Search Contract Opportunities

Hill AFB Building 225 Area D Renovation   2

ID: W9123823R0004 • Type: Solicitation
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: Feb. 28, 2023, 3:27 p.m. EST

The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires design-build construction services to remove and replace the roof of Area D of Building 225 (B225) at Hill Air Force Base (HAFB) in Utah, in accordance with terms of the contract and other attachments. Work will also include renovating office in B225.NAICS Code: 236220, Commercial and Institutional Building ConstructionPSC: Z2BZ, Repair or Alteration of Other Airfield StructuresSBA Size Standard: $39.5 millionIn accordance with DFARS 236.204(ii) the estimated magnitude of construction is expected to be between $25M to $100MDesign and construction shall include all civil, architectural, geotechnical, structural, utilities, landscaping, security, mechanical, electrical, demolition, and communications work to support the necessary construction. Site Visit Agenda and Sign In Sheet attached.

Amendment 0001 is issued to update site visit information provided in FAR Clause 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) - ALTERNATE I (FEB 1995)

Amendment 0002 is issued to post Attachment C as the original posting for Attachment C in PIEE was corrupted.

Amendment 0003 is issued change the past performance relevancy from $60M to between $25M to $80M.

Amendment 0004 is issued to change the past performance relevancy square footage (SF) from 500,000 SF to 50,000 SF or larger.

Amendment 0005 is issued to delete wage determination UT20220083-04 and replace with wage determination WD UT20220083-05. The proposal due date and time remains unchanged.

*Visit 'https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W9123823R0004' to obtain more details.*

Posted: Dec. 30, 2022, 4:53 p.m. EST
Posted: Dec. 19, 2022, 2:14 p.m. EST
Posted: Nov. 18, 2022, 3:42 p.m. EST
Posted: Nov. 16, 2022, 3:56 p.m. EST
Posted: Nov. 14, 2022, 12:09 p.m. EST
Background
The U.S. Army Corps of Engineers (USACE) Sacramento District (SPK) requires design-build construction services to remove and replace the roof of Area D of Building 225 (B225) at Hill Air Force Base (HAFB) in Utah. The work will also include renovating office space in B225. The estimated magnitude of construction is expected to be between $25M to $100M. The design and construction shall include all civil, architectural, geotechnical, structural, utilities, landscaping, security, mechanical, electrical, demolition, and communications work to support the necessary construction.

Work Details
The construction tasks include removing and replacing the roof of Area D of Building 225 at Hill Air Force Base in Utah and renovating office space in B225. The work involves providing all labor, management, supervision, tools, materials, equipment, and transportation for the construction and repair of the roof and wooden deck area D at Hill Air Force Base. It also includes demolition and reconstruction of existing office space along the North-South direction in the middle of Aircraft Maintenance Hangar Building 225 area D at Hill Air Force Base. The contract includes various clauses incorporated by reference such as Commercial and Government Entity Code Reporting, Alternative Line Item Proposal, Submission Of Offers In The English Language, and others.

Period of Performance
The period of performance for the contract is from 03-Jan-2019 to 31-Dec-2018.

Place of Performance
The construction projects will be performed at Hill Air Force Base in Utah.

Overview

Response Deadline
Jan. 3, 2023, 4:00 p.m. EST Past Due
Posted
Nov. 14, 2022, 12:09 p.m. EST (updated: Feb. 28, 2023, 3:27 p.m. EST)
Set Aside
None
Place of Performance
Not Provided
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Evaluation Criteria
Best Value
Est. Level of Competition
Average
On 11/14/22 USACE Sacramento District issued Solicitation W9123823R0004 for Hill AFB Building 225 Area D Renovation due 1/3/23. The opportunity was issued full & open with NAICS 236220 and PSC Z2BZ.
Primary Contact
Name
Britanie Butler   Profile
Phone
(385) 303-9444

Secondary Contact

Name
Amelia Bryant   Profile
Phone
None

Documents

Posted documents for Solicitation W9123823R0004

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation W9123823R0004

Award Notifications

Agency published notification of awards for Solicitation W9123823R0004

Contract Awards

Prime contracts awarded through Solicitation W9123823R0004

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W9123823R0004

Similar Active Opportunities

Open contract opportunities similar to Solicitation W9123823R0004

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SPD > US ARMY ENGINEER DISTRICT SACRAMENT
FPDS Organization Code
2100-W91238
Source Organization Code
100221301
Last Updated
Nov. 18, 2023
Last Updated By
britanie.v.butler@usace.army.mil
Archive Date
Nov. 18, 2023