Search Contract Opportunities

In-Situ Resource Utilization

ID: Focus Area 8 • Type: SBIR / STTR Topic • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Do the documents mention an incumbent contractor?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

In-Situ Resource Utilization (ISRU) involves any hardware or operation that harnesses and utilizes in-situ' resources (natural and discarded) to create products and services for robotic and human exploration. Local resources include natural' resources found on extraterrestrial bodies such as water, solar wind implanted volatiles (hydrogen, helium, carbon, nitrogen, etc.), vast quantities of metals in mineral rocks and soils, and atmospheric constituents, as well as human-made resources such as trash and waste from human crew, and discarded hardware that has completed its primary purpose. The most useful products from ISRU are propellants, fuel cell reactants, life support commodities (such as water, oxygen, and buffer gases), and feedstock for manufacturing and construction. ISRU products and services can be used to i) reduce Earth launch mass or lander mass by not bringing everything from Earth, ii) reduce risks to the crew and/or mission by reducing logistics, increasing shielding, and providing increased self-sufficiency, and/or iii) reducing costs by either needing less launch vehicles to complete the mission or through the reuse of hardware and lander/space transportation vehicles. Since ISRU systems must operate wherever the resource of interest exists, technologies and hardware will need to be designed to operate in harsh environments, reduced gravity, and potential non-homogeneous resource physical, mineral, and ice/volatile characteristics. This year's solicitation will focus on critical technologies needed in the areas of Resource Acquisition and Consumable Production for the Moon and Mars. The ISRU focus area is seeking innovative technology for: Novel Silicate Reduction Methods Noncontact High Temperature Measurement Regolith Feed/Removal Systems and Mineral Measurement for Oxygen Removal Non-Water Volatile Capture Regolith/Ice Crushing Size-Sorting Beneficiation of Water Ice Mineral Beneficiation Metal Production As appropriate, the specific needs and metrics of each of these specific technologies are described in the subtopic descriptions.

Overview

Response Deadline
March 9, 2022 Past Due
Posted
Jan. 6, 2022
Open
Jan. 6, 2022
Set Aside
Small Business (SBA)
Place of Performance
Not Provided
Source
Alt Source

Program
SBIR Phase I
Structure
Contract
Phase Detail
Phase I: Establish the technical merit, feasibility, and commercial potential of the proposed R/R&D efforts and determine the quality of performance of the small business awardee organization.
Duration
6 Months
Size Limit
500 Employees
On 1/6/22 National Aeronautics and Space Administration issued SBIR / STTR Topic Focus Area 8 for In-Situ Resource Utilization due 3/9/22.

Documents

Posted documents for SBIR / STTR Topic Focus Area 8

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Contract Awards

Prime contracts awarded through SBIR / STTR Topic Focus Area 8

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to SBIR / STTR Topic Focus Area 8

Similar Active Opportunities

Open contract opportunities similar to SBIR / STTR Topic Focus Area 8