CNS Alternate Transformer Substation

ID: FA557525B0010 • Type: Solicitation • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Does this contract have any security clearance requirements?
Does this solicitation list any subcontracting requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

Posted: Aug. 18, 2025, 1:25 p.m. EDT

AMENDMENT 6: The purpose of this amendment is to correct an error on the Questions and Answers document. Prospective contractors should direct their attention to Question #5 and Answer #6.

Bottom line up front, prospective contracts shall submit their Construction Cost Estimate Breakdown with line item #102 (Endesa works) filled out with a total of 194,374.81 EUR (IVA included).

All other terms and conditions of this solicitation remain unchanged.

AMENDMENT 5: The purpose of this amendment is to provide the final version of the amended documents following the changes mandated by the Spanish Electrical Distribution company, Endesa Distribucion. The following documents will be added:

1. AMD 5 - Drawings - Basic Package

2. AMD 5 - English Specifications

3. AMD 5 - Especificaciones Espanol

4. AMD 5 - Summary of Amd 5 Changes

Please request for the files via email to the Construction team POCs.

The bid due date will not be extended due to the risk of funds availability and the timeframe in relation to the end of FY25.

All other terms and conditions of this solicitation remain unchanged.

AMENDMENT 4: The purpose of this amendment is to provide the Questions and Answers submitted by contractors for this solicitation. Please refer to the attachments section for the Q&A document. All other terms and conditions of this solicitation remain unchanged.

AMENDMENT 3: The purpose of this amendment is to extend the bid due date to 20 August 2025 at 10:00 am local time (CEST).

All other terms and conditions of this solicitation remain unchanged.

AMENDMENT 2: The purpose of this amendment is to notify prospective contractors of a few updated attachments:

4. English Specifications - AMD 1

5. Especificaciones Espanol - AMD 1

6. Construction Cost Estimate Breakdown BLANK - AMD 1

All other terms and conditions of this solicitation remain unchanged.

AMENDMENT 1: The site visit date and time have been updated to 15 July 2025 at 10:00 am local time (CEST).

Additionally, the following changes are anticipated due to mandatory design changes initiated by the Spanish Electrical Distribution company, Endesa Distribucion:

1. The projected electrical utilities are in the 50 Hz side of the Moron AB electrical system and
they will be electrically connected to the Spanish distribution grid. As a result, the Spanish
codes, rules and procedures are mandatory in this project.
2. The electrical distribution grid company, where these utilities will be connected to, belongs
to Endesa Distribucion (EDE), that has their own standards that are also mandatory in this project,
and are subject by review and approval by EDE technical personnel.
3. EDE's review is taking place in these days, so it is expected that minor changes will occur in
project drawings and specifications as a result of EDE's recommendations. These recommendations are
not expected to increase/decrease the scope of the project, but they will mainly be associated to
parts of the installation being installed by either the Contractor or by EDE with their own means
(whose cost will remain under the project in any case, since the Contractor will have to arrange
with EDE the coordination, execution of works and commissioning of all utilities).
4. The design includes all necessary installations and utilities for the new 5 MVA transformer
bay, being a comprehensive solution. Possible changes to the design, as mentioned above, will
mainly drive to items being deleted from the drawings/specs since they will be executed by EDE and
not by the Contractor, but will be indeed executed within the project anyways.

As a result of the above, please expect some of the project documents to change. The updated documents will be made available as soon as we
receive them. Any extensions to this solicitation will be considered after receipt of the updated documents.

Project QUUG 10-1049, CNS Alternate Transformer Substation, Moron Air Base, Spain.

The magnitude of this project is between $1,000,000 and $5,000,000 U.S. Dollars. This is furnished for the convenience of prospective contractors. The actual extent of work requirements will be governed by the specifications and drawings. See section L for complete information regarding referenced project. Offers will be evaluated according to the criteria in Section M, Evaluation criteria for award.

A pre-proposal Conference / Site Visit will be held 15 July 2025, 10:00 hours local time, in the Contracting Conference room, bldg 106. Please RSVP via email at least 24 hours prior to the site visit. Unless you have access to Moron Air Base, you will need an escort. If you require an escort, please request access via email at least 72 hours prior to the site visit. Questions in regards to this solicitation must be submitted via email no later than 23 July 2025. Bids must be received no later than 10:00 hours local time on 6 August 2025. Bids submitted by facsimile will NOT be accepted. Please ensure bids adhere to all requirements found in Section L of this solicitation. Nonconforming bids will not be accepted or evaluated.

Due to file size constraints, interested contractors must request one attachment, 1. Drawings - Basic Package.

