Design and Construction of Zone 3 - WEG HQ, Maintenace Hangar, and Apron Facilities, Tyndall Air Force Base, FL   3

ID: W9127820R0028 • Type: Solicitation
HigherGov Subscribers Knew about This Opportunity Months Early

Find opportunities months or years earlier with HigherGov Forecasts

Free Trial Schedule Demo

Description

This project is for the design and construction of two separate facilities: WEG HQ and WEG Maintenance Hangar and Apron Facilities.

WEG HQ: The 53rd WEG HQ facility consists of one consolidated facility. The Combined Group Headquarters, 894.84 SM = 9,605 SF, Squadron Operations, 3,657 SM = 39,252SF; and an Emergency Ops Center, 2,452 SM = 26,318 SF. The combined Weapons Evaluation Group (WEG) Headquarters, constituent Squadron Operations facility and emergency Operations Center included both SCIF and SAPF areas. This multi-story facility provides a consolidated facility with administrative areas for the 53d TSS, 53d WEG, and 83d Squadron Operations staff. The administrative areas will be supported by conferencing, meeting, and other special spaces. In addition to the admin areas, the squadron operations will provide mission planning, SAPF workspace, briefing, storage, and vault space. The project includes all utilities, site improvements, special foundations, pavements, detection/protection features, security enhancements, and other supporting work.

WEG Maintenance Hangar: The 53rd Weapons Evaluation Group (WEG) Hangar facility is consolidated with the WEG HQ and includes; Maintenance Hangar, 8,816 SM = 94,898 SF; Armament Research Testing, 150 SM = 1,610 SF; Aircraft Maintenance Shop, 1,434 SM = 15,434 SF; Aircraft Corrosion Control: 855 SM = 9,200 SF, and a Fuel Systems Maintenance Dock, 1,243 SM = 13,380 SF.

The Aircraft Maintenance Hangar and Maintenance Shop is for the QR/F-16 and E-9 Aircraft. The QF-16 Maintenance Hangar provides space for aircraft maintenance, tool rooms, aircraft weighing and other maintenance and inspection activities. Hangars support aircraft maintenance, repair, and inspection activities that are most efficiently done under complete cover. The QF-16 Maintenance Hangar will include 12 hangar bays for the QF-16 aircraft and building support facilities. The hangar bays will have a HEF system, 10-ton crane, large fan for ventilation per 6 bays. This project will require compliance with Intelligence Community Directive (ICD) 705 for the SCIF and SAPF areas.

The Armament/AGGTS/Lab is an Armament Research Testing facility attached to the Maintenance Hangar. This facility will accommodate the research, development, fabrication and testing of non-exploding, penetrating weapons made from heavy metals which are traditionally used against heavily armored targets. The Armament/AGGTS/Lab to use in conjunction with the QF-16 aircraft maintenance shop.

The Aircraft Corrosion Control provides an environmentally controlled area to wash aircraft. This aircraft corrosion control facility will include a covered aircraft wash rack.

The Fuel Systems Maintenance Dock is a space for an aircraft parking bay and support space for heating, plumbing, latrines, ventilation, compressed air, and fire detection and suppression. Maintenance docks provide protected space for aircraft maintenance. The fuel systems maintenance will include hangar space, administrative space, building support and fuel tank covered storage.

Supporting facilities include utilities (electric service, water, sewer, gas), pavements (paving, walks, curbs and gutters), storm drainage, site improvements and building information systems.

Apron Facilities: The 53 WEG Parking Apron consists of an aircraft Parking Apron, 11,447 S m = 122,864 SF. The new aircraft parking apron includes lighting. The apron includes subgrade, base and approximately 15 inches of Portland concrete cement. Additional pavement is required to support the WEG aircraft and provide area for aircraft operations outside of the obstruction free area. The apron provides aircraft parking, servicing, and loading. Apron lighting is also provided to support nighttime maintenance activities on the apron. The project includes all utilities, site improvements, soil remediation and cleanup. Privatized utility connection fees are included in their respective supporting facilities line items for electrical Gulf Coast Electric Cooperative (GCEC), water GCEC, and gas Peoples Gas Systems (PGS).

Background
The project involves the design and construction of two separate facilities: WEG HQ and WEG Maintenance Hangar and Apron Facilities at Tyndall Air Force Base, FL. The WEG HQ facility consists of a consolidated facility with administrative areas for the 53d TSS, 53d WEG, and 83d Squadron Operations staff. The administrative areas will be supported by conferencing, meeting, and other special spaces. The squadron operations will provide mission planning, SAPF workspace, briefing, storage, and vault space. The project also includes the construction of the WEG Maintenance Hangar which includes Maintenance Hangar, Armament Research Testing facility, Aircraft Maintenance Shop, Aircraft Corrosion Control facility, Fuel Systems Maintenance Dock, and Apron Facilities.

Work Details
The work includes construction tasks such as building administrative areas, mission planning facilities, SAPF workspace, briefing rooms, storage areas, vault space, aircraft maintenance hangars with specific features like HEF system and 10-ton crane, Armament Research Testing facility for research & development of non-exploding penetrating weapons made from heavy metals traditionally used against heavily armored targets. Additionally, it involves constructing an Aircraft Corrosion Control facility with covered aircraft wash rack and a Fuel Systems Maintenance Dock providing space for an aircraft parking bay and support space for heating, plumbing, latrines, ventilation, compressed air, and fire detection and suppression. The project also encompasses the construction of Apron Facilities including an aircraft Parking Apron with lighting and subgrade base made of Portland concrete cement.

Place of Performance
The construction projects will be performed at Tyndall Air Force Base in Florida.

Overview

Response Deadline
April 29, 2021, 3:00 p.m. EDT (original: April 15, 2021, 3:00 p.m. EDT) Past Due
Posted
March 15, 2021, 1:40 p.m. EDT (updated: April 5, 2021, 10:57 a.m. EDT)
Set Aside
None
Place of Performance
Tyndall AFB, FL 32403 United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
On 3/15/21 USACE Mobile District issued Solicitation W9127820R0028 for Design and Construction of Zone 3 - WEG HQ, Maintenace Hangar, and Apron Facilities, Tyndall Air Force Base, FL due 4/29/21. The opportunity was issued full & open with NAICS 236220 and PSC Y1JZ.
Primary Contact
Name
Amanda M. Milheiser   Profile
Phone
None

Secondary Contact

Name
Carl M. Wade   Profile
Phone
None

Documents

Posted documents for Solicitation W9127820R0028

Opportunity Lifecycle

Procurement notices related to Solicitation W9127820R0028

Award Notifications

Agency published notification of awards for Solicitation W9127820R0028

Contract Awards

Prime contracts awarded through Solicitation W9127820R0028

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W9127820R0028

Similar Active Opportunities

Open contract opportunities similar to Solicitation W9127820R0028

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > SAD > US ARMY ENGINEER DISTRICT MOBILE
FPDS Organization Code
2100-W91278
Source Organization Code
100221437
Last Updated
April 5, 2021
Last Updated By
amanda.m.milheiser@usace.army.mil
Archive Date
Dec. 31, 2021