Search Contract Opportunities

ISO 450001 Certification and Maintenance

ID: W519TC-26-SS-035449 • Type: Sources Sought • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Analyze Opportunity
Generate a Draft
Loading

Description

Background
The contract is issued by the Rock Island Arsenal-Joint Manufacturing and Technology Center (RIA-JMTC) with the goal of certifying, obtaining, and maintaining ISO 45001 certification for occupational health and safety. This effort aims to ensure compliance with international standards and enhance workplace safety within the organization.

Work Details
The contractor shall provide all necessary services to assist RIA-JMTC in certifying to, obtaining, and maintaining ISO certifications. The contractor must be accredited to ISO 17021 and ANAB, specifically for ISO 45001:2018, without any previous suspensions or revocations of their accreditation. The contractor must have evidence of successful completion of two ISO audits on DoD facilities with over 1000 personnel. Audits will be scheduled annually in one calendar week to avoid lapses in certification.

The contractor is responsible for conducting pre-assessment and formal registration audits, providing registration audits, surveillance/maintenance audits, and ensuring that all deliverables are met as outlined in the Performance Work Statement (PWS). Deliverables include an audit plan, electronic audit reports, communication of audit results, and any other requirements per IAF and ANAB standards. The contractor cannot subcontract the certification process.

Period of Performance
The period of performance for this contract is five years, consisting of one base year and three one-year option periods.

Place of Performance
Rock Island Arsenal, Illinois.

Bidder Requirements
Bidders must be accredited to ISO 17021 and ANAB with a scope that includes ISO 45001:2018. They must provide objective evidence of having completed two relevant ISO audits at DoD facilities with over 1000 personnel. All contractor personnel must be U.S. citizens or naturalized citizens; foreign nationals are not permitted as auditors due to security requirements.

Contractors must also comply with various security training requirements including AT Level I training within 60 days of contract start.

This is a Sources Sought only.

You MUST send an e-mail to the POC (heather.j.petersen.civ@army.mil) that includes the following:

1) Company Name

2) Cage Code or EUI number

3) Company POC, e-mail address, and phone number

4) Capability statement that outlines you have and can complete the work outlined below.

_______________

Scope of Work (SOW):

  1. Scope of Work

B.1 The contractor shall provide all necessary services and support to assist RIA-JMTC in certifying to, obtaining and maintaining the most current revision of each International Standard Organization (ISO) certification that RIA-JMTC deems necessary.

B.2 This performance work statement (PWS) describes the general requirements and deliverables required for this effort through the end of the contract. Each ISO certification required by RIA-JMTC will be included as an appendix to this PWS and will describe the specific requirements and deliverables for that ISO certification. Unless specifically stated, the general requirements and deliverables of this PWS will apply to each ISO certification. The Government will add a new appendix to this PWS for new RIA-JMTC ISO requirements. All revisions/changes to the PWS will be coordinated with the Contractor.

  1. GENERAL REQUIREMENTS

C.1.1 The Offeror shall be accredited to ISO 17021 and the ANAB with a scope of accreditation that includes but is not limited to, ISO 45001:2018. The Offeror cannot have any previous suspensions or revocations of their accreditation. The contractor shall have objective evidence that they've performed successful completion of two ISO audits specific to RIA-JMTC's requirements on DoD facilities of greater than 1000 personnel.

C.1.2 RIA-JMTC shall be scheduled for audits to ensure no lapses of any certificates. It is the intention of RIA-JMTC to schedule all audits in one calendar week each year. Deviations from the intended scheduling may be necessary to achieve initial registration and may occur at the discretion of RIA-JMTC. Section C1.2-ISO 17021 requires a surveillance audit once per calendar year. No lapse in certification will occur if audits are conducted once per calendar year. A recertification audit occurs 60 days prior to expiration of a certificate.

C.1.3 The contractor and/or sub-contractor shall abide by all applicable requirements of ISO for the duration of this contract.

C.1.4 The Certification Body shall conduct all pre-assessment and formal registration audits including review of documentation. Reviewing RIA-JMTC's documentation shall be performed at least two weeks in advance of any formal audit.

C.1.5 The Certification Body shall provide registration audits and/or Surveillance/Maintenance Audits to be conducted, to maintain the requested ISO certification through the end of the contract.

C.1.6 The specific schedule for each of these audits shall be agreed upon between RIA-JMTC's Management Representative and the Certification Body. The audit duration is governed by IAF. The Government may require additional audit days to allow for a more extensive audit than what the IAF recommends.

C.1.7 The scope of the certification is not segmented but rather is inclusive of the entire facility except for RIA-JMTC's exclusions mentioned previously. Therefore, audits shall be performed facility wide, simultaneously over one calendar week, or in the scheduled timeframe, to avoid unnecessary disruption of the organization.

C.1.8 Sub-contracting. Contractor shall not sub-contract the certification process to a third party. Contractor must be able to perform all aspects of the certification process upon award of the contract.

