Search Contract Opportunities

Construct New Public Water Supply Well at Cape Cod Space Force Station

ID: W912WJ26X1BVC • Type: Sources Sought • Match:  100%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Action Code: Sources Sought Notice

Subject: Construct New Public Water Supply Well at Cape Cod Space Force Station (CCSFS) in Bourne, Massachusetts

Solicitation Number: PANNAD-26-P-0000 032411

NACIS Code: 237110 (Water and Sewer Line and Related Structures Construction)

Response date: 3 July 2026

Place of Performance: CCSFS, Bourne, MA

US Army Corps of Engineers, New England District

696 Virginia Road

Concord, MA 01742-2751

The U.S. Army Corps of Engineers, New England District is issuing this Sources Sought Notice (SSN) for Construction Services to execute a Design-Build contract for the Construction of a New Public Water Supply Well project located at CCSFS, Bourne, MA. This announcement is to determine interest, availability and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned and Small Business concerns for this project. The NAICS code for this procurement is 237110 with a size standard of $45M. The project is planned to be issued in the Winter of 2026 with construction to begin in the Spring of 2027. The estimated construction cost is between $500,000 - $1,000,000.

The project will be constructed within the extents of CCSFS with most work taking place in an access controlled secure area. CCSFS is an active-duty military installation located in the northwest corner of Joint Base Cape Cod, on Flatrock Hill in Bourne, Massachusetts. The objective of this project is to enhance water security and resiliency at CCSFS by constructing a new water supply well to serve as the primary source for all occupants. There are currently two (2) water supply wells at the installation drilled in overburden near the base of a glacial deposit. The scope includes all work required to turn over a fully functional and Massachusetts Department of Environmental Protection (MassDEP) compliant water supply well to the Government. The project will require the Contractor to be the Designer of Record and complete all compliance tasks in accordance with MassDEP's New Source Approval Process, MassDEP Drinking Water Regulations 310 CMR 22.00, and MassDEP policies for developing, testing, and design, as applicable, for new public groundwater supply drinking wells. Work for this project will likely include, but not limited to, the following:

  • Design services to construct a new water supply well including all civil, survey, site, mechanical, and electrical details for integration into the existing water supply infrastructure.
  • Facilitate and coordinate all regulatory compliance actions for MassDEP approval of the new water supply well in accordance with the MassDEP New Source Approval Process as described in the MassDEP Guidelines and Policies for Public Water Systems (as amended).
  • Mobilize appropriate equipment and conduct drilling operations to develop a new well that meets project criteria such as a 400-foot depth with a gravel or filter pack design.
  • Excavate and install 200 linear feet of new potable water piping from the well head to the existing treatment building and integrate piping with existing distribution headers.
  • Install and program a new pump control panel capable of independently controlling and sequencing multiple water supply pumps.
  • During construction all facilities will remain occupied, and the Contractor must maintain continuous, safe potable water service to the installation for the duration of the project using the existing drinking water wells.

Interested firms should submit a capabilities package to include the following: business classification (i.e. HUBZone, small business, etc.), as well as qualifications and experience in performing the work components stated above. Please include up to three (3) specific examples of the firm's experience performing the work requirements stated above, with at least one (1) example of the firm's experience in Massachusetts following the MassDEP New Source Approval Process such as drilling new public supply gravel-packed wells in deep overburden, prolonged pumping tests, and design and construction of active new groundwater supply water wells that required water treatment (i.e., Secondary Contaminants, organics, etc.). The projects must have been completed within the last seven (7) years. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications, specifically in Massachusetts, which will be used to support the offeror's effort, and their experience must also have been performed within the last seven (7) years. Proof of bonding capability is required. Responses are limited to twenty (20) pages. Responses are due by July 3, 2026. Responses should be emailed to:

Ann Murphy Adley ann.m.adley@usace.army.mil

Phone Contact: (978) 318-8255

Interested firms shall provide the above documentation in one original form and one copy. The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice.

Government Agency URL: www.nae.usace.army.mil

Government Agency URL Description: New England District, US Army Corps of Engineers

Loading Map
Loading Map

Overview

Response Deadline
July 3, 2026, 5:00 p.m. EDT Due in 24 Days
Posted
June 3, 2026, 9:20 a.m. EDT
Set Aside
None
PSC
None
Place of Performance
Bourne, MA United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Low
Est. Value Range
$500,000 - $1,000,000 (value based on agency estimated range)
Odds of Award
13%
Signs of Shaping
62% of similar contracts within the Department of the Army had a set-aside.
On 6/3/26 USACE New England District issued Sources Sought W912WJ26X1BVC for Construct New Public Water Supply Well at Cape Cod Space Force Station due 7/3/26. The opportunity was issued full & open with NAICS 237110.
Primary Contact
Name
Ann Murphy Adley   Profile
Phone
(978) 318-8255

Documents

Posted documents for Sources Sought W912WJ26X1BVC

Opportunity Assistant


AI Analysis

AI Generate

Incumbent or Similar Awards

Contracts Similar to Sources Sought W912WJ26X1BVC

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought W912WJ26X1BVC

Similar Active Opportunities

Open contract opportunities similar to Sources Sought W912WJ26X1BVC

Experts for Construct New Public Water Supply Well at Cape Cod Space Force Station

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > NAD > W2SD ENDIST NEW ENGLAND
FPDS Organization Code
2100-W912WJ
Source Organization Code
100221388
Last Updated
June 3, 2026
Last Updated By
ann.m.adley@usace.army.mil
Archive Date
July 18, 2026