Geothermal Generation - Slim Well, F. E. Warren AFB, Wyoming   4

ID: W9128F24R0024 • Type: Solicitation • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: May 27, 2025, 2:29 p.m. EDT
Am-0006 - Revised proposal due date and revised proposal acceptance period // Am-0005 - Revised proposal due date and revised proposal acceptance period // Am-0004 - Updated Wage Determination, revised proposal due date, and proposal acceptance period // Am-0003 - Revised Specs/Drawing and updated DIV 21/22 // Am-0002 - Extend proposal due date to 27 NOVEMBER 2024 // Am-0001 - Extend proposal due date to 31 OCTOBER 2024 // The F. E. Warren Geothermal Generation Project is a comprehensive initiative aimed at exploring and characterizing the presence and productivity of geothermal resources at F. E. Warren AFB, east of Cheyenne, Wyoming. The project involves drilling a geothermal well to measure the thickness and test the properties of the Hartville Formation and the underlying formations, such as the Guernsey, Flathead, and Pre-Cambrian Formations. The drilling is planned to reach a maximum measured depth of 14,000 feet. The conceptual design of the well aims to comprehensively measure the temperature, pressure, and productivity of the formations, with a particular focus on the Hartville Formation.
Posted: May 16, 2025, 11:28 a.m. EDT
Posted: Jan. 31, 2025, 3:14 p.m. EST
Posted: Nov. 19, 2024, 3:30 p.m. EST
Posted: Oct. 29, 2024, 2:15 p.m. EDT
Posted: Oct. 9, 2024, 3:17 p.m. EDT
Posted: Aug. 30, 2024, 1:58 p.m. EDT
Background
The F. E. Warren Geothermal Generation Project is a comprehensive initiative aimed at exploring and characterizing the presence and productivity of geothermal resources at F. E. Warren AFB, located east of Cheyenne, Wyoming. The project is focused on drilling a geothermal well to measure the thickness and test the properties of the Hartville Formation, along with underlying formations such as the Guernsey, Flathead, and Pre-Cambrian Formations.

The goal is to gather data that will determine if conditions exist to support a geothermal power plant. The estimated construction cost for this project ranges from $10,000,000 to $25,000,000.

Work Details
The contract includes various construction tasks related to drilling a geothermal well up to a maximum depth of 14,000 feet. Key tasks include:
1. Well Pad Preparation: Conduct civil works to prepare the well pad and work area including access roads.
2. Mobilization of Drilling Equipment: Contract a suitable drilling rig capable of drilling an 8-1/2 inch hole to 14,000 foot vertical depth.
3. Rig Up Drilling Equipment: Install 24-inch conductor pipe.
4. Contract Drilling (0 to 2,500 feet): Drill well up to a depth of 2,500 feet including all necessary labor and materials.
5. Contract Drilling (2,500 to 5,000 feet): Drill well between 2,500 and 5,000 feet including all necessary labor and materials.
6. Contract Drilling (5,000 - 11,000 feet): Drill well between 5,000 and 11,000 feet including all necessary labor and materials.
7. Contract Drilling (11,000 - 14,000 feet): Drill well between 11,000 and 14,000 feet including all necessary labor and materials.
8. Rig Test and Wellhead: Conduct rig test of well and install permanent wellhead.
9. Demobilization and Clean Up: Remove drilling rig and crew from the site along with all drilling/testing equipment.
10. Well Completion and Resource Evaluation Report: Analyze test data and prepare a resource evaluation report.
11. Option for Well Plugging and Abandonment: An option that may be exercised within 365 days of Notice to Proceed.

Period of Performance
The contract will be performed over a period of approximately one year from the date of Notice to Proceed.

Place of Performance
F.E. Warren Air Force Base, east of Cheyenne, Wyoming.

Overview

Response Deadline
June 3, 2025, 3:00 p.m. EDT (original: Oct. 11, 2024, 3:00 p.m. EDT) Past Due
Posted
Aug. 30, 2024, 1:58 p.m. EDT (updated: May 27, 2025, 2:29 p.m. EDT)
Set Aside
None
Place of Performance
FE Warren AFB, WY 82001
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
62% of similar contracts within the Department of the Army had a set-aside.
On 8/30/24 USACE Omaha District issued Solicitation W9128F24R0024 for Geothermal Generation - Slim Well, F. E. Warren AFB, Wyoming due 6/3/25. The opportunity was issued full & open with NAICS 237110 and PSC F015.
Primary Contact
Name
Scott Dwyer   Profile
Phone
(402) 995-2584

Secondary Contact

Name
Jeffrey Wyant   Profile
Phone
(402) 995-2071

Documents

Posted documents for Solicitation W9128F24R0024

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation W9128F24R0024

Award Notifications

Agency published notification of awards for Solicitation W9128F24R0024

Contract Awards

Prime contracts awarded through Solicitation W9128F24R0024

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W9128F24R0024

Similar Active Opportunities

Open contract opportunities similar to Solicitation W9128F24R0024

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > NWD > W071 ENDIST OMAHA
FPDS Organization Code
2100-W9128F
Source Organization Code
100255233
Last Updated
May 27, 2025