Search Contract Opportunities

DIRECT TO PHASE II: Innovative Flexible Fuel Cell Design

ID: DON26BZ05-DV084 • Notice Type: SBIR / STTR Topic • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Analyze Opportunity
Loading

Description


TECHNICAL POINT OF CONTACT (TPOC)
Nathan Tenney
Gabrielle Ball
PROJECTED CMMC LEVEL REQUIREMENT
Level 2 (Self)
TECHNOLOGY AREAS
None
MODERNIZATION PRIORITIES
Sustainment & Logistics
KEYWORDS
Fuel Cell; Fuel Bladder; MIL-DTL-27422; Crashworthy; Manufacturing; Flexible
OBJECTIVE
Develop and evaluate innovative fuel cell materials and processes to produce Class A, Type I crashworthy self-sealing fuel cells compliant with MIL-DTL-27422F.
DESCRIPTION
The Department of the Navy (DON) is seeking flexible fuel cell construction solutions that will meet MIL-DTL-27422F requirements for Class A Type I fuel cells. The DON is seeking advanced manufacturing processes, procedures, materials and technology that contribute to the fast production of fuel cells (weeks not months) while having low defects, reworks, and maintaining flexibility and quality.
Modern manufacturing processes and techniques shall be used to ensure the fuel cell remains lightweight, pliable, and foldable to facilitate installation into airframe structural cavities while providing sufficient performance to withstand crash impact loads at velocities of 65 feet per second. The self-sealing solution shall be capable of operating at temperatures down to -40 F and pressures of 1.5 psi.
Work produced in Phase II may become classified. Note: The prospective contractor(s) must be U.S. owned and operated with no foreign influence as defined by 32 U.S.C. 2004.20 et seq., National Industrial Security Program Executive Agent and Operating Manual, unless acceptable mitigating procedures can and have been implemented and approved by the Defense Counterintelligence and Security Agency (DCSA) formerly Defense Security Service (DSS). The selected contractor and/or subcontractor must be able to acquire and maintain a secret level facility and Personnel Security Clearances. This will allow contractor personnel to perform on advanced phases of this project as set forth by DCSA and NAVAIR in order to gain access to classified information pertaining to the national defense of the United States and its allies; this will be an inherent requirement. The selected company will be required to safeguard classified material during the advanced phases of this contract IAW the National Industrial Security Program Operating Manual (NISPOM), which can be found at Title 32, Part 2004.20 of the Code of Federal Regulations.
PHASE I
For a Direct to Phase II topic, the Government expects that the small business would have accomplished the following in a Phase I-type effort and developed a concept for a workable prototype or design to address, at a minimum, the basic requirements of the stated objective above. The below actions are required to satisfy the requirements of Phase I:
Availability of material level-data and defined proof of concept for fuel cell construction designs and/or applications validating the concept.
FEASIBILITY DOCUMENTATION: Offerors interested in participating in Direct to Phase II must include in their response to this topic Phase I feasibility documentation that substantiates the scientific and technical merit and Phase I feasibility described in Phase I above has been met (i.e., the small business must have performed Phase I-type research and development related to the topic NOT solely based on work performed under prior or ongoing federally funded SBIR/STTR work) and describe the potential commercialization applications. The documentation provided must validate that the proposer has completed development of technology as stated in Phase I above.
PHASE II
The Phase II approach shall align with qualification activities outlined in MIL-DTL-27422F, prioritizing crash impact, performance, gunfire performance, and flexibility evaluations. Material coupons, panels, and cube(s) shall be produced. Testing shall be performed to demonstrate and validate that the technology, materials, and processes meet the requirements defined in MIL-DTL-27422.
Work in Phase II may become classified. Please see note in Description paragraph.
PHASE III DUAL USE APPLICATIONS
Scale up the technology to produce aircraft-representative articles and validate compliance with MIL-DTL-27422F testing for a rotary platform.
Technology developed under this topic can be applied to joint services, as well as foreign Military Sales, and could be implemented into commercial aircraft as well. FAA requirements are less stringent than military requirements, therefore providing a safer product that could be implemented into commercial applications.
REFERENCES
MIL-DTL-27422F, DETAIL SPECIFICATION: TANK, FUEL, CRASH-RESISTANT, BALLISTIC-TOLERANT, AIRCRAFT (06-FEB-2014). https://everyspec.com/MIL-SPECS/MIL-SPECS-MIL-DTL/MIL-DTL-27422F_49706/
National Industrial Security Program Executive Agent and Operating Manual (NISP), 32 U.S.C. 2004.20 et seq. 1993 . https://www.ecfr.gov/current/title-32/subtitle-B/chapter-XX/part-2004
MIL-STD-801E, DEPARTMENT OF DEFENSE TEST METHOD STANDARD (10-AUG-2017), INSPECTION AND ACCEPTANCE STANDARDS FOR FLEXIBLE FUEL CELLS AND FITTINGS. https://everyspec.com/MIL-STD/MIL-STD-0800-0899/MIL-STD-801E_55757/
QUESTIONS & ANSWERS
NOTE:
To ask a question, you must
log in or create an account
for the DSIP.

Overview

Response Deadline
Past Due
Posted Date
Open
Set Aside
Small Business (SBA)
Place of Performance
Not Provided
Source
Alt Source

Program
SBIR Phase II
Structure
Contract
Phase Detail
Phase II: Continue the R/R&D efforts initiated in Phase I. Funding is based on the results achieved in Phase I and the scientific and technical merit and commercial potential of the project proposed in Phase II. Typically, only Phase I awardees are eligible for a Phase II award
Duration
2 Years
Size Limit
500 Employees
On 8/6/26 Department of the Navy issued SBIR / STTR Topic DON26BZ05-DV084 for DIRECT TO PHASE II: Innovative Flexible Fuel Cell Design due 9/23/26.

Documents

Posted documents for SBIR / STTR Topic DON26BZ05-DV084

Opportunity Assistant


Analyze Opportunity

Contract Awards

Prime contracts awarded through SBIR / STTR Topic DON26BZ05-DV084

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to SBIR / STTR Topic DON26BZ05-DV084

Similar Active Opportunities

Open contract opportunities similar to SBIR / STTR Topic DON26BZ05-DV084

Experts for DIRECT TO PHASE II: Innovative Flexible Fuel Cell Design

Recommended subject matter experts available for hire