CUSTER GALLATIN NATIONAL FOREST - West Fork Beaver Creek Trail #222 Flood Repair   3

ID: 1240LU24R0016 • Type: Solicitation

Description

Posted: June 18, 2024, 3:57 p.m. EDT

PROJECT DESCRIPTION: Hand construct approximately 560 feet of new 72 wide, full bench stock trail through two washed out avalanche ravines, within a non-motorized wilderness designation. Work includes new trail construction with picks, rock bars, jack hammers, drilling and blasting. New construction is within extremely steep slopes, loose soils, extensive rock, eroding rock cliffs, outcroppings, and bedrock. Repeated, extensive surface and subsurface drilling and blasting will likely be necessary along numerous sections within these ravines to establish a 72 full bench trail, and remove excess material from the backslope and hillside above the trail. A full bench trail cut down to a solid subsurface material will be crucial to trail longevity. Backslope will be reduced to a 4:3 ratio in mixed material, and a 5:2 within rock. Material to be excavated is estimated at 962 cubic yards.

Hand construct a 48 wide bench approximately 20' above the new trail location, near the top of the trail's planned cut slope. This bench will serve to catch falling rock and debris from above during trail excavation, as well as provide a safe platform to begin excavation below, and an anchor point for rope work. Backslope will be reduced to a 5:2 ratio above this bench. Material to be excavated is estimated at 268 cubic yards.

Restore approximately 13,366 lineal feet of existing trail to the desired specification of a 36 width trail prism with a 24 finished tread. Backslope will be reduced to a 3:2 ratio.

Restoration includes reconstructing and cleaning existing drain dips and water bars.

PROJECT LOCATION: The project is located within a non-motorized wilderness designation within the Madison Mountain range approximately 22 miles northwest of West Yellowstone, MT. From West Yellowstone, follow north on highway 191 approximately 8 miles. Turn left or west on highway 287, and follow for approximately 14 miles to the Beaver Creek road, between Hebgen and Earthquake lakes. Turn right or north on Beaver Creek road #985, and follow for three miles to the West Fork Beaver Creek trailhead and beginning of project.

MAGNITUDE OF CONSTRUCTION (per FAR 36.204(b)): Between $250,000 and $500,000.

BONDING: All offerors will be required to provide a Bid Bond (20%) with their proposal submission. Performance and Payment Bonds (100% each) will be required of the successful awardee.

There is no formal site visit for this project. Vendors are strongly encouraged to visit the site prior to submitting their proposal. For site information, clarification on directions and site conditions (such as closures, snow levels, etc.) please contact Todd Orr, Engineer Tech, Custer Gallatin National Forest at 406-587-6741 (todd.orr@usda.gov) during normal business hours.

Question & Answers #1 - Posted 6/18/2024

Posted: June 11, 2024, 4:44 p.m. EDT
Background
The project is a construction contract issued by the Custer Gallatin National Forest for the West Fork Beaver Creek Trail #222 Flood Repair. The work involves hand constructing approximately 560 feet of new 72” wide, full bench stock trail through two washed out avalanche ravines within a non-motorized wilderness designation. The project is located within the Madison Mountain range approximately 22 miles northwest of West Yellowstone, MT.

Work Details
The work includes new trail construction with picks, rock bars, jack hammers, drilling and blasting. It also involves constructing a 48” wide bench approximately 20’ above the new trail location, near the top of the trail’s planned cut slope.
Additionally, restoration of approximately 13,366 lineal feet of existing trail to the desired specification of a 36” width trail prism with a 24” finished tread is required. The restoration also includes reconstructing and cleaning existing drain dips and water bars.

Period of Performance
The estimated period of performance for the contract is from June 15, 2025, to October 15, 2025, with a contract period of performance of 123 days.

Place of Performance
The project is located within a non-motorized wilderness designation within the Madison Mountain range approximately 22 miles northwest of West Yellowstone, MT.

Overview

Response Deadline
July 11, 2024, 6:00 p.m. EDT Past Due
Posted
June 11, 2024, 4:44 p.m. EDT (updated: June 18, 2024, 3:57 p.m. EDT)
Set Aside
Small Business (SBA)
Place of Performance
MT United States
Source
SAM

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
$250,000 - $500,000 (value based on agency estimated range)
On 6/11/24 Forest Service issued Solicitation 1240LU24R0016 for CUSTER GALLATIN NATIONAL FOREST - West Fork Beaver Creek Trail #222 Flood Repair due 7/11/24. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237990 (SBA Size Standard $45 Million) and PSC Y1PA.
Primary Contact
Name
Alisha Knaub   Profile
Phone
(406) 438-2981

Documents

Posted documents for Solicitation 1240LU24R0016

Question & Answer

Opportunity Lifecycle

Procurement notices related to Solicitation 1240LU24R0016

Incumbent or Similar Awards

Contracts Similar to Solicitation 1240LU24R0016

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 1240LU24R0016

Similar Active Opportunities

Open contract opportunities similar to Solicitation 1240LU24R0016

Additional Details

Source Agency Hierarchy
AGRICULTURE, DEPARTMENT OF > FOREST SERVICE > CUSTER GALLATIN NATIONAL FOREST
FPDS Organization Code
12C2-0398
Source Organization Code
100171547
Last Updated
July 26, 2024
Last Updated By
alisha.knaub@usda.gov
Archive Date
July 26, 2024