Search Contract Opportunities

Holt Lock Monolith R14 Restoration   4

ID: W9127825RA015 • Type: Solicitation • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Loading

Description

Posted: June 2, 2025, 6:18 p.m. EDT

The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to repair monolith R14 in accordance with the plans and specifications. Work includes but not limited to horizontal drilling, installing horizontal post tension anchor bars, internal pressure grouting, epoxy injection of surface cracks, installing water stops, underwater concrete placement, and dewatering the lock chamber at Holt Lock. Amendment 0001 is posted 16 May 2025 to update the Table of Contents, Bid Schedule, Explanation of Bid Schedule, and several sections within the specifications as well as drawings. The response date has been extended to 4 June 2025. Amendment 0002 posted 2 June 2025 updates the Bid Scheule, Bid Schedule Notes, Explanation of the Bid Scheudle, Section 01 00 00, Section 13 51 00.10, Section 31 68 13, and extends the response date to 10 June 2025.

Posted: May 16, 2025, 4:36 p.m. EDT
Posted: May 9, 2025, 11:55 a.m. EDT
Posted: April 24, 2025, 12:25 p.m. EDT
Background
The project is issued by the agency responsible for the maintenance and operation of Holt Lock, which plays a critical role in waterway navigation and infrastructure.

The goal of this contract is to restore Monolith R14 to ensure its structural integrity and functionality, thereby supporting the overall mission of maintaining safe and efficient waterway operations.

Work Details
The contractor is required to provide all labor, materials, and equipment necessary for the repair of Monolith R14.

The scope of work includes:
- horizontal drilling
- installing horizontal post tension anchor bars
- internal pressure grouting
- epoxy injection of surface cracks
- installing water stops
- underwater concrete placement
- dewatering the lock chamber at Holt Lock.

Place of Performance
The construction projects will be performed at Holt Lock.

Overview

Response Deadline
June 10, 2025, 3:00 p.m. EDT (original: May 28, 2025, 3:00 p.m. EDT) Past Due
Posted
April 24, 2025, 12:25 p.m. EDT (updated: June 2, 2025, 6:18 p.m. EDT)
Set Aside
None
Place of Performance
Tuscaloosa, AL 35406
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 4/24/25 USACE Mobile District issued Solicitation W9127825RA015 for Holt Lock Monolith R14 Restoration due 6/10/25. The opportunity was issued full & open with NAICS 237990 and PSC Y1KA.
Primary Contact
Name
Jennifer Suit   Profile
Phone
(251) 441-6466

Secondary Contact

Name
Elizabeth Trimble   Profile
Phone
(251) 690-3329

Documents

Posted documents for Solicitation W9127825RA015

Opportunity Assistant


AI Analysis

Opportunity Lifecycle

Procurement notices related to Solicitation W9127825RA015

Award Notifications

Agency published notification of awards for Solicitation W9127825RA015

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W9127825RA015

Similar Active Opportunities

Open contract opportunities similar to Solicitation W9127825RA015

Experts for Holt Lock Monolith R14 Restoration

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SAD > US ARMY ENGINEER DISTRICT MOBILE
FPDS Organization Code
2100-W91278
Source Organization Code
100221437
Last Updated
June 2, 2025
Last Updated By
jennifer.h.suit@usace.army.mil
Archive Date
May 16, 2026