Search Contract Opportunities

GAOA Timberline Lodge Boiler   3

ID: 1240BH21R0014 • Type: Presolicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: April 23, 2021, 2:35 p.m. EDT

A pre-proposal conference is currently planned for 0900 on 4 May 2021 at Timberline Lodge. In order to facilitate conference preparations, it is requested that Ben Newcomb be contacted and advised of the number of persons who will attend. Benjamin.newcomb@usda.gov or 503.668.1778.

This proposed solicitation is for all labor, equipment and materials required to do the following work at the Timberline Lodge, Zig Zag Ranger District, Mt Hood National Forest:

This project is set up to be phased. The following is a description of Phase 1, which are the Base items.

1.Bid Item 001: Remove abandoned generator in the boiler room.

2. Bid Item 002: Install a 2,000 MBH hot water boiler and a 15 HP circulation pump. The existing steam boilers will remain.

3. Bid Item 002: Replace 2 existing fuel oil pumps and piping to new boiler and 2 existing boilers.

4. Install new panel CH-1 with capacity to serve the needs of phase I-IV, Options 1-3 in the Lodge and all necessary circuits, wiring, devices and controls for Phase I operational needs.

5. Bid Item 003: Install new main hot water piping in the boiler room. Provide hot water to patio, front Lodge entry and CS Price snow melt systems. Keep snow melt heating pipe, pump and accessories intact and connect to new hot water boiler. Integrate with existing control system to render the system operational.

6. Bid Item 004: Design complete DDC Control system for Main Lodge and Day lodge for phases 1-4. See section 23 09 00 Instrumentation and Controls Performance Specification, 26 09 00 Controls and Instrumentation, 27 00 00 Telecommunications Wiring System, 27 00 01 Network Security for connection details. The Controls will be installed per phase.

7. Bid Item 004: Integrate new control system with the existing Honeywell DDC control system capable of serving the entire project, phases 1-4, and provide software, infrastructure, and equipment necessary to render the systems installed in Phase I operational. System will include control system hardware, wiring, and software programs.

8. Bid item 005: Design the control system to provide for security from Malware, hacking and other threats. System should include a firewall system and wiring changes to isolate the existing DDC system network connections from the existing building network. See section 27 00 01 for Network Security design criteria.

***Items 1-6 need to be completed before consistently freezing temperatures and snow occur (typically late October) in order to minimize impacts to Lodge operations and prevent freeze damage to existing water piping. ***

9. Bid Item 003: Install new main hot water piping from boiler room to attic spaces, stub off isolation valves for connection to individual room radiators of all phases; replace/install approximately 34 finned tube room radiators in existing and newly constructed historically accurate cabinets. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

Phase 1 will have a period of performance of 150 days starting July 2021.

Option No.1: Phase 2 of the Boiler Replacement project consists of the following:

1. Remove one (1) steam boiler.

2. Install new 5,000 MBH boiler and a 15 HP circulation pump, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

3. Replace/install approximately 94 Finned tube room radiators in existing and newly constructed historically accurate cabinets, on west side of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

4. Expand existing electrical service, existing controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Connect CS Price Heating to new hot water system

Phase 2 will have a period of performance of 150 days starting no later than May 2022.

Option No. 2: Phase 3 of the Boiler Replacement project consists of the following:

1. Replace second steam boiler and install new, third, 5,000 MBH boiler, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.

2. Replace/install approximately 93 Finned tube room radiators in existing and newly constructed historically accurate cabinets, in the remaining areas of building and connect heating and fan coil units at the common spaces. This work will need to be coordinated with Lodge operations to minimize impacts to the operation of the Lodge.

3. Connect kitchen, domestic hot water, pool and spa to the new hot water system.

4. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

5. Install Swimming Pool and Spa Heating Systems

Phase 3 will have a period of performance of 150 days starting no later than May 2023.

Option No. 3: Phase 4 of the Boiler Replacement project consists of the following:

  1. Replace 2 hot water boilers with two new 4,000 MBH hot water boilers, pumps, and all associated electrical work, control system additions and modifications needed to render the installation fully functional.
  2. Expand existing electrical service, controls infrastructure and equipment to make the system replacements/additions fully functional.

Phase 4 will have a period of performance of 120 days starting no later than May 2023.

Including all optional items, the Government's estimated magnitude of this project is more than $10,000,000.

Solicitation will be available for download from beta.sam.gov on or about 4/26/21.

NOTE: prospective awardee shall be registered and active in the System for Award Management (SAM) data base when submitting an offer, and shall continue to be registered until time of award, during performance, and through final payment of a contract resulting from this solicitation. Information on registration may be obtained via the internet at: http://www.sam.gov. All contractors and vendors must complete the electronic version of the Representations and Certifications in the SAM system. If at the time of receipt of offers, an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror.

Posted: April 22, 2021, 4:35 p.m. EDT
Posted: April 12, 2021, 4:58 p.m. EDT
Posted: April 9, 2021, 10:19 a.m. EDT
Posted: April 9, 2021, 10:03 a.m. EDT
Posted: April 6, 2021, 9:17 a.m. EDT

Overview

Response Deadline
May 24, 2021, 7:00 p.m. EDT (original: May 20, 2021, 7:00 p.m. EDT) Past Due
Posted
April 6, 2021, 9:17 a.m. EDT (updated: April 23, 2021, 2:35 p.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
Government Camp, OR 97028 United States
Source

Current SBA Size Standard
$19 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Odds of Award
84%
On 4/6/21 Forest Service issued Presolicitation 1240BH21R0014 for GAOA Timberline Lodge Boiler due 5/24/21. The opportunity was issued with a Small Business (SBA) set aside with NAICS 238220 (SBA Size Standard $19 Million) and PSC Z2FB.
Primary Contact
Name
Darcy J Rapoza   Profile
Phone
(541) 750-7116
Fax
(866) 230-8120

Documents

Posted documents for Presolicitation 1240BH21R0014

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Presolicitation 1240BH21R0014

Award Notifications

Agency published notification of awards for Presolicitation 1240BH21R0014

Contract Awards

Prime contracts awarded through Presolicitation 1240BH21R0014

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation 1240BH21R0014

Similar Active Opportunities

Open contract opportunities similar to Presolicitation 1240BH21R0014

Additional Details

Source Agency Hierarchy
AGRICULTURE, DEPARTMENT OF > FOREST SERVICE > MOUNT HOOD NATIONAL FOREST
FPDS Organization Code
12C2-0467
Source Organization Code
100165245
Last Updated
June 8, 2021
Last Updated By
darcy.rapoza@usda.gov
Archive Date
June 8, 2021