The Contracting POCs are:
Ms. Elia Portz: elia.portz_cueli.1.es@us.af.mil
TSgt Augustus Shinn: augustus.shinn@us.af.mil
SrA Ryan Kulpa: ryan.kulpa@us.af.mil

In accordance with the Agreement of Defense and Cooperation between the Kingdom of Spain and the United States of America, any contract resulting from this notice/solicitation can only be entered into with companies authorized to carry out these activities in Spain under Spanish law. Companies must meet the requirements established by Spanish legislation for execution of Government works. In addition, in accordance with the Agreement of Defense Cooperation between the U.S.A. and the Kingdom of Spain, Annex 6, Article 1 (3) "The contractors must meet the requirements established by Spanish legislation for execution of government works. A breach of contract on the part of a contractor shall have the same consequences for the contractor for purposes of future contracting with the Spanish government as would occur with a breach of a contract with the Spanish public administration." and (5) " Spanish material, labor, and equipment shall be used whenever feasible and consistent with the requirements".

NOTE: THIS SOLICITATION IS INTENDED ONLY FOR LOCAL SOURCES IN ACCORDANCE WITH FEDERAL ACQUISITION REGULATION 5.202(a)(12). LOCAL SOURCES ARE THOSE SOURCES NORMALLY RESIDENT, LICENSED AND REGISTERED TO CONDUCT CONSTRUCTION BUSINESS IN SPAIN. OFFERS FROM NON-LOCAL SOURCES WILL NOT BE CONSIDERED UNDER THIS SOLICITATION.

Notice to Offerors: Funds are not presently available within USAFE to fund this project, so bid acceptance period should be valid through 31 Dec 2025. The Government reserves the right to cancel this solicitation, at any time with no obligation to the offeror by the government.

Posted: Aug. 14, 2025, 4:43 a.m. EDT
Posted: July 25, 2025, 7:25 a.m. EDT
Posted: July 16, 2025, 8:31 a.m. EDT
Posted: July 10, 2025, 5:14 a.m. EDT
Posted: July 3, 2025, 11:05 a.m. EDT
Posted: July 1, 2025, 3:23 p.m. EDT
Background
The project QUUG 10-1049 involves the construction of an alternate transformer substation at Moron Air Base, Spain. This initiative is part of the collaboration between the Kingdom of Spain and the United States of America, aimed at enhancing the electrical infrastructure at the base. The contract is intended for local sources that are authorized to conduct construction activities in Spain under Spanish law.

Work Details
The scope of work includes the construction of an expansion to the main electrical substation at Moron Air Base, where the incoming commercial electrical line enters the base. The actual extent of work requirements will be governed by detailed specifications and drawings provided in the solicitation documents. Contractors must utilize Spanish materials, labor, and equipment whenever feasible and consistent with project requirements.

Place of Performance
Moron Air Base, Spain.

Overview

Response Deadline
Aug. 20, 2025, 4:00 a.m. EDT (original: Aug. 6, 2025, 4:00 a.m. EDT) Past Due
Posted
July 1, 2025, 3:23 p.m. EDT (updated: Aug. 18, 2025, 1:25 p.m. EDT)
Set Aside
None
Place of Performance
Moron Air Base 41530 Spain
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Average
Est. Value Range
$1,000,000 - $5,000,000 (value based on agency estimated range)
Signs of Shaping
89% of similar contracts within the Department of the Air Force had a set-aside.
On 7/1/25 U.S. Air Forces Europe and Africa issued Solicitation FA557525B0010 for CNS Alternate Transformer Substation due 8/20/25. The opportunity was issued full & open with NAICS 237130 and PSC Y1NZ.
Primary Contact
Name
Elia Portz   Profile
Phone
34955848017

Secondary Contact

Name
Augustus Shinn   Profile
Phone
34955848481

Additional Contacts in Documents

Title Name Email Phone
None SrA Ryan Kulpa Profile ryan.kulpa@us.af.mil None

Documents

Posted documents for Solicitation FA557525B0010

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Contract Awards

Prime contracts awarded through Solicitation FA557525B0010

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation FA557525B0010

Similar Active Opportunities

Open contract opportunities similar to Solicitation FA557525B0010

Experts for CNS Alternate Transformer Substation

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE AIR FORCE > USAFE > FA5575 496 ABS PK DA LGC
FPDS Organization Code
5700-FA5575
Source Organization Code
100076521
Last Updated
Sept. 4, 2025
Last Updated By
augustus.shinn@us.af.mil
Archive Date
Sept. 4, 2025