Search Contract Opportunities

Design/Build Construction Multiple Award Task Order Contract (MATOC) Pantex Plant, Amarillo, Texas

ID: MATOC23 • Type: Sources Sought

Description

Posted: Sept. 14, 2023, 6:49 a.m. EDT

Introduction & Background:
The Pantex plant is located just east of Amarillo, Texas. It is a Department of Energy (DOE) National Nuclear Security Administration (NNSA) national security site, managed and operated by Consolidated Nuclear Security, LLC (CNS). Due to continued mission growth and the aging infrastructure at Pantex, there is a need to expand and replace a number of office/administration buildings, light labs, and warehouse over the next 5 to 10 years. The buildings will utilize repeatable designs to gain cost and schedule efficiencies. CNS is seeking interested parties with a minimum of ten (10) years of design build construction experience for a Multiple Award Task Order Contract (MATOC) for design and construction of standardized office, laboratory, and warehouse space here at the Pantex plant. The total not to exceed funding for the MATOC will be $300 million for the five-year base, and an additional $60 million per year for each of the remaining option years (5 one-year options) for a total of $600 million. In addition, the successful parties shall have experience working in a secured area such as Secured government facilities, or state and municipality areas that are secured as well. However, Security Clearances are not required. The MATOC tasks will be awarded a specific facility with firm-fixed price tasks for each facility as follows:

  • Task 1: Develop standard Pantex design (structural and shell) maximizing off-site fabrication, develop site adapt design packages for utility connections, provide 30% conceptual building design, provide 100% civil and structural design, and define long lead equipment and specifications.
  • Task 2: Procure long lead equipment and initiate shell construction (including civil work, slab, in-slab utilities, and walls).
  • Task 3: Complete finial design and issued for construction (IFC) drawings
  • Task 4: Complete full facility construction.

Please Note: Each building will be competitively sourced between the MATOC awardees based on task 1. Subsequent tasks 2 through 4 will be awarded to the successful offeror on task 1. Therefore, offerors must provide open book pricing on tasks 2 through 4 for evaluation.

General Scope Description:
The offeror will design and build a facility as per the scope of the issued task. These commercial / non-hazardous facilities will consist of office/administrative facilities, light laboratories, and warehouses. The anticipated square footage of the laboratories and office/administrative facilities will be between 12,000 sq foot and 15,000 sq foot. The warehouse size will depend on needs and available budget up to 30,000 sq foot. The intent is to design a standard for each type of facility (where applicable), and utilize that design throughout the life of the agreement. In addition, CNS anticipates building numerous buildings clustered in different areas of the plant. Therefore, periodic tasks for the utility corridors that will serve these clusters maybe issued.

You are invited to attend the Pantex Design Build BOA MATOC/SATOC Industry Day scheduled Thursday September 21, 2023. This conference is located at the Amarillo College West Campus, Building A, Room 109 (WCA 109) and Room 108 (WCA 108) 6222 SW 9th Ave, Amarillo Tx 79106. Directions from the airport can be found in the attachments,.

Originally this was planned to be held at the Pantex plant but due to the number of requests we have moved the venue off site to prevent issues with badging and site access. Badging will no longer be required, when the actual solicitation is issued there will be a new site visit scheduled.

Agenda:
8am -12pm One on One prescheduled sessions by request
12pm -1pm Open hour
1pm - 3pm Industry Day Conference
3pm 4pm Questions & open discussion

CNS will hold 20 minute long 1 on 1 sessions with any group that requests to visit on a first come, first serve basis. This will be planned form 8am to 12pm and there will be 12 available slots. If you are interested in scheduling a 1 on 1 please contact James Carducci at james.carducci@pxy12.doe.gov to get your slot scheduled.

Expressions of interest and capability statements will be due on September 19, 2023. A draft RFP and SOW for the MATOC will be available for review by 9/28/2023. The final RFP is planned to be issued by 10/23/2023. Forty-five calendar days will be given for review and proposal preparation making bids due around December 1, 2023. Finally, CNS plans on awarding MATOC agreements to the successful offerors February 1, 2024. CNS Pantex plans to issue the initial task within 30 days after award of the MATOC agreements.

List of Possible Buildings to be Built under MATOC Agreement
Please note: The list below is subject to change due to funding, plant needs, and market conditions. The scopes for these buildings will be developed as needed. The Gas Analysis Laboratory and the Environmental Sampling Facility scopes of work are currently in development. It is CNS's plan to issue proposal requests for these two facilities early in calendar year 2024.

Building Projects

  • Planned FY Completion 2026
    • Environmental Sampling Facility - 10,000 sq. ft
  • Planned FY Completion 2027
    • Gas Analysis Laboratory - 11,000 sq.ft
    • Environmental Support Facility (PSC1) - 20,000 sq. ft.
  • Planned FY Completion 2028
    • Zone 4 West MGT Support Facility - 11,000 sq. ft.
  • Planned FY Completion 2029
    • Component Storage Warehouse 1 - 25,000 sq. ft.
    • Project Support Building (PSC2) - 20,000 sq. ft.
  • Planned FY Completion 2030
    • Support Building 1 (PSC3) - 20,000 sq. ft.
    • Component Warehouse Storage - 1 - 25,000 sq. ft.
  • Planned FY Completion 2031
    • Component & Property Storage Facility - 16,000 sq. ft.
    • Zone 12 Maintenance Facility - 14,000 sq. ft.
    • Support Facility -2 (PSC5) - 20,000 sq. ft.
  • Planned FY Completion 2032
    • Common Area Building (PSC4) - 20,000 sq. ft.
    • Storage and Processing Facility - 20,000 sq. ft.
  • Planned FY Completion 2033
    • Change House - 11,200 sq. ft.
    • Development, Evaluation and Test Facility - 15,000 sq. ft.
Posted: Sept. 5, 2023, 3:14 p.m. EDT

Overview

Response Deadline
Dec. 1, 2023, 6:00 p.m. EST Past Due
Posted
Sept. 5, 2023, 3:14 p.m. EDT (updated: Sept. 14, 2023, 6:49 a.m. EDT)
Set Aside
None
PSC
None
Place of Performance
Amarillo, TX United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Est. Level of Competition
Average
Odds of Award
19%
Vehicle Type
Indefinite Delivery Contract
On 9/5/23 Department of Energy issued Sources Sought MATOC23 for Design/Build Construction Multiple Award Task Order Contract (MATOC) Pantex Plant, Amarillo, Texas due 12/1/23. The opportunity was issued full & open with NAICS 236210.
Primary Contact
Name
James Carducci   Profile
Phone
(806) 573-6109

Secondary Contact

Name
Marvin Moreland   Profile
Phone
(806) 573-6634

Documents

Posted documents for Sources Sought MATOC23

Question & Answer

Incumbent or Similar Awards

Contracts Similar to Sources Sought MATOC23

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought MATOC23

Similar Active Opportunities

Open contract opportunities similar to Sources Sought MATOC23

Additional Details

Source Agency Hierarchy
ENERGY, DEPARTMENT OF > ENERGY, DEPARTMENT OF > CNS - DOE CONTRACTOR
FPDS Organization Code
8900-899013
Source Organization Code
500048691
Last Updated
Dec. 1, 2023
Last Updated By
greta.ownby@cns.doe.gov
Archive Date
Dec. 1, 2023