Search Contract Opportunities

CO FLAP LAR 10(1) Horsetooth Res and Carter Lake   5

ID: 6982AF24B000022 • Type: Solicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

PROJECT NUMBER: CO FLAP LAR 10(1)

PROJECT NAME: Horsetooth and Carter Lake

PROJECT DESCRIPTION: The project will rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. The reservoirs are federally owned by the United States Bureau of Reclamation (BOR) with areas that access to the facilities managed by Larimer County. The project will improve vehicular and pedestrian access to the reservoirs while simultaneously improving safety at these locations which serve over one million visitors annually.

SCOPE OF THE WORK: The scope includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Carter Lake Reservoir improvements include rehabilitation at the North Pines and Eagle Campground Parking Lots, reconstruction of the Big Thomson Parking Lot, new construction at the Quarry Overflow Parking Lot, and widening of County Road 31 for an auxiliary travel lane between the Big Thomson and Quarry Overflow Parking Lots. The Horsetooth Reservoir improvements include rehabilitation of the Inlet Bay and South Bay Parking Lots and widening of County Road 38E to accommodate an additional turn lane into the South Bay Parking Lots. The work at the sites specifically includes roadway excavation, obliteration, full depth reclamation, aggregate base and asphalt concrete pavement placement, concrete flatwork and curb and gutter, and signing and striping. Drainage improvements such as culvert installation, channel stabilization, and water quality features are also included. Due to the high recreational use of the facilities, vehicular, cyclist, and pedestrian access must be maintained during construction.

Background
The project is issued by the Federal Highway Administration, specifically the Central Federal Lands Highway Division. The mission of this agency is to provide a safe and efficient transportation system that meets the needs of the public and enhances the quality of life.

The goal of this contract is to rehabilitate and reconstruct various parking lots and access routes at the Horsetooth and Carter Lake Reservoirs in Larimer County, Colorado. These federally owned reservoirs are managed by the United States Bureau of Reclamation (BOR) and serve over one million visitors annually, necessitating improvements to vehicular and pedestrian access for enhanced safety.

Work Details
The scope of work includes rehabilitation, reconstruction, minor widening, and new construction of parking lots and access roads. Specific tasks include:
- Rehabilitation at North Pines and Eagle Campground Parking Lots at Carter Lake Reservoir.
- Reconstruction of the Big Thomson Parking Lot.
- New construction at Quarry Overflow Parking Lot.
- Widening of County Road 31 for an auxiliary travel lane between Big Thomson and Quarry Overflow Parking Lots.
- Rehabilitation of Inlet Bay and South Bay Parking Lots at Horsetooth Reservoir.
- Widening of County Road 38E to accommodate an additional turn lane into South Bay Parking Lots.

Construction activities will involve roadway excavation, obliteration, full depth reclamation, aggregate base placement, asphalt concrete pavement placement, concrete flatwork, curb and gutter installation, signing, striping, drainage improvements including culvert installation, channel stabilization, and water quality features. It is crucial that vehicular, cyclist, and pedestrian access be maintained during construction due to high recreational use.

Period of Performance
The contractor shall begin performance within 10 calendar days after receiving notice to proceed and must complete the work within a specified timeframe as outlined in the contract documents.

Place of Performance
The construction projects will be performed at Horsetooth Reservoir and Carter Lake Reservoirs located in Larimer County, Colorado.

Overview

Response Deadline
Dec. 5, 2024, 4:00 p.m. EST Past Due
Posted
Oct. 29, 2024, 12:03 p.m. EDT (updated: Jan. 3, 2025, 4:29 p.m. EST)
Set Aside
Small Business (SBA)
Place of Performance
Fort Collins, CO United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Signs of Shaping
71% of obligations for similar contracts within the Federal Highway Administration were awarded full & open.
On 10/29/24 Central Federal Lands Highway Division issued Solicitation 6982AF24B000022 for CO FLAP LAR 10(1) Horsetooth Res and Carter Lake due 12/5/24. The opportunity was issued with a Small Business (SBA) set aside with NAICS 237310 (SBA Size Standard $45 Million) and PSC Y1LB.
Primary Contact
Name
Leslie Karsten   Profile
Phone
None

Documents

Posted documents for Solicitation 6982AF24B000022

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Opportunity Lifecycle

Procurement notices related to Solicitation 6982AF24B000022

Award Notifications

Agency published notification of awards for Solicitation 6982AF24B000022

Contract Awards

Prime contracts awarded through Solicitation 6982AF24B000022

Incumbent or Similar Awards

Contracts Similar to Solicitation 6982AF24B000022

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation 6982AF24B000022

Similar Active Opportunities

Open contract opportunities similar to Solicitation 6982AF24B000022

Experts for CO FLAP LAR 10(1) Horsetooth Res and Carter Lake

Recommended experts avaliable for hire

Additional Details

Source Agency Hierarchy
TRANSPORTATION, DEPARTMENT OF > FEDERAL HIGHWAY ADMINISTRATION > 6982AF CENTRAL FEDERAL LANDS DIVISI
FPDS Organization Code
6925-00068
Source Organization Code
100173515
Last Updated
Jan. 15, 2025
Last Updated By
leslie.karsten@dot.gov
Archive Date
Jan. 15, 2025