Draft RFP - GBSD Integrated Command Center, FE Warren AFB   11

ID: W9128F23R0022 • Type: Special Notice
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Solicitation Number: W9128F23R0022

Draft Request for Proposal (RFP): The Government is seeking questions, comments, suggestions, and corrections to improve the draft solicitation for this procurement. Potential Offerors may exchange as much information about internal business practices or potential solutions to the Army on a confidential basis. The Draft RFP is not a formal solicitation; it is a mechanism for potential Offerors to comment on all aspects of the Draft RFP and identify unnecessary or inefficient requirements. Information Offerors need to prepare its proposal, however, will be disclosed to all potential Offerors at the earliest possible opportunity. All feedback provided by industry on this draft RFP shall be provided at no charge to the government. Offerors should not expect a Government response to feedback provided, instead any feedback will be reviewed and incorporated into the final RFP, at the Government's discretion

The Government emphasizes that this is not a request for competitive proposals. This is a Draft RFP announcement only. No evaluation letters and/or results will be issued to the respondents. Solicitation requests will not be acknowledged. USACE Omaha is not seeking or accepting unsolicited proposals, and USACE Omaha will not accept telephone inquiries. The final RFP may be different from the Draft RFP.

Magnitude of Construction: Disclosure of the magnitud eof construction, as prescribed in FAR 36.204 and DFARS 26.204, is between $100M and $250M.

Project Period of Performance: 900 calendar days from construction NTP.

DRAFT Evaluation Documents: In order to facilitate fruitful exchange with industry, draft solicitation documents are being provided for review:

  • Draft contracting front end.
  • Draft Source Selection Evaluation Criteria (00 22 00)
  • Technical Specifications
  • Technical Drawings (Need to email POC for file to be sent via DoD SAFE)

Please submit your responses to th draft RFP no later that 2:00PM (CST), 30 March 2022 to Scott Dwyer at Scott.Dwyer@usace.army.mil, and copy Amanda Eaton at Amanda.E.Eaton@usace.army.mil

Background
The U.S. Army Corps of Engineers (USACE) Omaha District is issuing a Draft Request for Proposal (RFP) for the construction of an Integrated Command Center (ICC) at F.E. Warren Air Force Base in Cheyenne, Wyoming.

This project aims to support the Ground Based Strategic Deterrent (GBSD) Intercontinental Ballistic Missile mission and is part of the agency's broader mission to enhance national security through military construction projects.

The estimated magnitude of construction is between $100 million and $250 million.

Work Details
The scope of work includes:
1. Construction of the ICC Building as per RFP drawings and specifications, complete to the five-foot line, excluding separately listed items.
2. Construction of HEMP Shielding, including steel structure, inspection platform, secure lid, waveguides, acceptance & testing.
3. Sitework including utilities and pavements from the five-foot line to limits of construction, including all required site demolition.
4. Environmental remediation of contaminated soil or groundwater, including temporary sheet piling, soil testing & dewatering.
5. Cybersecurity documentation and alterations to commercial equipment to meet cybersecurity requirements.
6. Procurement and installation of Furniture, Fixtures & Equipment (FF&E).
7. Procurement and installation of UPS Equipment.
8. Procurement and installation of LCD Displays and VTC Conference Rooms.
9. Procurement and installation of Electronic Security Equipment including access control systems and CCTV systems.
10. Procurement and installation of all Communications & IT Equipment.
11. Excavation & transportation of contaminated soil off-site to an approved landfill.
12. Additional filtration for removal of groundwater contaminants.

Period of Performance
The period of performance for this contract is 900 calendar days from the Notice to Proceed (NTP).

Place of Performance
The construction projects will be performed at F.E. Warren Air Force Base in Cheyenne, Wyoming.

Overview

Response Deadline
March 30, 2023, 3:00 p.m. EDT Past Due
Posted
March 15, 2023, 3:37 p.m. EDT
Set Aside
None
Place of Performance
WY 82001 USA
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Multiple Types Common
On 3/15/23 USACE Omaha District issued Special Notice W9128F23R0022 for Draft RFP - GBSD Integrated Command Center, FE Warren AFB due 3/30/23.
Primary Contact
Name
Scott Dwyer   Profile
Phone
None

Secondary Contact

Name
Amanda Eaton   Profile
Phone
None

Documents

Posted documents for Special Notice W9128F23R0022

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Special Notice W9128F23R0022

Award Notifications

Agency published notification of awards for Special Notice W9128F23R0022

Contract Awards

Prime contracts awarded through Special Notice W9128F23R0022

Incumbent or Similar Awards

Contracts Similar to Special Notice W9128F23R0022

Potential Bidders and Partners

Awardees that have won contracts similar to Special Notice W9128F23R0022

Similar Active Opportunities

Open contract opportunities similar to Special Notice W9128F23R0022

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > NWD > W071 ENDIST OMAHA
FPDS Organization Code
2100-W9128F
Source Organization Code
100255233
Last Updated
April 14, 2023
Last Updated By
scott.dwyer@usace.army.mil
Archive Date
April 15, 2023