Search Contract Opportunities

Chancery 3003 Integrated window blinds (104)

ID: PR16077115 • Type: Special Notice • Match:  90%
Opportunity Assistant

Hello! Please let me know your questions about this opportunity. I will answer based on the available opportunity documents.

Please sign-in to link federal registration and award history to assistant. Sign in to upload a capability statement or catalogue for your company

Popular Questions:
Loading

Description

Statement of Work (SOW): Maintenance & Motor Retrofit (Final Version)

Project: Refurbishment of 104 Integrated Venetian Blinds
Location: Office Building Bern, Switzerland
System Type: Warema Type 1.16/25/35.07 (24v motor) inside WICONA WICLINE Aluminum Composite Windows

1. Project Objective

The contractor shall provide a turnkey solution for the inspection, repair, and motor retrofit of 104 integrated venetian blinds. The objective is to restore 100% motorized functionality while maintaining the thermal, acoustic, and aesthetic integrity of the WICONA window units.

2. Comprehensive Pricing & Scope

The offer submitted by the contractor must be all-inclusive. No additional costs will be entertained after the contract award. The bid price shall include:

  • Labor: All technician, electrician, and logistical personnel hours.
  • Materials: All motors, cables, lift tapes, ladder cords, and hardware components.
  • Equipment: All tools, specialized window opening devices, safety gear, and cleaning supplies.
  • Transportation: All travel costs, vehicle expenses, and shipping/freight for parts.
  • Fees: Disposal fees, administrative costs, and any required permits or insurance.

3. Logistics & Site Management

  • Furniture Management: Contractor shall move office furniture and equipment as required to gain unobstructed access to the windows. All items must be protected and returned to their original positions upon completion.
  • Surface Protection: Provide appropriate floor and wall protection during the transit of tools and components.

4. Health, Safety & Electrical Standards

  • Qualified Personnel: Only certified electricians (per Swiss regulations) may perform electrical work.
  • Lockout/Tagout (LOTO): A strict LOTO procedure must be implemented. Hazardous energy sources must be isolated, locked, and tagged before work commences.
  • Verification: Zero-energy state must be verified via testing before physical contact with wiring.
  • Controls: Each motor control shall be integrated into the Building KNX system.

5. Technical Execution: WICONA & Warema Systems

  • Sash Access: Open the internal "sandwich" sash of the WICONA windows using the integrated latches.
  • Hardware Maintenance: Inspect and lubricate all WICONA latching mechanisms and concealed hardware.
  • Gasket Inspection: Verify the condition of internal gaskets. Damaged seals must be reported or replaced to ensure the cavity remains dust and moisture-free.
  • Blind Retrofit:
    • Identify and replace failed motors with compatible high-quality alternatives (e.g., Somfy, Elero) that fit the existing Warema headrails.
    • Replace worn lift tapes and ladder cords as necessary to ensure smooth mechanical operation.

6. Commissioning & Integration

  • Calibration: Set electronic end-limits (upper/lower) for every unit.
  • Testing: Perform three full cycles (Up/Down/Tilt) per window to ensure defect-free operation.
  • System Integration: Ensure new motors are integrated into the existing building control or radio systems.

7. Waste Disposal (Swiss Compliance)

  • Swiss Codes: Disposal must comply with vREG/ORDEA (Electrical Waste) and VeVA/OMW (Waste Movements).
  • Recycling: Deliver old motors and aluminum scrap to authorized SENS eRecycling or Swico collection points.
  • Evidence: Contractor shall provide official disposal certificates (Entsorgungsnachweis).

8. Cleaning & Handover

  • Internal Cleaning: Clean internal glass surfaces and aluminum slats before closing the sash.
  • Final Report: Provide a list of all units serviced, including specific motor model numbers used.
Background
The contract is issued for the refurbishment of 104 integrated Venetian blinds located in an office building in Bern, Switzerland. The goal is to provide a turnkey solution that restores 100% motorized functionality while preserving the thermal, acoustic, and aesthetic integrity of the WICONA window units.

The project involves working with Warema Type 1.16/25/35.07 (24v motor) systems integrated within WICONA WICLINE Aluminum Composite Windows.

Work Details
The contractor is required to perform a comprehensive inspection, repair, and motor retrofit of the Venetian blinds. The bid must be all-inclusive, covering labor (technician, electrician, logistical personnel), materials (motors, cables, lift tapes, ladder cords, hardware), equipment (tools, safety gear), transportation (travel costs and shipping), and fees (disposal fees and permits).

Key tasks include:
- Moving office furniture for access;
- Providing surface protection during work;
- Ensuring only certified electricians perform electrical tasks;
- Implementing Lockout/Tagout procedures;
- Inspecting and maintaining hardware;
- Replacing failed motors with compatible alternatives;
- Calibrating electronic end-limits for each unit;
- Testing the operation of each window;
- Integrating new motors into existing control systems;
- Complying with Swiss waste disposal regulations;
- Cleaning internal surfaces post-service;
- Providing a final report listing serviced units and motor model numbers.

Place of Performance
Office Building – Bern, Switzerland

Bidder Requirements
Bidders must ensure that all electrical work is performed by certified electricians according to Swiss regulations. They must implement strict Lockout/Tagout procedures for safety during operations. Additionally, contractors are responsible for compliance with Swiss waste disposal regulations and must provide official disposal certificates.

Overview

Response Deadline
Aug. 5, 2026, 10:00 a.m. EDT Due in 21 Days
Posted
July 14, 2026, 4:01 p.m. EDT
Set Aside
None
Place of Performance
Bern, CH-BE 3007 Switzerland
Source
Current SBA Size Standard
$19 Million
Est. Value Range
Experimental
$90,000 - $180,000 (AI estimate)
On 7/14/26 U.S. Embassy In Bern issued Special Notice PR16077115 for Chancery 3003 Integrated window blinds (104) due 8/5/26.
Primary Contact
Name
Paul Aeschlimann   Profile
Phone
None

Secondary Contact

Name
Anna Peglow   Profile
Phone
None

Documents

Posted documents for Special Notice PR16077115

Opportunity Assistant


AI Analysis

Incumbent or Similar Awards

Potential Bidders and Partners

Awardees that have won contracts similar to Special Notice PR16077115

Similar Active Opportunities

Open contract opportunities similar to Special Notice PR16077115

Experts for Chancery 3003 Integrated window blinds (104)

Recommended subject matter experts available for hire

Additional Details

Source Agency Hierarchy
STATE, DEPARTMENT OF > STATE, DEPARTMENT OF > US EMBASSY BERN
FPDS Organization Code
1900-SZ230
Source Organization Code
100178026
Last Updated
July 14, 2026
Last Updated By
sandswc4@state.gov
Archive Date
Aug. 30, 2026