Search Contract Opportunities

FY26 Lake Marion Cameron Reach Water Lines   3

ID: W912HP26RA003 • Type: Solicitation • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
Does this solicitation list any subcontracting requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: Nov. 20, 2025, 4:10 p.m. EST
THE CAMERON REACH WATER MAIN CONTRACT CONSISTS OF THE FURNISHING, INSTALLING, AND PLACING INTO SUCCESSFUL OPERATION APPROXIMATELY 65,000 LF OF 12-INCH DIAMETER WATER MAIN PIPE, 1,000 LF OF 8-INCH DIAMETER WATER MAIN PIPE AND ALL ASSOCIATED WORK. THE CONTRACT INCLUDES ALL PIPE, VALVES, APPURTENANCES, ROADWAY BORES, HORIZONTALLY DIRECTIONALLY DRILLED PIPE, BACKFILL, COMPACTION, TESTING, QUALITY CONTROL, SAFETY, AND ALL OTHER RELATED WORK REQUIRED TO PLACE THE PROJECT INTO SUCCESSFUL OPERATION. THIS CONTRACT WILL BE A PORTION OF THE LAKE MARION REGIONAL WATER SYSTEM WITH PORTIONS OWNED, OPERATED, AND MAINTAINED BY BOTH SANTEE COOPER AND CALHOUN COUNTY. THE CONTRACTOR WILL BE RESPONSIBLE FOR COORDINATING WORK WITH LOCAL UTILITY OWNERS, PROPERTY OWNERS, LAKE MARION WATER TREATMENT PLANT PERSONNEL, AND CALHOUN COUNTY. THIS SOLICITATION IS HEREBY POSTED ON 24 OCTOBER 2025. THE PURPOSE OF THIS AMENDMENT 0001 IS TO PROVIDE An UPDATED CD02 PLAN SHEET. THIS AMENDMENT IS HEREBY POSTED AS OF 20 NOVEMBER 2025
Posted: Oct. 24, 2025, 3:35 p.m. EDT
Background
The Cameron Reach Water Main Contract is issued as part of the Lake Marion Regional Water System, which is owned, operated, and maintained by both Santee Cooper and Calhoun County. The goal of this contract is to enhance the water distribution infrastructure by installing significant lengths of water main pipe to ensure reliable service delivery.

Work Details
The contract encompasses the furnishing, installing, and placing into successful operation approximately 65,000 linear feet (LF) of 12-inch diameter water main pipe and 1,000 LF of 8-inch diameter water main pipe.

The scope includes all necessary components such as pipes, valves, appurtenances, roadway bores, horizontally directionally drilled pipe, backfill, compaction, testing, quality control, safety measures, and any other related work required for successful project completion.

The contractor will also be responsible for coordinating with local utility owners and property owners as well as personnel from the Lake Marion Water Treatment Plant and Calhoun County.

Period of Performance
The contractor shall begin performance within 30 calendar days after receiving the award and must complete it within 365 calendar days from the date of notice to proceed.

Place of Performance
The construction projects will be performed in the vicinity of Lake Marion Regional Water System.

Overview

Response Deadline
Nov. 24, 2025, 12:00 p.m. EST Past Due
Posted
Oct. 24, 2025, 3:35 p.m. EDT (updated: Nov. 20, 2025, 4:10 p.m. EST)
Set Aside
None
Place of Performance
SC 29403 USA
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Evaluation Criteria
Best Value
Est. Level of Competition
Average
Est. Value Range
Experimental
$12,000,000 - $18,000,000 (AI estimate)
Signs of Shaping
62% of similar contracts within the Department of the Army had a set-aside.
On 10/24/25 USACE Charleston District issued Solicitation W912HP26RA003 for FY26 Lake Marion Cameron Reach Water Lines due 11/24/25. The opportunity was issued full & open with NAICS 237110 and PSC Y1NE.
Primary Contact
Name
Evelyn HALLIBURTON   Profile
Phone
(843) 329-8208

Documents

Posted documents for Solicitation W912HP26RA003

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation W912HP26RA003

Award Notifications

Agency published notification of awards for Solicitation W912HP26RA003

Incumbent or Similar Awards

Contracts Similar to Solicitation W912HP26RA003

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912HP26RA003

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912HP26RA003

Experts for FY26 Lake Marion Cameron Reach Water Lines

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SAD > US ARMY ENGINEER DISTRICT CHARLESTO
FPDS Organization Code
2100-W912HP
Source Organization Code
500039401
Last Updated
Nov. 20, 2025
Last Updated By
evelyn.i.halliburton@usace.army.mil
Archive Date
Nov. 25, 2026