Description

State: Montana

City: Bozeman

Delineated Area: City boundaries of Bozeman, MT *See DA map attached*

Minimum Sq. Ft. (ABOA): 2,350 SF

Maximum Sq. Ft. (ABOA): 2,468 SF

Space Type: Office

Parking Spaces (Total): 3

Full Term: 180 months

Firm Term: 120 months

Additional Requirements:

SPACE REQUIREMENTS

A. All space must be contiguous, and preferably on the 2nd floor or higher. Space on the first floor
will be considered only when no other space is available, or if deemed appropriate by Tenant.
First-floor spaces require additional security measures.
B. If the exterior skin of the building is not of substantial construction as determined by Tenant
Security (e.g., concrete, filled CMU) and does not meet Tenant's forced entry protection
requirements, interior assembly of perimeter walls must be constructed in accordance with Wall
Type A7 specifications.
C. All exterior perimeter windows must have fragment retention film, except at SCIF Rooms, which
must have film rated for RF/IR shielding and blast film.
D. All perimeter windows less than 18'-0 from grade or accessible platform (e.g., air conditioners,
fire stairs, adjacent roofs, ledges, or windows) must have forced entry protection such as
manbars or security screening. Assessment of accessible platform(s) will be determined by
Tenant Security.
E. Design of workstation must ensure computer monitors do not face exterior windows.
F. Roofs less than 18'-0 from grade or accessible platform must meet the same forced entry
protection and sound attenuation requirements as the building's perimeter walls. Metal roofs
less than 18'-0 from grade or accessible platform must be 18-gauge or greater to meet the
same forced entry protection and sound attenuation requirements as perimeter walls.
G. Metal structure buildings that will have an Open Storage Secure security posture must have
the secured perimeter constructed to meet forced entry protection requirements, Wall Type A7,
or approved equivalent by Tenant and CO.
H. If the space and/or building are of wood joist construction or in an historical building, additional
security measures will be required and must be approved by Tenant Security.I. Skylights must be removed or secured against forced entry, blast, and visual observation.
J. Where Tenant space adjoins another building, tenant, or public areas, perimeter walls of
Tenant space must be constructed slab-to-slab in accordance with the diagram for Wall Type
A7. All conduits, backboxes, and electrical devices on Tenant demising wall must be surface
mounted on the secure side. Surface mounting is not required if non-secured side of Wall Type
A7 is available for inspection by Tenant.
K. No telephone lines, data lines, electrical service, plumbing service, or ducts other than that
required for Tenant are permitted to pass through the space, except with specific approval from
Tenant and CO or when routed through building space (such as electrical or telephone closets
dedicated to that use). All wiring, conduits, and pipes running through the space and not
serving Tenant's needs must be removed and/or rerouted. If wiring, conduits, and pipes must
not be removed and/or rerouted, they must be enclosed with a construction assembly compliant
to secure wall requirements.

L. Future ceiling, floor slab, or demising wall penetrations through Tenant's secured perimeter will
not be permitted.
M. If floor slab does not extend to the skin of the building, additional security measures will be
required to meet forced entry protection, Tenant Security sound attenuation requirements, and
RF requirements.
N. The space will be provided with file safes weighing between 850 lbs and 1,000 lbs each.
Although safes will be dispersed throughout the office, floor load of the proposed site must be
capable of supporting this additional weight. The quantity and location of safes may change
over the course of the lease. The Lessor shall provide the Tenant with a floor plan showing
locations where the safes can be located.
O. Tenant's regular business hours are 7:00 AM to 5:30 PM; however, 24-hour access to the
space and any provided elevator service must be available 365 days per year.
P. One (1) elevator must be provided with override control. If the office is located on the 6th floor
or above, elevator must be on emergency power.

SITE REQUIREMENTS

A. Proposed site must not be within 640'-0 of any facilities identified by ISC as hazardous
materials transportation/storage facilities.
1. Hazardous locations include facilities with potential environmental threats (e.g., fuel storage
areas, gas stations, chemical manufacturing facilities, and railroad lines transporting
hazardous material).
2. Special consideration should be given to exclude sites located near hazardous areas, such
as bulk storage sites (e.g., hazardous materials storage sites, water purification centers,
above-ground fuel storage, and rail yards).
3. It is preferred that the proposed facility not be located near Low Risk Facilities (e.g., day
care centers, senior centers, schools, hospitals, and religious/rehabilitation/social service
centers).
B. Proposed facility must not be located within 400'-0 of public defenders, ICE, probation offices,
IRS, universities, other businesses, or facilities, deemed unacceptable by Tenant Security for
safety purposes. This requirement may be waived by Tenant Security if no other facility is
deemed acceptable. In those cases, enhanced security requirements may be necessary.
C. Proposed Tenant spaces or facilities within 400'-0, or adjacent to facilities associated with
foreign powers identified in Tenant's National Security Threat List, will not be considered.
D. For proposals of new construction of a standalone facility:
1. Standoff distance may be required from defended perimeter to the fa ade of the building to
house the Tenant office, if required by FSL rating.
2. Defended perimeter must be measured as the distance from building to boundary
protected by bollards, planters, or other barriers approved by Tenant.
E. For proposals of space in existing buildings, standoff distance must be provided from the curb
line or nearest point accessible by a vehicle to the fa ade of the building to house the Tenant
office.

