Posted: May 9, 2023, 1:39 p.m. EDT
***AMENDMENT 0007*****
The purpose of this amendment is to revise/reissue specs.
*********************************************************************
***AMENDMENT 0006*****
The purpose of this amendment is to extend the propsal due date. Proposals for Phase 2 are due 18 May 23 by 2:00p.m. CST.
Only those firms whom were notifed of their inclusion in Phase 2 are authorized to submit Phase 2 proposals.
******************************************************************************************
***AMENDMENT 0005*****
The purpose of this amendment is to revise/reissue Specs and reissue Drawings - site plan
*************************************************************
***AMENDMENT 0004*****
The purpose of this amendment is to reissue Specs., revise Appendix H & I, and share INFORMATION ONLY Civil CADD.
The Revit Files that are for INFORMATION ONLY will be sent via Dod SAFE..
**********************************************************************
***AMENDMENT 0003*****
The purpose of this amendment is to add the site visit inf ormation and the justification and approval for the use of name brand generators
and fire alarm panels.
*******************************************************************
***AMENDMENT 0002*****
The purpose of this amendment is to start Phase 2 and the duration of this project w ill be 910 days. Only those firms w hom w ere notifed of their inclusion in Phase 2 are authorized to submit Phase 2 proposals. Proposals will be due 11 May 23 by 2:00 p.m.CST.
*******************************************************************************
***AMENDMENT 0001***
Phase 1 proposals are extended until 10 Jan 2023 and I have uploaded attachments 3, 6, & 7.
***********************************************************************************
This office hereby issues Request for Proposal (RFP) for DRP Formal Training Unit Bidg. 631.
The solicitation will close 30 December 2022.
This solicitation is UNRESTRICTED.
All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtaininformation about the SAM program. Contractors must ensure that the applicable NAICS code 236220 is included in their profile prior to submission of offer.
SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION:
Please be advised of on-line registration requirements for Contractor Registration and for Representations and Certifications Application which are now located in System for Award Management SAM' database athttps://sam.gov/. The representations and certifications section in SAM are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from the date of initial submission and expire on an annual basis from the update to SAM.
The construction cost of magnitude of this project is between $25,000,000 and $100,000,000.
Obtaining Solicitation Documents:
Solicitation documents will be posted to the web via Contract Opportunities (SAM.gov > Contract Opportunities) at https://sam.gov/. Find solicitation announcement in Contract Opportunities (https://sam.gov/content/opportunities):
1. Use the Search Contract Opportunities search function to locate the project (by entering the solicitation number) or use the advanced search features offered or use the Federal Organizations search feature followed by the Advanced Search feature.
2. By using the Sign In feature, it allows additional search features and allows you to keep your searches. Sign In might be required on some solicitations that are considered restricted.
3. Once you have located your project, click on hyperlinked title of the solicitation to view the project. Files may be downloaded from the Attachments/Links section of the solicitation. Questions should be sent to the Contract Specialist, Ms. Michele Renkema, at michele.a.renkema@usace.army.mil, and the Contracting Officer, Ms. Amanda E. Eaton, at amanda.e.eaton@usace.army.mil.
INQUIRIES:
A bidder inquiry key will be included in the solicitation. Questions regarding the solicitation will be submitted via Bidder Inquiry in ProjNet at: https://www.projnet.org/projnet/.
Telephone calls will not be accepted.
Posted: May 4, 2023, 3:12 p.m. EDT
Posted: May 3, 2023, 3:09 p.m. EDT
Posted: April 19, 2023, 7:07 p.m. EDT
Posted: April 4, 2023, 2:56 p.m. EDT
Posted: March 27, 2023, 6:52 p.m. EDT
Posted: Dec. 8, 2022, 2:24 p.m. EST
Posted: Nov. 30, 2022, 3:21 p.m. EST
Background
The solicitation is for the DRP Formal Training Unit Bldg. 631. The purpose of the contract is to renovate and construct the Disaster Resiliency Program (DRP) Formal Training Unit Bldg. 631, Grand Forks, North Dakota. The project also includes all necessary site work, utilities, pavements, and passive barriers. The construction cost of magnitude of this project is between $25,000,000 and $100,000,000. The solicitation will close on 30 December 2022. This solicitation is UNRESTRICTED.
Work Details
The project scope includes renovating Building 631 located on Grand Forks AFB, ND for use as a Formal Training Unit (FTU). The existing two-story building is approximately 40,000 SF and constructed with a reinforced concrete foundation, structural steel frame, steel stud walls with exterior insulation finish system (EIFS), and standing seam metal roof system. The facility will be designed and constructed to meet DoD requirements and security protocols for Special Access Programs (SAP). Project includes raised access flooring, security sensors, alarms, cybersecurity measures.
Upgrade of the electrical capacity will include running of a new feeder line to the DRP complex area. Interior electrical system will be completely redone and will include design and installation of an exterior generator. Project includes upgrade of communications capacity to include design and construction of a communication hut that will serve this building as well as rest to the Disaster Resiliency Program (DRP) complex. The renovated building will have existing telecommunications removed and redone.
Interior mechanical system(s) will be completely removed and redone. Process will include performing a minimum of three life cycle cost analysis of proposed systems. Existing mechanical room location will remain in the same location and occupies both stories of the building. Modifications of the plumbing system will need to be designed and constructed to accommodate new restrooms, showers, and break areas’ plumbing. Existing fire protection system will need to be modified to accommodate new layout and will include clean agent suppression systems.
Period of Performance
The duration of this project w ill be 910 days.
Place of Performance
The geographic location(s) where the construction projects will be performed is Grand Forks AFB, ND.