Search Contract Opportunities

Climbing Tower Maintenance and Restoration

ID: W911RZClimbingTowermaintenanceandRestoration • Type: Sources Sought • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Some suggestions:
Please summarize the work to be completed under this opportunity
Draft a sources sought response template for this opportunity
Does this contract have any security clearance requirements?
I'd like to anonymously submit a question to the procurement officer(s)
Loading

Description

THIS IS A SOURCES SOUGHT NOTICE REQUESTING INFORMATION IN SUPPORT OF THE FOLLOWING REQUIREMENT. This is NOT a Request for Proposal (RFP) or an announcement of a forthcoming solicitation. The Government is seeking information concerning the availability of capable contractors to provide:

All resources and materials needed to execute climbing renovations and modifications. The contractor will warranty all work one year from date of completion and closeout. It will be the responsibility of the contractor to procure all materials, coordinate manpower, and conduct scheduling to ensure a timely completion per the agreed upon call order period of performance. Period of Performance: 30 September 2025- 31 March 2026

5.1 Basic Services. The Contractor shall provide services for all waste management ensuring it is properly disposed of off-site. The Contractor will always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. The contractor will regrout and repaint structural steel base plates. The contractor will clean and repaint all panel rebar hooks. The contractor will replace all missing, worn, or unserviceable t-nuts and corresponding anchor points. The contractor will remove and repair all loose and delaminated concrete. The contractor will patch all cracks properly routing out to ensure a clean and durable bond. The contractor will paint and seal all repair areas identified (any abnormality in the climbing wall and/or structure as compared to original or intended state). The contractor will patch and seal the top of the structure to cover exposed substructure and reduce water intrusion. The contractor will repaint and seal the entire climbing wall. The contractor will repaint and seal all portions of the primary steel structure with signs of flaking, corrosion, or damage. Corrosion, cracks, and/or other abnormalities will be identified, removed, and structurally reinforced with appropriate welding and or fastening. The contractor will scour and seal the existing concrete with textured sealant. The contractor will adjust and orient all top rope and lead bolt hangars. A load test will be performed to support intensive training loads and a safe and maximum load capacity reports will be generated for all existing anchor points. The contractor will have the appropriate experience and credentialling to conduct climbing wall repairs of this scale. Lack of appropriate experience and/or credentialing will result in immediate termination. It will be the responsibility of the contractor to procure all materials, coordinate manpower, and conduct scheduling to ensure a timely completion per the agreed upon period of performance. The contractor, subcontractors, and all personnel associated with the project must have the appropriate access to Fort Carson and appropriate climbing wall restoration experience and/or credentialing.

No contract will be awarded from this announcement. This source sought notice should not be construed as a commitment or authorization to incur costs in anticipation of such a procurement. MICC Fort Carson is interested in obtaining responses from prospective contractors, but no contractor will be reimbursed for providing this information, therefore MICC-Ft. Carson will accept the requested information in whatever format it is provided. All information provided shall become property of the U.S. Army and will not be returned. Responses are requested by 0900 AM Mountain Standard Time on September 09, 2025.

Overview

Response Deadline
Sept. 9, 2025, 11:00 a.m. EDT Past Due
Posted
Sept. 5, 2025, 6:55 p.m. EDT
Set Aside
Small Business (SBA)
Place of Performance
Colorado Springs, CO United States
Source

Current SBA Size Standard
$45 Million
Pricing
Likely Fixed Price
Est. Level of Competition
Low
Odds of Award
32%
Signs of Shaping
The solicitation is open for 3 days, below average for the MICC Fort Carson. 70% of obligations for similar contracts within the Department of the Army were awarded full & open.
On 9/5/25 MICC Fort Carson issued Sources Sought W911RZClimbingTowermaintenanceandRestoration for Climbing Tower Maintenance and Restoration due 9/9/25. The opportunity was issued with a Small Business (SBA) set aside with NAICS 236220 (SBA Size Standard $45 Million) and PSC Z2JZ.
Primary Contact
Name
Julia Gomez   Profile
Phone
None

Documents

Posted documents for Sources Sought W911RZClimbingTowermaintenanceandRestoration

Question & Answer

The AI Q&A Assistant has moved to the bottom right of the page

Incumbent or Similar Awards

Contracts Similar to Sources Sought W911RZClimbingTowermaintenanceandRestoration

Potential Bidders and Partners

Awardees that have won contracts similar to Sources Sought W911RZClimbingTowermaintenanceandRestoration

Similar Active Opportunities

Open contract opportunities similar to Sources Sought W911RZClimbingTowermaintenanceandRestoration

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > AMC > ACC > MISSION & INSTALLATION CONTRACTING COMMAND > 418TH CSB
FPDS Organization Code
2100-W911RZ
Source Organization Code
500036835
Last Updated
Sept. 5, 2025
Last Updated By
julia.e.gomez.civ@army.mil
Archive Date
Sept. 24, 2025