Exchanges with Industry Before Receipt of Proposals - Fire Island Inlet to Montauk Point (FIMP) Nonstructural Pilot Project   2

ID: W912DS26S0007 • Type: Special Notice • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Loading

Description

See Attachment

Background
The FIMP Contract 6b Pilot Project is initiated by the US Army Corps of Engineers, New York District, aimed at flood mitigation through nonstructural home elevation. The project focuses on elevating up to 66 structures to the Design Flood Elevation (DFE) as defined by FEMA and New York State requirements. This initiative seeks to significantly reduce the risk of flooding for participating homeowners while ensuring compliance with local, state, and federal laws.

Work Details
The scope of work encompasses design, homeowner meetings, and construction tasks including: disconnecting utilities; excavating around building footprints; evenly jacking up structures with appropriate cribbing/supports; installing new foundation elements; installing new floors where applicable (e.g., slab separation); lowering houses and securing them to new foundations; reconnecting utilities; and conducting post-construction activities.

Floodproofing measures may include filling basements, protecting utilities, and raising air conditioning units or louvers as necessary. The project aims to elevate homes to the DFE, which is set at the 1% Annual Exceedance Probability flood elevation plus 2 feet of freeboard and an additional 18 inches per New York State regulations. Homes will be screened for structural integrity and potential hazards such as lead or asbestos prior to participation. Homeowners must vacate properties during construction until final Certificates of Occupancy are issued.

Period of Performance
The period of performance is estimated at 740 days from Notice to Proceed (NTP) to project closeout, based on assumptions regarding crew numbers and initial home counts.

Place of Performance
The construction projects will take place in the Towns of Babylon and Brookhaven, New York.

Overview

Response Deadline
Dec. 19, 2025, 2:00 p.m. EST Past Due
Posted
Dec. 4, 2025, 9:01 a.m. EST (updated: Dec. 16, 2025, 10:58 a.m. EST)
Set Aside
None
Place of Performance
Montauk, NY 11954 United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Value Range
Experimental
$20,000,000 - $40,000,000 (AI estimate)
On 12/4/25 USACE New York District issued Special Notice W912DS26S0007 for Exchanges with Industry Before Receipt of Proposals - Fire Island Inlet to Montauk Point (FIMP) Nonstructural Pilot Project due 12/19/25.
Primary Contact
Name
Michael McCue   Profile
Phone
None

Documents

Posted documents for Special Notice W912DS26S0007

Opportunity Assistant

Opportunity Lifecycle

Procurement notices related to Special Notice W912DS26S0007

Incumbent or Similar Awards

Contracts Similar to Special Notice W912DS26S0007

Potential Bidders and Partners

Awardees that have won contracts similar to Special Notice W912DS26S0007

Similar Active Opportunities

Open contract opportunities similar to Special Notice W912DS26S0007

Experts for Exchanges with Industry Before Receipt of Proposals - Fire Island Inlet to Montauk Point (FIMP) Nonstructural Pilot Project

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > NAD > W2SD ENDIST NEW YORK
FPDS Organization Code
2100-W912DS
Source Organization Code
100221392
Last Updated
Jan. 3, 2026
Last Updated By
michael.l.mccue@usace.army.mil
Archive Date
Jan. 3, 2026