Search Contract Opportunities

Fort Pierce Beach Renourishment St. Lucie County, Florida   3

ID: W912EP25B0011 • Type: Solicitation

Description

Posted: Feb. 18, 2025, 7:15 a.m. EST

Project Description Project work includes construction of a beach berm along approximately 5,400 feet of shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-39. Beach compatible sand for the project will be dredged from Capron Shoal, located approximately four miles southeast of the project site in state waters. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the plans. A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty offloading area. Work also includes but is not limited to environmental species monitoring, sea turtle trawling (hopper dredges only), turbidity monitoring, beach tilling, beach fill quality control, screening, MEC construction support, and vibration control and monitoring.The Contractor shall be required to (a) commence work under this contract within 60 calendar days after the date the Contractor receives the Notice to Proceed (NTP) and be off the beach no later than 15 May 2025 for Area B and 30 May 2025 for Area A, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 June 2025. For clarification: - Area A is the area between the south jetty (pump off location) Florida Department of Environmental Protection (FDEP) Range monument R-34 to R-37 where our contractor will need to be off the beach by 30 May 2025. - Area B is south of R-37 where all beach fill activities will need be out of that area by 15 May 2025.A Pre-Bid Conference will be held virtually on Tuesday, December 31, 2024 at 10:00 AM, EST. Please utilize the link and call information provided below: Webex Link: https://usace1.webex.com/meet/nicole.m.batista-cruzAudio Teleconference: 1-844-800-2712Access code: 199 262 9798

Posted: Feb. 14, 2025, 3:57 p.m. EST
Posted: Jan. 22, 2025, 9:28 a.m. EST
Posted: Jan. 16, 2025, 1:24 p.m. EST
Posted: Dec. 31, 2024, 10:27 a.m. EST
Posted: Dec. 20, 2024, 1:34 p.m. EST
Background
The Fort Pierce Beach Renourishment project is initiated by the Jacksonville District and aims to construct a beach berm along approximately 5,400 feet of shoreline immediately south of Fort Pierce Inlet in St. Lucie County, Florida.

The project is part of the agency's mission to maintain and enhance coastal environments while ensuring public safety and ecological integrity.

Work Details
The project involves the construction of a beach berm using beach-compatible sand dredged from Capron Shoal, located approximately four miles southeast of the project site in state waters.

Key tasks include:
- Construction of a beach berm along the specified shoreline.
- Dredging sand from Capron Shoal.
- Offloading beach fill inside the South Jetty of Fort Pierce Inlet.
- Environmental species monitoring and sea turtle trawling (using hopper dredges only).
- Turbidity monitoring, beach tilling, and quality control for beach fill.
- Screening, MEC construction support, and vibration control and monitoring.
- A staging area and access to the beach placement area will be established at the end of Seaway Drive near the south jetty offloading area.

Period of Performance
The contractor must commence work within 60 calendar days after receiving the Notice to Proceed (NTP). All work must be completed by June 30, 2025, with specific deadlines for different areas: Area A must be vacated by May 30, 2025, while Area B must be vacated by May 15, 2025.

Place of Performance
The construction projects will take place along the shoreline immediately south of Fort Pierce Inlet between Florida Department of Environmental Protection (FDEP) Range Monuments R-34 and T-39 in St. Lucie County, Florida.

Overview

Response Deadline
Jan. 21, 2025, 1:00 p.m. EST Past Due
Posted
Dec. 20, 2024, 1:34 p.m. EST (updated: Feb. 18, 2025, 7:15 a.m. EST)
Set Aside
None
Place of Performance
Not Provided
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 12/20/24 USACE Jacksonville District issued Solicitation W912EP25B0011 for Fort Pierce Beach Renourishment St. Lucie County, Florida due 1/21/25. The opportunity was issued full & open with NAICS 237990 and PSC Z2KF.
Primary Contact
Name
NICOLE BATISTA-CRUZ   Profile
Phone
(904) 232-3275

Secondary Contact

Name
William Wallace   Profile
Phone
(904) 232-2180

Documents

Posted documents for Solicitation W912EP25B0011

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation W912EP25B0011

Incumbent or Similar Awards

Contracts Similar to Solicitation W912EP25B0011

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W912EP25B0011

Similar Active Opportunities

Open contract opportunities similar to Solicitation W912EP25B0011

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SAD > US ARMY ENGINEER DISTRICT JACKSONVI
FPDS Organization Code
2100-W912EP
Source Organization Code
100221797
Last Updated
Feb. 21, 2025
Last Updated By
nicole.m.batista-cruz@usace.army.mil
Archive Date
Feb. 21, 2025