F. Space shall have a minimum setback of at least 20 feet, where the setback will be measured from the interior perimeter wall of occupied Tenant space to any point where an unscreened or otherwise unauthorized vehicle can travel or park. This requirement may be waived by Tenant Security.

PARKING

A. Uncontrolled underground or uncontrolled under-building parking is not permitted for facilities
with FSL III, IV, or V ratings. A standalone or mixed-tenant facility with uncontrolled
underground or under-building parking should not be considered for a facility with an FSL I or II.
B. A mixed-tenant facility with public parking withing 30 feet of the interior perimeter wall must not
be considered for a facility with an FSL III, IV, or V rating. A mixed-tenant facility with public
parking within 20 feet of the interior perimeter wall must not be considered for a facility with an
FSL I or II rating.
C. A stand-alone facility with public parking within 100 feet of the facility must not be considered
for a facility with an FSL III, IV, or V rating. This requirement may be waived by Tenant Security
if no other facility is deemed acceptable. In those cases, enhanced security requirements may
be necessary.

Expressions of interest must include the following information:

Building name and address and location of the available space within the building

Rentable square feet available and expected rental rate per rentable square foot, fully serviced

ANSI/BOMA office area (ABOA) square feet to be offered and expected rental rate per ABOA square foot, fully serviced.

Indicate whether the quoted rental rate includes an amount for tenant improvements and state the amount (if any)

Date of space availability

Building ownership information

Amount of parking available on-site and its cost. Include whether expected rental rate includes the cost of the required Government parking (if any)

Energy efficiency and renewable energy features existing within the building

List of building services provided.

The U.S. Government currently occupies office and related space in a building under a lease in Bozeman, MT, that will be expiring. The Government will consider alternative space if economically advantageous. In making this determination, the Government will consider, among other things, the availability of alternative space that potentially can satisfy the Government's requirements, as well as costs likely to be incurred through relocating, such as physical move costs, replication of tenant improvements and telecommunication infrastructure, and non-productive agency downtime.

Offered space must meet Government requirements for fire safety, accessibility, seismic, and sustainability standards per the terms of the Lease. A fully serviced lease is required. Offered space shall not be in the 100 year flood plain.

Entities are advised to familiarize themselves with the telecommunications prohibitions outlined under Section 889 of the FY19 National Defense Authorization Act (NDAA), as implemented by the Federal Acquisition Regulation (FAR). ). For more information, visit: https://acquisition.gov/FAR-Case-2019-009/889_Part_B.

Expressions of Interest Due: Monday, June 29, 2026; 5:00PM PST

Market Survey (Estimated): TBD

Occupancy (Estimated): February 1, 2027

Send Expressions of Interest to:

Amy Hascall, Leasing Specialist

Email Address: amy.hascall@gsa.gov

Government Contact Information

Lease Contracting Officer: Joel Wilson

Leasing Specialist: Amy Hascall

Loading Map
Loading Map

Overview

Response Deadline
June 29, 2026, 8:00 p.m. EDT Due in 13 Days
Posted
June 15, 2026, 6:11 p.m. EDT
Set Aside
None
Place of Performance
Bozeman, MT United States
Source

Current SBA Size Standard
$34 Million
Est. Level of Competition
Low
Est. Value Range
Experimental
$700,000 - $1,300,000 (AI estimate)
Odds of Award
19%
On 6/15/26 Leasing Office issued Sources Sought 4MT0170 for General Services Administration (GSA) Seeks to Lease the Following Space in Bozeman, MT due 6/29/26. The opportunity was issued full & open with NAICS 531120 and PSC X1AA.
Primary Contact
Name
Amy Hascall   Profile
Phone
None

Documents

Posted documents for Sources Sought 4MT0170

Opportunity Assistant


AI Analysis

AI Generate

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought 4MT0170

Similar Active Opportunities

Open contract opportunities similar to Sources Sought 4MT0170

Experts for General Services Administration (GSA) Seeks to Lease the Following Space in Bozeman, MT

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
GENERAL SERVICES ADMINISTRATION > PUBLIC BUILDINGS SERVICE > PBS CENTRAL OFFICE - OFC OF LEASING
FPDS Organization Code
4740-PT000
Source Organization Code
100183373
Last Updated
June 15, 2026
Last Updated By
amy.hascall@gsa.gov
Archive Date
July 14, 2026