Search Contract Opportunities

Contractor Kit Installation (CKI ) 2 of the Combined Block 7.0/8.1 Upgrade Modification to the United States Air Force(USAF) C-130J Fleet   2

ID: FA862524RB001 • Type: Sources Sought • Match:  95%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Draft a sources sought response template for this opportunity
Do the documents mention an incumbent contractor?
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

CONTRACTOR KIT INSTALLATION OF THE 7.0/8.1 BLOCK UPGRADE MODIFICATION TO THE UNITED STATES AIR FORCE (USAF) C-130J FLEET

GENERAL GUIDELINES: This Request For Information (RFI) is solely for the identification of potential small business sources for the above-stated modification program for market research and planning purposes and does not constitute a solicitation or request for proposals. Any response to this notice is not an offer and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for any and all expenses associated with responding to this RFI. The Government will not reimburse responders for any presentations, marketing efforts, or data related to their responses. The Government reserves the right to reject, in whole or in part, any responder's input resulting from this RFI. All information received in response to this RFI that is appropriately marked "proprietary" or "competition sensitive" will be handled accordingly. Only non-classified information shall be provided in any response. Copies of submitted information may be reproduced for Government review. Responses to this RFI will not be returned.

PURPOSE: The purpose of this RFI is to conduct market research to determine the existence and interest of prospective qualified small business sources that can accomplish Block 8.1 aircraft modification installations on approximately 115 C-130J and HC-130J aircraft. The aircraft includes mission-specific variations operated by the USAF (i.e. Air Mobility Command, Air Education and Training Command, Air Combat Command.) At present, each aircraft modification is expected to be complete in 130 days or less: including induction and inspections, installation, weights and balance, Quality Assurance (QA), Ground Tests, and Functional/Acceptance Check Flight. The first two (2) of each variant are allowed additional time (210 and 180 days respectively) to account for a learning curve. The USAF intends to provide approximately 15 - 21 aircraft per year.

RFI responses will be used to determine if this effort can be pursued as a partial or total Small Business Set-Aside acquisition. The Government is interested in responses from all responsible small businesses, including small business concerns, disadvantaged business concerns, Women-Owned Small Business (WOSB) concerns, Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns, and Historically Underutilized Business zone (HUBZone) small business concerns.

REQUIREMENTS DESCRIPTION: The technical documents (Technical Orders/Time Compliance Technical Orders) are available by request through the Procurement Contracting Officer (PCO), Casey Murphy. Please email the PCO at AFLCMC.WLNN.Contracting.CKI2@us.af.mil and Sarah Woods at sarah.woods.3.ctr@us.af.mil. Include the name, email, phone number, and position/title of a specific Point of Contract to receive the Technical Orders/Time Compliance Technical Orders, via DOD SAFE (https://safe.apps.mil).

The Block 8.1 modification installs the following major capabilities and upgrades onto the C-130J weapon system:

1. Numerous software upgrades

2. New Communications Navigation, and Identification System Processor (CNI-SP)

3. Link-16

4. New Pilot and Co-pilot Control Wheel

5. New Civil Global Positioning System (GPS)

6. New mission computer

7. Upgraded Data Transfer and Diagnostic System (DTADS)

8. New Identification Friend or Foe (IFF) Transponder Mode 5

9. Enhanced internal-communication system (ICS); SATCOM Data Link; improved public address (PA) system

10. Covert lighting aft of the cargo ramp

Retrofit kits shall be provided as Government Furnished Property and shall include both Group "A" and Group "B" elements. Group "A" consists of fabricated installation parts such as wiring, plugs, racks, and common hardware. Group "B" includes Block 8.1 Line Replaceable Units (LRUs) and associated licenses. The C-130J Block 8.1 kit installations began in 2020 and there are approximately 100-115 aircraft left to be modified. The USAF anticipates the contract we are soliciting information for will commence in 2027. A commercial warranty is expected to be included for all work performed.

All required parts lists, installation instructions and retrofit schedules will be provided by the Government at the time of proposal solicitation.

