Search Contract Opportunities

CO Omad 300(70) Minuteman Missile Access Road   3

ID: 6982AF25B000008 • Type: Solicitation • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Loading

Description

PROJECT NUMBER: CO OMAD 300(70)

PROJECT NAME: Minuteman Missile Access Road

PROJECT DESCRIPTION: CO OMAD 300(70) - The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads. FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado.

In cooperation with the F.E. Warren Air Force Base and Central Federal Lands Highway Division, this project includes re-graveling of up to 156.582 miles of existing gravel Minuteman Missile Access Roads in various counties within Colorado, Nebraska, and Wyoming. The intent of this project is to provide necessary aggregate road maintenance for select routes utilized by the United States Air Force.

With a fixed-price variable-scope contracting method, less mileage may be awarded. The total amount of miles included in the scope will be dictated by the mileage proposed. The project PS&E will provide a prioritized schedule of roadways to be improved that is anticipated to include up to 156.582 total miles of roadway reconditioning and re-graveling of existing aggregate surface roads.

SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.

Background
The Office of Missile Air Defense Program (OMAD) is part of the Department of Defense (DoD) and oversees the Defense Access Road (DAR) program, which funds annual maintenance and improvements on certified gravel roads. This project supports the Air Force Intercontinental Ballistic Missile Program (Minuteman) in collaboration with the Military Surface Deployment and Distribution Command (SDDC).

The Minuteman Missile Access Roads are located in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado.

Work Details
The project involves re-graveling up to 156.582 miles of existing gravel Minuteman Missile Access Roads across various counties in Colorado, Nebraska, and Wyoming. The scope includes roadway reconditioning and the addition of four inches of aggregate surface course while ensuring all work remains on the existing roadway bench.

The typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4 inches of Aggregate Surface Course with a maximum width of 24 feet. A 4% crown is proposed or as approved by the Contracting Officer, with necessary tapering down of the proposed aggregate surface at applicable locations.

Place of Performance
The construction projects will be performed in southwestern Wyoming, southeastern Nebraska, and northeastern Colorado.

Overview

Response Deadline
Dec. 16, 2025, 4:00 p.m. EST (original: Dec. 9, 2025, 4:00 p.m. EST) Past Due
Posted
Nov. 3, 2025, 1:15 p.m. EST (updated: Jan. 29, 2026, 12:14 p.m. EST)
Set Aside
Small Business (SBA)
Place of Performance
CO United States
Source
Links

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Est. Level of Competition
Average
Est. Value Range
Experimental
$8,000,000 - $15,000,000 (AI estimate)
Signs of Shaping
71% of obligations for similar contracts within the Federal Highway Administration were awarded full & open.
On 11/3/25 Central Federal Lands Highway Division issued Solicitation 6982AF25B000008 for CO Omad 300(70) Minuteman Missile Access Road due 12/16/25. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237310 (SBA Size Standard $45 Million) and PSC Y1LB.
Primary Contact
Name
Douglas Whitcomb   Profile
Phone
None

Secondary Contact

Name
Leslie Karsten   Profile
Phone
None

Documents

Posted documents for Solicitation 6982AF25B000008

Opportunity Assistant


AI Analysis

Opportunity Lifecycle

Procurement notices related to Solicitation 6982AF25B000008

Contract Awards

Prime contracts awarded through Solicitation 6982AF25B000008

Incumbent or Similar Awards

Contracts Similar to Solicitation 6982AF25B000008

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 6982AF25B000008

Similar Active Opportunities

Open contract opportunities similar to Solicitation 6982AF25B000008

Experts for CO Omad 300(70) Minuteman Missile Access Road

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 6982AF CENTRAL FEDERAL LANDS DIVISI
FPDS Organization Code
6925-00068
Source Organization Code
100173515
Last Updated
Jan. 30, 2026
Last Updated By
leslie.karsten@dot.gov
Archive Date
Jan. 29, 2026