C.2 DELIVERABLES. The ultimate deliverable under this contract is formal ISO certification/maintenance during the period of the contract. In addition, the Certification Body shall provide the following:

C.2.1 Information regarding the certification process, including processing complaints and appeals and any associated fees. This should be provided prior to each audit.

C.2.2 The name of, and when requested, background information on each member of an audit team. Such information should be provided sufficiently in advance of the audit to allow reconstitution of the audit team in the event RIA-JMTC objects to any audit team member.

C.2.3 Provide an audit plan, at least 30 days in advance of each audit to allow an agreement between RIA-JMTC and the Certification Body's lead auditor on dates, times, and areas to be audited. This notice shall include a single point of contact with which RIA-JMTC will communicate.

C.2.4 After any audit is complete, the Certification Body is required to provide an electronic audit report.

C.2.5 Upon an initial or re-registration audit, the Certification Body must notify RIA-JMTC of the decision to certify or not certify. If the decision is to certify, the Certification Body is required to provide a certification document to RIA-JMTC.

C.2.6 The Certification Body is required to communicate audit results during and after an audit and to respond to RIA-JMTC's response to any nonconformance. The results of the Certification Body's review of such response to nonconformities shall be reported to RIA-JMTC.

C.2.7 Transfers of certificates for RIA-JMTC;

Note: Transfer of certificates means that RIA-JMTC maintains certification by an Accreditation Body which is a member of the IAF (International Accreditation Forum) and those responsibilities are being assumed by another Accreditation Body which is a member of the IAF (International Accreditation Forum). New certificate reflects new Certification Body.

C.2.8 Audit support for the certification or maintenance of certifications of RIA-JMTC. All information that could potentially affect certification to ISO shall be communicated to the RIA-JMTC representative immediately when found.

C.2.9 Any other deliverables required by the certification process in accordance with IAF and ANAB whether listed herein or not.

C.3 PERIOD OF PERFORMANCE. The period of performance for this contract is five years (one base year and three one-year option periods) from the date of award. It is RIA-JMTC's intent to maintain ISO registration/certification without a break in service.

C.4 SAFETY. The contractor shall provide for the safety and protection of personnel employed in support of this contract. The contractor shall comply with all RIA-JMTC Safety Regulations and all Standing Operating Procedures to include wearing appropriate eye and shoe safety equipment when required. Procurement of safety glasses and shoes is the responsibility of the contractor. The contractor /subcontractor shall comply with all Occupational Safety and Health Act (OSHA), as well as Federal, State, and local laws and regulations.

C.5 SECURITY

C.5.1 Site Security. The contractor/subcontractor shall be responsible for the security of your own supplies, material, and equipment. The RIA is an Army installation subject to Department of Defense safe-guards, various precautions and plant protection measures. At all times during execution of this PWS, the contractor will maintain adequate plant protection devices to minimize espionage, sabotage, and other malicious destruction and damage. The contractor shall comply with all security requirements of the Rock Island Arsenal.

C.5.1.A Security Requirements.

AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army-controlled installation, facility, or area. All contractor employees, including subcontractor employees, requiring access to Army installations, facilities,or controlled access areas shall complete AT Level I awareness training within 60 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR (or to the contracting officer, if a COR is not assigned) within 60 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at https://jkodirect.jten.mil.

Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within an Army-controlled installation, facility, or area. The contractor and all associated subcontractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the change clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

For contractors that do not require CAC but require access to a DoD facility or installation. Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the National Crime Information Center interstate identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

Contractor will acquire and need to return all issued U.S. Government Common Access Cards, installation badges, and/or access passes. Use FAR 52.204-9 or PADDS Clause IF00015.

IWATCH (See Something, Say Something) Training. This standard language is for contractor employees with an area of performance within an Army-controlled installation, facility, or area. The contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR.

This training shall be completed within 60 calendar days of contract award and within 60 calendar days of new employees commencing performance, with the results reported to the COR no later than 60 calendar days after contract award.

Impact on contractor performance during increased FPCON during periods of increased threat (contractor personnel working on an installation). During FPCONs Charlie and Delta, services may be discontinued/postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.

Random Antiterrorism Measures Program (RAMP) participation . Contractor personnel working on this installation are subject to participation in installation RAMP security program (e.g. vehicles searches, wearing ID badges, etc.).

C.5.2 Contractor Personnel. Contractor personnel employed in support of this contract shall be native born or naturalized citizens of the United States and may require security clearances issued by the U.S. Government. Foreign nationals shall not be used as auditors due to stringent security requirements. The contractor shall be responsible for obtaining any security clearances that are required for contractor and sub-contractor personnel.

C.5.3 Visitor's Requests. Ten days prior to commencing work, contractor shall provide a completed visitor's request form to the contracting officer representative (COR) for all personnel who will be working onsite or visiting during performance of the PWS.