RESPONSES: Responses to the RFI questionnaire shall be submitted to the Government electronically no later than close of business on 2 February 2026. If you need additional time, contact the PCO within three (3) days of receipt of this inquiry. Should you choose to submit information in addition to your responses to the questionnaire, please limit that information to no more than 10 additional pages. Responses should be emailed to the PCO, Casey Murphy, at AFLCMC.WLNN.Contracting.CKI2@us.af.mil and Sarah Woods at sarah.woods.3.ctr@us.af.mil.

Background
The United States Air Force (USAF) is seeking to identify potential small business sources for the Block 7.0/8.1 Upgrade Modification program for the C-130J fleet. This initiative aims to enhance the capabilities of approximately 115 C-130J and HC-130J aircraft, which are utilized by various USAF commands including Air Mobility Command and Air Combat Command.

The goal is to conduct market research to assess the interest and capability of small businesses in performing these modifications, which include significant upgrades to aircraft systems.

Work Details
The contractor will be responsible for the installation of Government-furnished Block Upgrade (BU) 7.0/8.1 modification kits on up to 110 aircraft, following Time Compliance Technical Orders (TCTOs) and associated Technical Orders (TOs). Key tasks include:
1. Receiving, inspecting, and preparing aircraft for installation.
2. Installing Group A and Group B components of the BU 7.0/8.1 kits.
3. Conducting Acceptance Test Procedures (ATP) with sign-off from the Defense Contracts Management Agency (DCMA).
4. Returning aircraft to flyable status in accordance with established USAF practices.
5. Managing installation kit integrity, including receipt, inventory, warehousing, and scheduling.
6. Performing quality assurance checks and resolving maintenance issues.
7. For applicable C-130J-30 aircraft, executing TCTOs for Dynamic Re-tasking Capability (DRC) de-confliction concurrently with BU kit installations.
8. Manufacturing cargo compartment insulation blankets as needed during modifications.

Period of Performance
The anticipated contract period will commence in 2027, with each aircraft modification expected to be completed within 130 days or less, except for the first two variants which may take up to 210 and 180 days respectively due to a learning curve.

Place of Performance
The specific geographic locations for performance are not detailed in the solicitation; however, it involves installations on various USAF facilities where C-130J aircraft are stationed.

Overview

Response Deadline
Feb. 2, 2026, 8:30 p.m. EST Due in 14 Days
Posted
Jan. 9, 2026, 11:37 a.m. EST
Set Aside
None
Place of Performance
Fairborn, OH United States
Source

Current SBA Size Standard
1500 Employees
Pricing
Multiple Types Common
Est. Level of Competition
Low
Est. Value Range
Experimental
$115,000,000 - $345,000,000 (AI estimate)
Odds of Award
31%
On 1/9/26 AFLCMC Wright Patterson AFB issued Sources Sought FA862524RB001 for Contractor Kit Installation (CKI ) 2 of the Combined Block 7.0/8.1 Upgrade Modification to the United States Air Force(USAF) C-130J Fleet due 2/2/26. The opportunity was issued full & open with NAICS 336411 and PSC N016.
Primary Contact
Name
Casey Murphy   Profile
Phone
None

Secondary Contact

Name
Thomas Alig   Profile
Phone
None

Additional Contacts in Documents

Title Name Email Phone
Contracting Officer Sarah Woods Profile sarah.woods.3.ctr@us.af.mil None

Documents

Posted documents for Sources Sought FA862524RB001

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Sources Sought FA862524RB001

Incumbent or Similar Awards

Contracts Similar to Sources Sought FA862524RB001

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought FA862524RB001

Similar Active Opportunities

Open contract opportunities similar to Sources Sought FA862524RB001

Experts for Contractor Kit Installation (CKI ) 2 of the Combined Block 7.0/8.1 Upgrade Modification to the United States Air Force(USAF) C-130J Fleet

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE AIR FORCE > AFMC > AIR FORCE LIFE CYCLE MANAGEMENT CENTER > MOBILITY AIRCRAFT > FA8625 AFLCMC WLNK C130
FPDS Organization Code
5700-FA8625
Source Organization Code
500019551
Last Updated
Jan. 9, 2026
Last Updated By
casey.murphy@us.af.mil
Archive Date
Feb. 2, 2026