Search Contract Opportunities

Innovative Approaches to Reducing the Complexity and Increasing Sustainability of Linkless Ammunition Loading System III

ID: N221-008 • Type: SBIR / STTR Topic • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Do the documents mention an incumbent contractor?
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

OUSD (R&E) MODERNIZATION PRIORITY: General Warfighting Requirements (GWR) TECHNOLOGY AREA(S): Weapons OBJECTIVE: Identify and demonstrate system innovative approaches to the Linkless Ammunition Loading System III (LALS III) to increase the system's reliability and availability. DESCRIPTION: The M61A1 and M61A2 gun systems installed on the legacy and super Hornet F/A-18 are loaded using the LALS III, consisting of a system of gears and conveyors that are complicated to utilize and maintain. There have been several attempts to increase the Mean Time Between Failure (MTBF). However, with the incorporated changes the system still has a high-failure rate for several components (e.g., the conveyor assembly, aircraft interchange unit, and chain ladder assembly) as identified by Conventional Ordnance Discrepancy Reports (CODR). This high-failure rate causes mission delays and an increase to the maintenance workload for the fleet. These components are all complex parts of the overall conveyor system that moves ammunition throughout the LALS III. When connected to the aircraft or the ammunition transfer system to load or download ammunition in and out of the LALS III, there are several sequential steps necessary for the system to function properly. Severe damage and timing issues occur to these components if one step is missed or done out of order. Potential improvements include: (a) an internal timing and tension function to remove human error from the equation, and (b) improvements to the conveyor assembly, aircraft interchange unit, and chain ladder assembly to make them more robust to handle the rigors of the aircraft carrier environment, Forward Operating Bases, and decrease maintenance complexity. Any materials considered should be all-weather, corrosion resistant, suffer no adverse effects from contact with solvents, lubricants, or oils, and be compatible in a Hazards of Electromagnetic Radiation to Ordnance (HERO) environment. The overall goal is to increase the overall availability, sustainability, and readiness. PHASE I: Define, develop, and demonstrate the feasibility of innovative concepts and procedures increasing the reliability of failed components of the LALS III. Use CODR data to analyze high-failure areas and evaluate failed components of the LALS III. The Phase I effort will include prototype plans to be developed under Phase II. PHASE II: Refine the conceptual design and develop a prototype. Perform testing of prototype to demonstrate their effectiveness. PHASE III DUAL USE APPLICATIONS: Integrate solutions in a LALS III. Support operational assessment of the prototype design solutions by a squadron prior to full-scale fielding. The improvements to the LALS III could potentially be modified to fit other ammunition conveyor units or commercial conveyor assemblies. The improved solutions could be sold to manufacturing processes to increase their reliability and decrease maintenance requirements. REFERENCES: United States Government Accountability Office. (2020, January). Defense acquisitions: Senior leaders should emphasize key practices to improve weapon system reliability (GAO-20-151). United States Government Accountability Office. https://www.gao.gov/assets/710/706781.pdf. Glowacki, B. (2001). Ammunition loading. NAVEDTRA 14313: Aviation ordnanceman (Ch. 7, pp. 7-1 7-24). Naval Education and Training Professional Development and Technology Center. https://www.globalsecurity.org/military/library/policy/navy/nrtc/14313_ch7.pdf. KEYWORDS: Linkless Ammunition Loading System III (LALS III); 20mm Ammunition; Weapons Unloading; Weapons Loading; Weapons Handling; Linkless System

Overview

Response Deadline
Feb. 10, 2022 Past Due
Posted
Dec. 1, 2021
Open
Jan. 12, 2022
Set Aside
Small Business (SBA)
Place of Performance
Not Provided
Source
Alt Source

Program
SBIR Phase I / II
Structure
Contract
Phase Detail
Phase I: Establish the technical merit, feasibility, and commercial potential of the proposed R/R&D efforts and determine the quality of performance of the small business awardee organization.
Phase II: Continue the R/R&D efforts initiated in Phase I. Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II. Typically, only Phase I awardees are eligible for a Phase II award
Duration
6 Months - 1 Year
Size Limit
500 Employees
On 12/1/21 Department of the Navy issued SBIR / STTR Topic N221-008 for Innovative Approaches to Reducing the Complexity and Increasing Sustainability of Linkless Ammunition Loading System III due 2/10/22.

Documents

Posted documents for SBIR / STTR Topic N221-008

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Contract Awards

Prime contracts awarded through SBIR / STTR Topic N221-008

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to SBIR / STTR Topic N221-008

Similar Active Opportunities

Open contract opportunities similar to SBIR / STTR Topic N221-008

Experts for Innovative Approaches to Reducing the Complexity and Increasing Sustainability of Linkless Ammunition Loading System III

Recommended subject matter experts available for hire