Search Contract Opportunities

City of Follansbee Water System Improvements Project - Section 219   2

ID: W911WN25BA014 • Type: Solicitation • Match:  85%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Generate a draft:
Loading

Description

Posted: Sept. 29, 2025, 2:51 p.m. EDT
The U.S. Army Corps of Engineers, Pittsburgh District, has a requirement for completing improvements to the existing water distribution system and water treatment plant in the City of Follansbee, Brooke County, West Virginia. The major work of this requirement is: Upgrade existing water treatment plant from 700GPM to 1,000GPM, distribution system work, and water storage tank work. The work shall be completed 455 calendar days after written Notice to Proceed. Per FAR 36.204(f), magnitude of construction is between $1,000,000.00 and $5,000,000.00. This acquisition will be procured as an Unrestricted, Full and Open Competition. The resulting award will be for one (1) Firm-Fixed Price (FFP) Contract. All responsible Bidders are encouraged to participate. The Invitation for Bid (IFB) will be issued online through Procurement Integrated Enterprise Environment (PIEE) which posts the opportunity to SAM.gov; therefore, requests for hardcopies of the solicitation will not be honored. The NAICS Code is 237110, Water and Sewer Line and Related Structures Construction, and the Small Business Size Standard is $45,000,000.00. In order to submit a Bid for this project, your company must: 1) Be registered in the System for Award Management (SAM) and maintain an active registration status and 2) be registered in the Procurement Integrated Enterprise Environment (PIEE) for the Solicitation Module with the PROPOSAL MANAGER Role. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here. Amendment 0001 is to extend bid due date from 9/2/2025 to 9/11/2025. Amendment 0002 is to extend bid due date and question period, and update section 01 45 00.15 08 of specifications. Amendment 0003 is to update Specifications, add an Attachment, and remove language in the Solicitation.
Posted: Sept. 18, 2025, 1:42 p.m. EDT
Posted: Sept. 5, 2025, 10:16 a.m. EDT
Posted: Aug. 22, 2025, 12:33 p.m. EDT
Posted: Aug. 15, 2025, 1:08 p.m. EDT
Posted: Aug. 13, 2025, 9:53 a.m. EDT
Posted: Aug. 5, 2025, 9:13 a.m. EDT
Background
The U.S. Army Corps of Engineers, Pittsburgh District, is seeking to improve the existing water distribution system and water treatment plant in the City of Follansbee, Brooke County, West Virginia.

The goal of this contract is to enhance the capacity and reliability of the water treatment facility as part of their mission to provide efficient and effective civil works projects.

Work Details
The major work includes upgrading the existing water treatment plant from a capacity of 700 gallons per minute (GPM) to 1,000 GPM.

Additional tasks involve improvements to the distribution system and enhancements related to water storage tank work. The contractor will be responsible for all construction tasks outlined in the Statement of Work (SOW), ensuring compliance with all specifications and standards.

Period of Performance
The contract will be performed over a period starting from September 15, 2025, and concluding on December 14, 2026. The contractor must complete all work within 455 calendar days after receiving the Notice to Proceed.

Place of Performance
The construction projects will take place in the City of Follansbee, Brooke County, West Virginia.

Overview

Response Deadline
Sept. 18, 2025, 11:00 a.m. EDT (original: Sept. 2, 2025, 11:00 a.m. EDT) Past Due
Posted
Aug. 5, 2025, 9:13 a.m. EDT (updated: Sept. 29, 2025, 2:51 p.m. EDT)
Set Aside
None
Place of Performance
Follansbee, West Virginia 26037
Source

Current SBA Size Standard
$45 Million
Pricing
Fixed Price
Est. Level of Competition
Average
Est. Value Range
$1,000,000 - $5,000,000 (value based on agency estimated range)
Signs of Shaping
62% of similar contracts within the Department of the Army had a set-aside.
On 8/5/25 USACE Pittsburgh District issued Solicitation W911WN25BA014 for City of Follansbee Water System Improvements Project - Section 219 due 9/18/25. The opportunity was issued full & open with NAICS 237110 and PSC Y1NE.
Primary Contact
Name
Mario Dizdarevic   Profile
Phone
(412) 395-7256

Secondary Contact

Name
Connie L. Ferguson   Profile
Phone
(412) 395-7551

Documents

Posted documents for Solicitation W911WN25BA014

Opportunity Assistant


AI Analysis

AI Generate

Opportunity Lifecycle

Procurement notices related to Solicitation W911WN25BA014

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Solicitation W911WN25BA014

Similar Active Opportunities

Open contract opportunities similar to Solicitation W911WN25BA014

Experts for City of Follansbee Water System Improvements Project - Section 219

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
DEPT OF DEFENSE > DEPT OF THE ARMY > USACE > LRD > US ARMY ENGINEER DISTRICT PITTSBURG
FPDS Organization Code
2100-W911WN
Source Organization Code
100221359
Last Updated
Sept. 29, 2025
Last Updated By
mario.dizdarevic@usace.army.mil
Archive Date
Oct. 3, 2025