C.6 INSPECTION. Contractor shall be subject to announced/unannounced security inspections conducted by physical security and other security offices while on Rock Island Arsenal. Inspections can include vehicle searches and searches of personal and professional property within those vehicles and on the contractor's person.

C.7 HOURS OF OPERATION. Normal hours of operation are 0600-1430, Monday through Friday, except for Federal holidays or as stated in the PWS. The contractor /subcontractor shall comply with these hours of operation. Requests to work outside these hours shall be made with the COR 24 hours in advance.

C.8 QUALITY ASSURANCE. Inspection and acceptance of services will be performed by the COR, in accordance with the RIA-JMTC Quality Assurance Surveillance Plan (QASP).

C.9 PERSONNEL. The contractor/subcontractor shall provide a work force possessing the skills, knowledge and training to satisfactorily perform the services required under this PWS. This is a non-personal service contract; personnel performing work under this PWS remain your employees and are not employees of the Government.

C.10 SPECIFIC TASKS. The PWS for new/additional ISO requirements will include a definitive statement of work, to include a delivery or performance schedule, a description of the requirement and any other special information. Contractor response shall include a cost estimate, based on agreed and supplied cost schedules, and proposed performance schedule if you will not be able to meet the performance schedule. The Government Contracting Officer will notify you if we take exception to anything in your proposal and if necessary, conduct negotiations.

C.11 PROGRAM MANAGEMENT

C.11.1 The contractor shall manage all technical performance issues, including logistics support, schedule, and data delivery requirements of the contract. Contractor management responsibility shall include Program Planning and Control, Subcontractor Control and Data Management.

C.11.2 Management Control. The contractor shall have management control, in sufficient detail, to identify contractor, subcontractor, or partner responsibilities.

C.11.3 Logs. The contractor shall maintain daily work logs for work performed under the PWS and have them available for review. As a minimum, the logs shall contain the work date, employee names, work location, and type of work performed.

C.11.4 Progress. The contractor shall make progress on assigned tasks so as not to endanger timely performance. Progress will be determined by adherence to schedule. Adherence to schedule shall be monitored by the RIA-JMTC Performance Certifier in conjunction with the department/s requesting the audit service.

  1. GOVERNMENT FURNISHED EQUIPMENT and SERVICES

D.1 Government Furnished Equipment. RIA-JMTC shall provide an office environment to include applicable space for the contractor to perform on-site auditing services.

D.2 Government Furnished Services. RIA-JMTC will provide full-time escorts during all visits.

APPENDEX A

Performance Work Statement of ISO 45001

E.1 The contractor will provide accreditation, compliance audits, and certifications to International Standard ISO 45001, Occupational Health and Safety. Certification must be accredited by the ANAB and transferable as ANAB.

E.1.2 RIA-JMTC shall be scheduled for audits to ensure no lapse of any certificates. It is the intention of RIA-JMTC to schedule all audits in one calendar week each year. Deviations from the intended scheduling may be necessary to achieve initial registration and may occur at the discretion of RIA-JMTC. To ensure no lapse of any certificates, the first audit must be completed by the second week of October annually. Subsequent audits, if ordered, must be conducted in the option periods during that same time frame.

E.1.3 Upgrades or conversions to International Standard, ISO 45001, Occupational Health and Safety.

Note: Upgrade or conversion means an upgrade or conversion from International Standard, ISO 45001, Occupational Health and Safety if there is a new version released by ISO.

E.1.4 The contractor shall schedule an out-brief for the installation commander and plant management.

E.1.5 All other specific requirements refer to sections A through D.2.

E.1.6 Any other deliverables required by the registration process in accordance with IAF and the ANAB, whether listed herein or not.

Overview

Response Deadline
Past Due
Posted
Set Aside
None
Place of Performance
Rock Island, IL 61299 United States
Source

Current SBA Size Standard
$19.5 Million
Pricing
Multiple Types Common
Est. Level of Competition
Low
Est. Value Range
Experimental
$50,000 - $180,000 (AI estimate)
Odds of Award
28%
Signs of Shaping
The solicitation is open for 8 days, below average for the ACC Rock Island.
On 9/2/26 ACC Rock Island issued Sources Sought W519TC-26-SS-035449 for ISO 450001 Certification and Maintenance due 9/10/26. The opportunity was issued full & open with NAICS 541990 and PSC R420.
Primary Contact
Name
Heather Petersen   Profile
Phone
None

Documents

Posted documents for Sources Sought W519TC-26-SS-035449

Opportunity Assistant


Analyze Opportunity

Generate a Draft

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought W519TC-26-SS-035449

Similar Active Opportunities

Open contract opportunities similar to Sources Sought W519TC-26-SS-035449

Experts for ISO 450001 Certification and Maintenance

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > AMC > ACC > ACC-CTRS > ACC RI
FPDS Organization Code
2100-W519TC
Source Organization Code
500181913
Last Updated
Last Updated By
heather.j.petersen.civ@army.mil
Archive Date