Search Contract Opportunities

Garage Door Fabrication and Installation

ID: FA251723Q0109 • Type: Solicitation

Description

Posted: Sept. 12, 2023, 5:35 p.m. EDT

The purpose of this update (12 September 2023) is to add photos of the existing garage door wiring.

The purpose of this update (8 September 2023) is to include the revised SOW that significantly changes the requirement to roll-up style garage doors.

The purpose of Amendment 1 is to:

a) Update thet Site visit time and date b) Update deadline for questions to be submited c) Include notice and instructions on Bldg 1 Security policy and directive of NO Electronic devices allowed on site. They must be left in vehicles

The purpose of this combined synopsis and solicitation is for Garage Door Fabrication and Installation. Contractor will fabricate and install garage doors IAW the Statement of Work (SOW).

Posted: Sept. 8, 2023, 6:28 p.m. EDT
Posted: Aug. 31, 2023, 7:08 p.m. EDT
Posted: Aug. 25, 2023, 3:37 p.m. EDT
Posted: Aug. 25, 2023, 12:45 p.m. EDT
Background
The solicitation is for Garage Door Fabrication and Installation at Peterson Space Force Base. The work is to be performed in accordance with the Statement of Work (SOW) prepared by SSgt Spencer Louis of the 21st Civil Engineer Squadron. The purpose of the solicitation is to update the SOW and include photos of the existing garage door wiring.

Work Details
The scope of work includes reconfiguring and installing new custom garage doors, with specific dimensions and design requirements. The new garage doors are to be made of heavy-duty steel material, utilize an overhead door system, and use a belt-driven system for noise reduction. The contractor is responsible for obtaining all necessary licenses and permits, complying with environmental and hazardous material handling regulations, and following a specific work schedule. Access to the work area requires proper authorization, background checks, and coordination with the base security personnel.
Safety measures, protection of government property, site maintenance, cleanup, and deliverables are also outlined in detail.

Period of Performance
The estimated Period of Performance (PoP) for this requirement is 90 days after receipt of order (ARO) to include lead times for traveling.

Place of Performance
The work will be performed at Peterson Space Force Base in Colorado.

Overview

Response Deadline
Sept. 14, 2023, 2:00 p.m. EDT (original: Sept. 6, 2023, 2:00 p.m. EDT) Past Due
Posted
Aug. 25, 2023, 12:45 p.m. EDT (updated: Sept. 12, 2023, 5:35 p.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Colorado Springs, CO 80914 United States
Source
SAM

Current SBA Size Standard
$22 Million
Pricing
Fixed Price
Est. Level of Competition
Average
On 8/25/23 Space Force issued Solicitation FA251723Q0109 for Garage Door Fabrication and Installation due 9/14/23. The opportunity was issued with a Small Business (SBA) set aside with NAICS 238290 (SBA Size Standard $22 Million) and PSC Z1AA.
Primary Contact
Name
Karen Grinder   Profile
Phone
(719) 556-8232

Secondary Contact

Name
Ruben Guzman   Profile
Phone
(719) 556-8987

Documents

Posted documents for Solicitation FA251723Q0109

Question & Answer

Incumbent or Similar Awards

Contracts Similar to Solicitation FA251723Q0109

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation FA251723Q0109

Similar Active Opportunities

Open contract opportunities similar to Solicitation FA251723Q0109

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE AIR FORCE > AFSPC > FA2517 21 CONS
FPDS Organization Code
5700-FA2517
Source Organization Code
100015301
Last Updated
Sept. 29, 2023
Last Updated By
karen.grinder@us.af.mil
Archive Date
Sept. 29, 2023