Search Contract Opportunities

DOT - Motor Vehicle Systems Cost, Weight, Lead Time Analysis - MRAS

ID: RFI1820398 • Alt ID: RFI1820387, RFI1820388, RFI1820389, RFI1820393, RFI1820395, RFI1820397, R_GQQHGpwPk7MXemZ • Type: Sources Sought • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Analyze Opportunity
Generate a Draft
Loading

Description

```html

The Department of Transportation (DOT), through the General Services Administration (GSA), is conducting market research to gather insights into capabilities related to a specific requirement. This initiative is spearheaded by the National Highway Traffic Safety Administration (NHTSA) and focuses on evaluating motor vehicle safety regulations. The overarching goal of this effort is to assess the effectiveness, benefits, and costs associated with proposed and existing safety features in motor vehicles. By understanding these elements, NHTSA aims to enhance motor vehicle safety in accordance with the National Traffic and Motor Vehicle Safety Act of 1966.

The procurement seeks expertise in conducting cost studies of motor vehicle equipment and performing detailed engineering teardown analyses. The contractor will be responsible for providing definitive cost and weight estimates for various motor vehicle components. These analyses are crucial for NHTSA as they form the basis for evaluating costs, weights, lead time impacts of proposed initiatives, and compliance with performance requirements set by existing regulations.

The scope of work involves several key tasks that contractors must fulfill. Initially, contractors will conduct project briefings with NHTSA personnel to align on objectives and methodologies. Subsequently, they will perform comprehensive vehicle systems analysis across a range of vehicles including passenger cars, light trucks, medium/heavy trucks, motorcycles, school buses, among others. This analysis extends to specific safety systems such as child restraints or motorcycle helmets.

Furthermore, contractors are required to develop sampling plans for teardown cost analysis that encompass a variety of designs and manufacturers. This includes both foreign and domestic manufacturers across different market classes and sizes. The contractor must acquire motor vehicle equipment from diverse sources ensuring it reflects original manufacturing conditions. Ultimately, this work supports NHTSA's mission to ensure that regulatory measures effectively enhance vehicular safety while considering cost implications.

```

Overview

Response Deadline
Past Due
Posted
Set Aside
None
Place of Performance
FEDERAL ACQUISITION SERVICE Boston, MA 02222
Source
HigherGov Research

Current SBA Size Standard
$19 Million
Est. Level of Competition
Low
Est. Value Range
Experimental
$150,000 - $750,000 (AI estimate)
Odds of Advancing to Solicitation
22%
On 6/28/26 Department of Transportation issued Sources Sought RFI1820398 for DOT - Motor Vehicle Systems Cost, Weight, Lead Time Analysis - MRAS due 7/29/26. The opportunity was issued full & open with NAICS 541690 and PSC R499.

Documents

Posted documents for Sources Sought RFI1820398

Opportunity Assistant


Analyze Opportunity

Generate a Draft

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought RFI1820398

Similar Active Opportunities

Open contract opportunities similar to Sources Sought RFI1820398

Experts for DOT - Motor Vehicle Systems Cost, Weight, Lead Time Analysis - MRAS

Recommended subject matter experts available for hire