Search Contract Opportunities

East Bear Creek Pumping Plant and Pipeline Moderni

ID: 140RR027R0017 • Notice Type: Sources Sought • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Analyze Opportunity
Generate a Draft
Loading

Description

Background
The Department of the Interior (DOI), specifically the Bureau of Reclamation (BOR), is seeking to modernize the East Bear Creek Pumping Plant and Pipeline. This project aims to enhance water supply facilities within the California–Great Basin Region, focusing on improving infrastructure to support environmental and operational needs.

Work Details
The project involves several key construction tasks including:

1. Upgrades to electrical and controls components at the pumping plant site.
2. Replacement of manual operators of existing butterfly valves, installation of butterfly valve position transmitters, and modification of pump discharge piping.
3. Furnishing and installing one fish screen.
4. Construction of a sheet pile wall.
5. Installation of a pipeline.
6. Development of an access road.
7. Provision of earth fill at designated sites, including a regulating tank site where controls components will also be replaced.

Period of Performance
The anticipated construction period is approximately 560 calendar days from the Notice to Proceed.

Place of Performance
The work will be performed approximately 12 miles east of Gustine, CA, in Merced County at two sites located on the San Luis National Wildlife Refuge.

Bidder Requirements
Contractors must demonstrate capability through relevant past performance on similar projects within the last five years, including details such as project title, contract number, scope, contract amounts, and roles in previous contracts. Additionally, bidders should provide business information including company name, address, Cage Code, Unique Entity Identifier (UEI), and socioeconomic status.
Install new Fish Screen, Sheet Pile Wall, Pipeline, Access Road, Butterfly Valves, and Modify Pumping Plant Discharge and Electrical Systems.
Please email Charlesetta Seibure and Stephanie Lindner at charlesetta_seibure@ios.doi.gov and stephanie_lindner@ios.doi.gov to request copies of the draft specifications and drawings.
Loading Map
Loading Map

Overview

Response Deadline
Due in 3 Days
Posted Date
Set Aside
None
Place of Performance
CA USA
Source

Estimated Contract Value
$5,000,000 - $10,000,000 (value based on agency estimated range)
Pricing Structure
Likely Fixed Price
Estimated Competition Level
Low
Odds of Advancing to Solicitation
37%
Current SBA Size Standard
$45 Million
Vehicle Type
Indefinite Delivery Contract
On 11/3/26 Interior Business Center issued Sources Sought 140RR027R0017 for East Bear Creek Pumping Plant and Pipeline Moderni due 11/18/26. The opportunity was issued full & open with NAICS 237990 and PSC Y1KA.
Primary Contact
Name
Seibure, Charlesetta   Profile
Phone
(916) 978-5456

Additional Contacts in Documents

Title Name Email Phone
None Charlesetta Seibure Profile charlesetta_seibure@ios.doi.gov None

Documents

Posted documents for Sources Sought 140RR027R0017

Opportunity Assistant


Analyze Opportunity

Generate a Draft

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought 140RR027R0017

Similar Active Opportunities

Open contract opportunities similar to Sources Sought 140RR027R0017

Experts for East Bear Creek Pumping Plant and Pipeline Moderni

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
INTERIOR, DEPARTMENT OF THE > DEPARTMENTAL OFFICES > RECLAMATION CONTRACTING ACTIVITY
FPDS Organization Code
1406-140RR0
Source Organization Code
500209486
Last Updated
Last Updated By
fbms_acq@ios.doi.gov
Archive Date