR-B3-3C101 Baldor Reliance 3-PCW-Pump-3 EM2528T 40G048X120 PMP-110, PMP-111 WR-B3-3C101 ABB 3-PCW-Pump-1 VFD ACH550-UH-031A-4 2090602687 MSC-130 WR-B3-3C101 ABB 3-PCW-Pump-2 VFD ACH550-UH-031A-4 2090602685 MSC-130 WR-B3-3C101 ABB 3-PCW-Pump-3 VFD ACH550-UH-031A-4 2090602688 MSC-130 WR-B3-3C101 BUILDING # 20 & 21 Trane Arctic Chiller Mod 1 TPWCCMV0300D4-MM A022047224 Running Inspection WR-B20 Trane Arctic Chiller Mod 2 TPWCCMV0300D4-MM A022047124 Running Inspection WR-B20 Trane Arctic Chiller Mod 3 TPWCCMV0300D4-MM A022047024 Running Inspection WR-B20 Trane Condenser Unit RAUJC604BA03AOD C10B00682 ACR-1 WR-B21 Trane Condenser Unit RAUJC604BA03AOD C10B00681 ACR-1 WR-B21 Evapco Cooling Tower-1 USS14-86 16-780293 CLT-210, CLT-220, CLT-230 WR-B21 Evapco Cooling Tower-2 USS14-86 16-780292 CLT-210, CLT-220, CLT-230 WR-B21 WEG 21-CW-Pump-1 01018OT3E215T-S 103116362 PMP-110, PMP-111 WR-B21 WEG 21-CW-Pump-2 0118OT3E215T-S 103116359 PMP-110, PMP-111 WR-B21 WEG 21-CHW-Pump-1 020180T3E256T-S 1030953958 PMP-110, PMP-111 WR-B21 WEG 21-CHW-Pump-2 021080T3E256T-S 1030953957 PMP-110, PMP-111 WR-B21 ABB 21-CW-Pump-1 VFD ACH550-PCR-015A 216900159 MSC-130 WR-B21 ABB 21-CW-Pump-2 VFD ACH550-PCR-015A 216900142 MSC-130 WR-B21 ABB 21-CHW-Pump-1 VFD ACH550-PCR-031A 216900168 MSC-130 WR-B21 ABB 21-CHW-Pump-2 VFD ACH550-PCR-031A 216900182 MSC-130 WR-B21 Strainer CW Strainer-1 N/A N/A Clean Strainer WR-B21 Strainer CW Strainer-2 N/A N/A Clean Strainer WR-B21 The NAICS code for this requirement is 238220. Engineering identifies Trane U.S. Inc. as the required single source for the complete manufacturer-supported Trane chiller maintenance program. The statement of work specifically calls for KestrelView analysis using a Trane laptop and software and for equipment-specific controls, protective-device, refrigerant, and mechanical service procedures that depend on Trane equipment documentation, specialized diagnostic resources, and qualified manufacturer support. These requirements go beyond generic HVAC maintenance and are central to assessing the condition and reliable operation of the installed Trane chillers. The VA-owned Trane-controlled equipment and Trane Ensemble platform require Trane-specific software, programming capability, and replacement supplies and identified Trane as the contractor then able to deliver the specified integrated service. Those historical findings are being incorporated as the technical basis for continuity of the current installed-equipment requirement. Equipment lists have changed because of campus upgrades; this does not alter the need for the specified OEM diagnostic methods and chiller-specific maintenance capability. The Government has intentionally retained Trane equipment as a principal element of its West Roxbury cooling infrastructure. Standardization and operational continuity are relevant to maintenance reliability, availability of consistent OEM service procedures, and safe seasonal transition of the chilled-water plants. Engineering requires the Trane-specific diagnostic portion to be integrated with the ongoing scheduled service program to ensure that findings, repairs recommendations, and unit availability are evaluated as one coordinated plant-maintenance effort. The associated pumps, drives, cooling towers, and connected components are necessary for the cooling plant to function. The technical basis for a Trane-only order is the complete integrated service requirement with manufacturer-specific chiller diagnostics and supported service access. Trane is the only provider identified in the supplied acquisition history as delivering the Trane-specific diagnostic and coordinated plant-maintenance requirement. This notice of intent is not a solicitation nor is it a request for proposal. However, interested parties that believe they can satisfy the requirement must clearly identify their capability to do so in writing by Monday, November 25, 2026 at 12 pm EST time. Response should be sent to Issa Shawki at issa.shawki@va.gov. Information submitted in response to this notice will be used solely to determine whether competitive procedures could be used for this acquisition. A determination not to open this requirement to competition based upon responses to this notice is solely within the discretion of the Government.

Overview

Response Deadline
Due in 5 Days
Posted Date
Set Aside
None
Place of Performance
Not Provided
Source

Pricing Structure
Likely Fixed Price
Current SBA Size Standard
$19 Million
Signs of Shaping
79% of similar contracts within the Veterans Health Administration had a set-aside.
On 11/19/26 VISN 1: New England Healthcare System issued Special Notice 36C24127Q0080 for Chiller System Maintenance due 11/25/26.
Primary Contact
Title
Contracting Officer
Name
Issa Shawki   Profile
Phone
(774) 826-3192

Documents

Posted documents for Special Notice 36C24127Q0080

Opportunity Assistant


Analyze Opportunity

Generate a Draft

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Special Notice 36C24127Q0080

Similar Active Opportunities

Open contract opportunities similar to Special Notice 36C24127Q0080

Experts for Chiller System Maintenance

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
VETERANS AFFAIRS, DEPARTMENT OF > VETERANS AFFAIRS, DEPARTMENT OF > 241-NETWORK CONTRACT OFFICE 01 (36C241)
FPDS Organization Code
3600-00241
Source Organization Code
100176746
Last Updated
Last Updated By
Issa.Shawki@va.gov
Archive Date
Original Title
J041--Chiller System Maintenance