Search Contract Opportunities

Fort Gibson Replace Spillway Bridge   5

ID: W912BV25RA017 • Type: Presolicitation • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Loading

Description

Pre-solicitation Notice

For

Fort Gibson Replace Spillway Bridge, Fort Gibson Lake, Oklahoma

This is a PRE-SOLICITATION NOTICE for the construction of the Fort Gibson Spillway Bridge, at Fort Gibson Lake, Oklahoma. TH IS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings.

The U.S. Army Corps of Engineers Tulsa has been tasked to solicit for and award a contract for the construction of the Fort Gibson Spillway Bridge, at Fort Gibson Lake, Oklahoma. The proposed design-bid-build project will be procured as an unrestricted, firm-fixed price contract in accordance with FAR 15, Negotiated Procurement, using the Best Value Tradeoff approach.

Project Description:

In general, this project consists of the following summarized components: of the existing bridge pedestals, girders, beams, deck, sidewalks, guardrails, electrical power/lighting systems, utilities, catwalk, pier walls down to EL. 583 (as shown on drawings) and all appurtenances as indicated on the drawings;

a. Design, construction, and establishment of temporary electrical service to provide uninterrupted operation of all existing Government facilities and structures for the duration of the contract. Temporary electrical power, for operation of existing Government equipment and facilities only (tainter gates, lights, sump pump, lake offices, etc.), will be provided from the Eufaula powerhouse and paid for by the Government. The Contractor shall provide, condition, and pay for all power/electrical service and all other utilities necessary for construction equipment and facilities.

b. Design and construction of safety walkways for uninterrupted Government personnel access to all existing tainter gate controls, power systems, and platforms. Minimum design and construction requirements shall be in accordance with OSHA and EM 385-1-1. Installed system shall be designed and constructed so that personal fall protection equipment is not required to utilize the walkways;

c. Construction of new bridge and appurtenances including, but not limited to, bridge pedestals, precast pretensioned girders, precast pretensioned deck panels, UHPC closure joints, haunches, and block outs using Ultra High-Performance Concrete (UHPC), sidewalks, parapets, bearing placement, installation of expansion joints, fabrication/installation of access ladders at piers and railings;

d. Construction of new electrical power/lighting systems;

e. Construction of new catwalks, self-supporting torque shafts, and appurtenances;

f. Construction of new waterline;

g. Provide an overhead hoist system to government for equipment removal on machinery platforms, located on the piers of the dam.

h. Perform repairs to the floating bulkhead.

i. Completely clean the construction area, remove all construction equipment, facilities, and debris from Government property, and restore disturbed areas to preconstruction conditions.

In accordance with FAR 36 and DFARS 236, the estimated magnitude of construction for this project is between $50,000,000 and $100,000,000.

The North American Industry Classification System code for this procurement is 237310 (Highway, Street, and Bridge Construction) which has a small business size standard of $45M.

Estimated duration of construction of this project is 850 calendar days.

Anticipated solicitation issuance date is on or about 3 July 2025, and the estimated proposal due date will be on or about 19 August 2025.

Overview

Response Deadline
None
Posted
June 18, 2025, 1:55 p.m. EDT
Set Aside
None
Place of Performance
Fort Gibson, OK United States
Source

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Evaluation Criteria
Best Value
Est. Level of Competition
Average
Odds of Award
88%
On 6/18/25 USACE Tulsa District issued Presolicitation W912BV25RA017 for Fort Gibson Replace Spillway Bridge. The opportunity was issued full & open with NAICS 237310 and PSC Y1LB.
Primary Contact
Name
Tyler Godwin   Profile
Phone
(918) 669-7281

Secondary Contact

Name
Dario Rissone   Profile
Phone
(775) 669-7109

Documents

Posted documents for Presolicitation W912BV25RA017

Opportunity Assistant


AI Analysis

Opportunity Lifecycle

Procurement notices related to Presolicitation W912BV25RA017

Award Notifications

Agency published notification of awards for Presolicitation W912BV25RA017

Contract Awards

Prime contracts awarded through Presolicitation W912BV25RA017

Incumbent or Similar Awards

Contracts Similar to Presolicitation W912BV25RA017

Potential Bidders and Partners

Awardees that have won contracts similar to Presolicitation W912BV25RA017

Similar Active Opportunities

Open contract opportunities similar to Presolicitation W912BV25RA017

Experts for Fort Gibson Replace Spillway Bridge

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SWD > US ARMY ENGINEER DISTRICT TULSA
FPDS Organization Code
2100-W912BV
Source Organization Code
100221322
Last Updated
July 4, 2025
Last Updated By
tyler.l.godwin@usace.army.mil
Archive Date
July 3, 2025